Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.1 CrAdmitted-Finance | ₹2.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.2 Cr+₹4.9 L (2.28%)Admitted-Finance | ₹2.2 Cr+₹4.9 L (2.28%) | L2 | Admitted-Finance |
| 3 | L3₹2.2 Cr+₹5.1 L (2.39%)Admitted-Finance | ₹2.2 Cr+₹5.1 L (2.39%) | L3 | Admitted-Finance |
| 4 | L4₹2.2 Cr+₹10.9 L (5.11%)Admitted-Finance | ₹2.2 Cr+₹10.9 L (5.11%) | L4 | Admitted-Finance |
| 5 | L5₹2.2 Cr+₹11.4 L (5.37%)Admitted-Finance 217 1ST FLOOR SRI SAI TOWERS ECIL X ROAD ECIL X ROAD MEDCHAL MALKAJGIRI DIST TELANGANA 500062 | MEDCHAL MALKAJGIRI | TELANGANA | 500062 | ₹2.2 Cr+₹11.4 L (5.37%) | L5 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹2 L
Closing Date
30 Mar 2020, 3:30 pmClosed
R SANTOSH KUMARDy.Mgr (CS)
Simhadri Thermal Power Project P.O. SIMHADRI VISAKHAPATNAM 531020
Annual Maint Works in Bottom Ash DAETP Fly Ash Disposal Systems ASPH AndAsh Disposal Lines of Stage 3 for 2020 22 at NTPC Ramagundam
2020_NTPC_32561_1
NTPC/SSC - SR(Simhadri)/9900197362
Limited
Serv - Others
Service
730 days
Ramagundam Super Thermal Power Station
5 documents required · 5 mandatory
₹0
₹2 L
Yes
1 Apr 2020
21 Mar 2020
31 Mar 2020
21 Mar 2020
30 Mar 2020
21 Mar 2020
21 Mar 2020 - 26 Mar 2020
Amount
TOTAL VALUE OF THE WORK
NOORIE ENGINEERS
ABC ENGINEERING WORKS
M/S A B ASSOCIATES
M/s ELINI ENGINEERING WORKS
Adore Contractors Private Limited
BOBBY ERECTORS
TECHNOCARE ENGINEERS
STAR ENGINEERING COMPANY
prabhat engineering works
APT ENGINEERING
Gorakhpur Construction Company Pvt Ltd
MUNESHWAR NAVIN CONSTRUCTION
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .