Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.1 LAdmitted-Finance | L1 | Admitted-Finance |
Tender Value
₹2.9 L
EMD Value
₹5,840
Closing Date
15 Jun 2026, 6:00 pmClosed
Er. Rakesh Kumar
EXECUTIVE ENGINEER PWD (RnB) DIVISION SAMBA
Please refer to BOQ
2026_PWDJK_311830_11
15 of 2026-27 dated 08-06-2026
Open Tender
Civil Works
Percentage
Samba
Please refer Tender documents.
3 documents required · 3 mandatory
₹600
EXECUTIVE ENGINEER PWD (RnB) DIVISION SAMBA
₹5,840
EXECUTIVE ENGINEER PWD (RnB) DIVISION SAMBA
6 Aug 2026
9 Jun 2026
16 Jun 2026
9 Jun 2026
15 Jun 2026
9 Jun 2026
10 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Drain clearance in all kind of soil including its disposal upto 3 km | 36 | Cum | 200 | ₹7,200 |
| 2 | Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto
1.5 m in -All kinds of soil. | 200 | Sqm | 24.12 | ₹4,824 |
| 3 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared. | 16,200 | Sqm | 12.49 | ₹2,02,338 |
| 4 | Supply and laying of River Bed Materials including leveling, dressing, watering & consolidation in layer 20cm in depth each layer consolidated with power road roller of minimum 8 tonne capacity incl. carriages complete | 60 | Cum | 300 | ₹18,000 |
| 5 | Supply of machinery/JCB including POL for maintenance of road as directed by engineer-in-charge. | 20 | Hrs. | 950 | ₹19,000 |
| 6 | Providing and laying non-pressure of specified class R.C.C. pipes including collars/spigot jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement: 2 fine sand) including testing of joints etc. complete. Non-pressure NP-3 class (Medium duty) R.C.C. pipes, 600 mm dia. R.C.C. pipes | 15 | Mtr. | 2,415.8 | ₹36,237 |
| 7 | Engaging of Labour for general upkeeping of different roads. | 9 | No. | 500 | ₹4,500 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.78 MB
BOQ_1009632.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .