Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.4 LAccepted-AOC 1003 SUB TREASURY DEVIKULAM | ₹3.4 L | 1 | Accepted-AOC l1 |
| 2 | Rejected-Technical VALAYAM GRAMA PANCHAYATH KERALA | KOZHIKODE | KERALA | 673517 | - | - | Rejected-Technical L2 |
| Sl No | Description | Qty | Unit | Rajan L1 | BALAN L2 |
|---|---|---|---|---|---|
| 1.00P 286-MAINTENANCE OF PARACHAL MUKKU PADIKKOTH PUMP HOUSE ROAD | |||||
| 1.00 | 3.2:Preparation of Foundation for Embankment <br> Scarifying Existing Bituminous Surface to a Depth of 150 mm by Mechanical Means <br> Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4. | 140 | sqm | 14.94 ₹2,091.60 | 14.94 ₹2,091.60 |
| 1.00 | 4.1.A.1:Granular Sub-base with Well Graded Material (Table 400.1) <br> (A) By Mix in Place Method <br> Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. <br> (i) For Grading I Material | 10.5 | cum | 3,124.47 ₹32,806.94 | 3,124.47 ₹32,806.94 |
| 1.00 | OD268840/2025-2026:Granular sub-base/base/surface course with local materials (Table 400.13) by mix in placemethod normal. Construction of granular sub-base by providing local material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method withrotavator at once and compacting with smooth wheel roller to achieve the desired densitycomplete as per Clause 401.4 as per TechnicalSpecification Clause 408.
(ii) Using Gravel mix soil. | 3.5 | cum | 190.13 ₹665.46 | 190.13 ₹665.46 |
| 1.00 | 4.9:Wet Mix Macadam <br> Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. <br> By Mechanical Means with 1 km lead | 21 | cum | 3,504.6 ₹73,596.60 | 3,504.6 ₹73,596.60 |
| 1.00 | 75.5.1.1pb:Prime Coat - Low porosity - With Packed Bitumen Rates <br> Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 | 140 | sqm | 80.21 ₹11,229.40 | 80.21 ₹11,229.40 |
| 1.01 | 5.5.B.2a:Modified Penetration Macadam 75 mm thick using Bitumen S-65 <br> Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506. <br> (B) 75 mm thick :- (II) Bitumen (S-65) | 48.44 | sqm | 386.45 ₹18,717.71 | 386.45 ₹18,717.71 |
| 1.01 | 75.5.2.3pb:Tack Coat - With Packed Bitumen Rates <br> Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503. | 140 | sqm | 18.76 ₹2,626.40 | 18.76 ₹2,626.40 |
| 1.01 | 75.5.2.1pb:Tack Coat - With Packed Bitumen Rates <br> Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. | 508 | sqm | 15 ₹7,620 | 15.65 ₹7,950.20 |
| 1.01 | 75.5.11.1.A.2pb:Mix Seal Surfacing - Manual Means - Type A - Bitumen S-65 - Packed Bitumen Rates <br> Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509 <br> By Manual Means <br> Type A <br> (II) Bitumen (S-65) | 648 | sqm | 291 ₹1.9 L | 291.87 ₹1.9 L |
Tender Value
₹3.4 L
EMD Value
₹8,470
Closing Date
18 Oct 2025, 4:00 pmClosed
SHEELA P R
Assistant Engineer LIDEW Section Chekkiad GP
Annual Plan-CHEKKIAD GP 2025- 2026 P 286-MAINTENANCE OF PARACHAL MUKKU PADIKKOTH PUMP HOUSE ROAD-WARD 3-General Civil Work
2025_LSGD_806931_1
286/2025-26/AE/LIDEW/CKD
Open Tender
Civil Works - Roads
180 days
CHEKKIAD GRAMA PANCHAYATH
Please refer Tender documents.
7 documents required · 7 mandatory
₹750
Yes
₹8,470
Yes
24 Feb 2026
10 Oct 2025
21 Oct 2025
10 Oct 2025
18 Oct 2025
10 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1344550.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.06 MB
Tendernotice_2.pdf
PDF • 0.06 MB
Tendernotice_3.pdf
PDF • 0.03 MB
BOQ_1344550.xls
BOQ • 0.30 MB
viewsbd.pdf
Tender Documents • 1.73 MB
FOT.pdf
Tender Documents • 0.02 MB
PRELIMINARY.pdf
Tender Documents • 0.08 MB
AFFIDAVIT.pdf
Tender Documents • 0.06 MB
Download all tender documents and submit your bid