Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹25.0 L
EMD Value
₹24,997
Closing Date
4 Feb 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CEO & SE (O&M), DGVCL, Circle Office Valsad
Carrying out Interior works for Front office for Navsari City Division under Valsad Circle DGVCL
270084
DGVCLCVLS/NCW/e-file/4438/2025/3458/Civil
Open
Civil Works - Others
Works
Valsad
11 documents required · 10 mandatory · 1 optional
₹2,360
Yes
DGVCL Valsad
₹24,997
Yes
28 Jan 2026
28 Jan 2026
28 Jan 2026
4 Feb 2026
28 Jan 2026
NAME OF WORK:-“ Carrying out Interior works for Front office for Navsari City
Division under Valsad Circle DGVCL”
TIME LIMIT:- Six months
Name of Tenderer’s:-
1) TENDER FEE :- 2000/- +18% GST = Rs
Tender fee DD No. Rs. .
Receipt No-___________ Book No-____________
2) Earnest Money Deposit Rs. 24,997.00/-.
EMD DD No. Dtd. .
Receipt No-___________ Book No-____________
Special note for prequalification
Name of work: “Carrying out Interior works for Front office for Navsari City
Division under Valsad Circle DGVCL”
Contractor should submit evidence as a registered civil works contractor in appropriate class With
Govt./ Semi. Govt. i. e. Class “E-1” or enlisted with DGVCL/MGVCL/UGVCL/PGVCL /GEB / GSECL/
GETCO / DISCOM / Central / State Government / Semi Government in similar category.
1. Average Annual Financial turnover during the last 3 years, ending 31st March of the previous
financial year, should be at least 30% of the estimated cost (Turnover Certificate).
2. Experience of having successfully completed similar works during last 5 years ending last day of
month previous to the one in which applications are invited should be either of the following:-
a. Three similar completed works costing not less than the amount equal to 40% of the
estimated cost.
b. Two similar completed works costing not less than the amount equal to 50% of the
estimated cost.
c. One similar completed work costing not less than the amount equal to 80% of the estimated
4. The bidder have to submit the copies of similar nature work completion certificate showing
name of owner, name of work, order amount, final completion amount, time limit
commencement date and completion date.
5. Latest Bank Solvency Certificate of minimum 20% amount of tender not older than one year
of opening of technical bid.
6. Separate provident fund code number towards registration of your firm with Regional P.F.
Commissioner if applicable.
7. EMD & Tender fee as described in the tender document.
8. The contractor who has been blacklisted with GUVNL/ DGVCL/ MGVCL/ UGVCL / PGVCL/ GSECL/
GETCO shall not be considered.
9. The bidder must have Goods and Service Tax (GST) Registration with “ACTIVE” status & PAN NO
and same shall be submitted along with the Tender only. The tender of the bidder without GST
Registration will not be considered.
10. cancel check
Bidder has to upload all the above documents by scanned copies of original
(Notarized/Self attested copies of original) documents with bid and no physical
documents to be called from bidder.
It shall be sole responsibility of the bidder that the uploaded scanned documents
(in PDF form) remain legible and should not be password protected.
The Bidders shall submit documentary evidences in support of all above Qualification criteria with
duly signed tender copy, failing which the bid will be rejected. The Bidder, who is newly registered
with the Govt./Semi Govt. will be considered with due exemption in experience and turnover except
that all the documents is to be submitted, failing which the bid will be rejected
No tender shall be accepted / opened in any case after due date and time of receipt of tender,
irrespective of delay due to postal services or any other reasons and the company shall not assume
any responsibility for late receipt of tender.
The above documents will be analyzed and after satisfaction, the price bid will be opened online
only. DGVCL may verify the documents, experience certificates with authority who have issued such
certificates / details.
Sign and seal of supplier
Tender Notice No. D G V C L C V L S / N C W / E - F I L E / 4 4 3 8 / 2 0 2 5 / 3 4 5 8 / C I V I L
Notice Inviting Online Tender
Details about Tender:
Department Name Automatic System Generated
Circle/Division Automatic System Generated
IFB No / Tender Notice No. DGVCLCVLS/NCW/e-file/4438/2025/3458/Civil
Name of Project “Carrying out Interior works for Front office for
Navsari City Division under Valsad Circle DGVCL.”
“Carrying out Interior works for Front office for
Navsari City Division under Valsad Circle DGVCL”
Estimated Contract Value (INR) Rs. 24,99,633.88 /-
Period Of Completion(in Months) Six months
Mode of Tender Open
Tender Currency Type Single
Tender Currency Settings -----------
Joint Venture Not Applicable
Rebate Not Applicable
Sector Category Power and Energy
Form Of Contract Works
Product Category Civil Works
Amount Details:-
Bid Document Fee : Rs. 2360 /-
Bid Document Fee Payable To : DGVCL Payable @ Valsad
Bid Security/EMD (INR) : Rs . 24,997.00 /-
Bid Security/EMD In Favour Of : DGVCL Payable @ Valsad
Tender Dates :-
Bid Document Downloading Start Date Automatic System Generated
Bid Document Downloading End Date 04/02/2026; 18:00 Hrs.
Pre Bid Meeting (If require) NA
Last Date & Time for Receipt of Online
Bid Validity Period 180 Days
Submission of only Physical EMD and Tender Fee
document during office hours should be submitted on
or before 10/02/2026 in the Office of CEO & SE
(O&M), DGVCL, Circle Office Valsad. Phone No.: -
All the other required documents mentioned in the
special note for prequalification are to be uploaded
scanned in PDF format in n-procurement only. No
physical submission is acceptable by DGVCL.
Bid Opening Date 11/02/2026; 11:00 am ( if possible )
Other Details:-
Officer Inviting Bids : The CEO & SE, DGVCL Circle Office, VALSAD.
Bid Opening Authority : The CEO & SE, DGVCL Circle Office, VALSAD.
DAKSHIN GUJARAT VIJ CO. LTD
CIRCLE OFFICE VALSAD,
VASHIER ROAD, COUNTRY CLUB
Contact Details : 02632-253936/244410
GENERAL TERMS & CONDITION:
Payment of tender fees can be accepted by D.D/ RTGS/NEFT.
DGVCL Valsad Circle Bank Details
Name of the bank: - STATE BANK OF INDIA Station road, Branch (1631) “Sakar
Building” Halar Road, Valsad.
Current A/C No. :-
ISFC Code No. :- SBIN0001631
In case of cash payment (up to Rs. 10000/-), the scanned copy of cash receipt shall have to
be uploaded with the bid.
In case of payment through DD/Banker’s cheque of any local National Bank in favors of
DGVCL circle office situated at Valsad, the scanned copy of original document shall have to
be uploaded with the bid and original copy of the same will have to be submitted at the
office address specified in the tender document, within 5 days bid opening.
Payment of Earnest Money Deposit (EMD) can be accepted by RTGS/NEFT/DD. (Account
details as mentioned in the condition of tender fee)
In case of cash payment (up to Rs. 10000/-), the scanned copy of cash receipt shall have to
be uploaded with the bid.
In case of payment through DD/Banker’s cheque/Pay Order/Bank Guarantee of any local
National Bank in favors of DGVCL circle office situated at Valsad, the scanned copy of
original document shall have to be uploaded with the bid and original copy of the same will
have to be submitted at the office address specified in the tender document, within 5 days
SECURITY DEPOSIT:-
The successful tenders shall be required to further remit amount equivalent to 5% of the
order value towards security deposit. This amount will be payable to Navsari City Division.
It will be refundable after completion of the contract & on production of no objection
The successful tendered shall also have to enter into agreement with the DGVCL towards
execution of the contract on non judicial stamp paper of appropriate value (cost of stamp
Rs.300/- shall be borne by the contractor). This agreement will be executed as per
standard format of the Navsari City Division before commencement of the contract.
INDEMNITY BOND:-
The successful contractor shall have to indemnity to the DGVCL for the entire liability of the
employee engaged in the work by contractor. The indemnity should also cover liability
towards road accident done by vehicles of the contractor during the execution of the work.
For this purpose an indemnity bond shall have to be given in standard format on non-
judicial stamp paper of appropriate value as per rules (cost of stamp Rs.300/- shall be born
by the contractor)
TERMINATION OF CONTRACT:-
The contractor is found to be lacking in execution of the work in any manner the company
reserves the right.
1) To get work done through any other agency at the risk and cost of the contractor.
2) To cancel the unexecuted part of the contract without any notice and towards this
place the order for that to any other agency at the risk and cost of defaulter, default by
Circle Office, Valsad for non execution of contract, contract shall be terminated and
carry out the work as per condition of booklet of “tenders and contract for works” and
SD paid shall be forfeited and the contractor shall be blacklisted.
Sub : “Carrying out Interior works for Front office for Navsari City Division under Valsad Circle
1) Contract booklet of DGVCL for “Detailed specification of terms” and General terms
and conditions of work are available for reference in the office of The C.E.O. & S.E.
(O&M), DGVCL Circle Office, Valsad.The contractor quoting for this tender is
deemed to have gone through this book of contract booklet and same will be
treated as binding of him.
2) The rate should be quoted both in words and figure as per units specified in the
Tender, should there be any discrepancy between the rates quoted in words and
figure. The rates quoted and words should be prevailing. Further should there be
any discrepancy between rates and amount the rates will prevail.
3) For reinforced cement concreting, centering will have to be done and also mixture
machine and vibrators used, without which the work will not be allowed. Nothing
extra will be paid for excavation other than mentioned in drawings &
4) Quantities mentioned in scheduled-B are approximate and before ordering any
materials, prior permission from the Deputy Engineer in charge shall be taken and
nothing extra will be paid for the materials collected in excess.
5) Where company cannot provide water supply, the contractor will have to make his
own arrangement for the water required for construction and other purposes, and
the company does not take any responsibility for the same. Testing materials
should be required before using row materials by contractor at his own cost.
6) However, during the course of work, later on if company is in position to supply
water to the contractors, the contractor may obtain water from the company in
such case the charges for the water supplied will be recovered at the rate of
percent of the cost of items as executed in which the water supplied by the DGVCL
is used as certified by the Engineer in charge.
7) As mentioned above if the contractor make his own arrangement for the water
required for the water required for the construction & other purposes & if the
contractor is getting water by drilling bore wells or construction well in the
premises of the company or by providing his own pump on the existing Bore
wells/well of the company &uses this water for civil works, then company will
recovered royalty at 0.25 % of the cost of the items executed in which the water
supplied by the Company is used / consumed .The contractor however will not be
allowed to use water by this way without the permission in writing from engineer in
8) The successful contractor has to execute a work agreement with the company on
stamp paper in Prescribed performa of the company ,the cost of stamp papers are
to be borned by the contractor.
9) The successful contractor has to give indemnity Bond on stamp papers in the
prescribed performa of DGVCL. The cost of such stamp papers is to be borned by
the contractor.
10) The prices are inclusive of all government taxes as per government notifications but
except service tax. You will have to quote service tax extra.
11) In case of silent or nothing written or (-) or blank in service tax, it would be
understand that you have quoted rate including service tax. It means your liability
will be paid by you and liability of DGVCL will be deducted from your bill.
12) Any activity not specifically mentioned in the tender but necessary in the opinion of
Engineer In charge of work must be carried out for successful completion of the
job, on getting approval competent authority of DGVCL.
13) Before taking up construction activity, the agency has to cut the trees which
obstruct the working of any diameter , bushes , vegetations, roots , plants, shrubs,
grass etc including stacking and crediting to DGVCL as directed with no extra cost.
14) No escalation towards labour and material/fuel shall be paid in the execution of the
15) The contractor shall arrange for insurance coverage for all employees diploid for
the said work in amount approved by the company and sufficient to protect against
the following risk arising during the work. Accidents and professional and non
professional sickness of all labours and persons engaged in the work as required by
the law pursuant to workmen’s compensation act 1923 or revised version including
injury or death to the third person including without limitation injury of death
caused by any of the construction aids or vehicles or rented machinery, equipments
used by the contractor or sub contractor weather at the site or elsewhere. Damage
to the contractor’s tools, machinery, construction equipments, formworks,
scaffolding materials etc. due to flood, earthquake or any such cause, damage to
the existing permanent structure of the company or nearby villages, equipments of
the company or of the co-contractor working in the area for other works. All the
above conditions referred for the insurance covered, shall be in effect from the
date of commencement of the work until the company has accepted the work. In
the policies covering the insurance referred above, the company, contractor and
the sub contractor shall be as co-insured where possible. The cost of insurance
shall be borne by the contractor.
16) The electric power can be obtained from DGVCL at site at one mutually agreed
point, as a temporary connection at free of cost. Further distribution will have to be
carried out by the contractor as per requirement at their own cost. The necessary
bills for consumption charges will be borned by the contractor and the same will be
recovered as per the tariff rate of the DGVCL from time to time as per company’s
17) If your work is found not satisfactory or not progressing according to scheduled
programme , DGVCL may take such actions as may be deemed fit to see that the
work is completed in time at your risk and cost
18) The Technical Bid of tender are required to be submitted on or before date
04/02/2026 up to 18:00 Hrs in online only. Submission of only Physical EMD and
Tender Fee document during office hours should be submitted on or before
10/02/2026 by R.P.A.D./ Speed post at the following address :
The Chief Executive Officer & Superintending Engineer (O&M),
Dakshin Gujarat Vij Company Ltd.
VASHIER ROAD, COUNTRY CLUB
VALSAD-396001, VALSAD -
With following remarks on top of envelope Tender Offer for “Carrying out Interior
works for Front office for Navsari City Division under Valsad Circle DGVCL.”
Signature of Contractor
DGVCL Circle Office, Valsad
SPECIAL CONDITION FOR USE OF CEMENT IN WORK
1. The rates in Schedule-B are inclusive of cement cost. Contractor has to purchase fresh
53 grade cement confirming to IS 8112 and of approved brand by DGVCL.
2. Contractor has to construct kachha godown due to any work so that cement bags can
be preserved properly to avoid damages due to any kind of water/weather.
3. Contractor has to bring sufficient quantities of cement bags and sufficient quantities of
cement bags to maintain progress of work. The work should not suffer for want of
4. Cement should give the required strength of cement concrete.
5. To bring sufficient and timely cement at site is fully responsibility of contractor .
Nothing extra will be paid on account of any reason to maintain progress of work and
to complete the work in schedule time.
6. Contractor has to submit material account for consumption of cement used with every
bill. In case of not submitting the same, bill will not be passed. Party has to submit the
copy of cement /purchase bill along with R.A. bill / Final bill.
7. No negative variation will be allowed for the consumption of cement than prescribed as
per booklet of technical specification of company / mix design & nothing will be paid
extra for over consumption.
8. Contractor is fully responsible for safety of cement at site. Nothing will be paid on
extra on account of safety.
9. If company’s authorized representative wants to check cement stock at site
contractor has to allow for the same at any time.
10. Contractor has to maintain day to day cement consumption / balance account at site.
11. As far as possible, contractor has to maintain supply cement of only one brand & grade
throughout the work & on account of closure / shortage of approved brand, cement of
other brand in accordance of condition no. (1) Will be allowed by Engineer- in- charge.
12. Minimum cement consumption considered for cement concrete having grade of M-15 /
M-20 /M-25 is 300 kgs/320 kgs/340 kgs respectively. Contractor has to use minimum
cement as above. Contractor should not use less than the prescribed quantities of
cement even in the case of mix design recommends lower quantity.
13. Contractor will be allowed to carry out work only after physical verification of cement
brought at site.
GENERAL CONDITIONS: For issue of materials
1. No any material shall be supplied by DGVCL
Signature of Contractor
DGVCL Circle Office, Valsad
TERMS & CONDITIONS REGARDING INDUSTRIAL LAWS & OTHER RELATED MATTERS.
1. Wages to be paid & time of payment etc. by the contractor:-
The contractor shall pay minimum of as per latest minimum wages act or as may be
specified hereafter or rates fixed under the minimum wages act whichever is higher. The
wages of every contract labour employed by him under this contract shall be paid by him
before the expiry of 7th day of the last of the month in respect of which the wages are
payable (i.e wages of month have to be paid him in the first week of the next month.) The
payment shall be discharge in the presence of Management representative during the
working hours in factory premises & the contractor shall get entries certificated in the
register of wages by the representative of the Board. Any default will result in cancellation of
contract forthwith or else the contractor shall be punishable to the extent of Rs. 100 / fine
The Contractor shall give his telephone number and address to the DGVCL, so that in case
of labour trouble etc. the contractor can be contacted.
2. Labour Laws:-
Person below age of 18 years shall not be employed for the work.
No female worker shall be employed in the night shift between 7 p.m to 6 a.m
Contractor shall maintain a valid labour license under the contract labour (Regulation &
abolition) act for employing necessary manpower to be required by him. In the absence of
such license the contact shall comply with as under.
1. Payment of contribution by way of employer’s contribution towards provident fund, family
pension scheme, Deposit linked insurance scheme, Administrative charges etc. at the rates
applicable from time to time by Government of Gujarat / Government of India or other
statutory Authority.
2. Payment of deposit in respect of each contract labour at the rate of Rs.30/ with the office
of frame there under of labour as per control labour. (Regulation & abolition) Act.
3. License fee as prescribed under the control labour (Regulation & abolition) Act & rules
frame there under depend upon the number of workmen employed by the contractor.
4. Paid leave facility & wages as per the provision of the factories act at the rate of one day
for every 20 days of working.
5. Identity cards as prescribed under the facilities act with photo affixed there to the same
for identification.
6. Payment of retrenchment compensation notice pay & other liabilities as per industrial
disputes Act. Any payment to the contractor’s employees arising out of any claim or
disputes under the industrial dispute act 1947 or any other labour laws.
7. Payment of compensation in case of accident injury.
8. Provision of ereche if the female labours employed are more than 30 numbers.
9. Maternity leaves as per the provision of maternity Benefit Act.
The above are some of the major liabilities of the contractor in addition to other liabilities
prescribed under the various labour laws in force from statutory authorities like state
Government / Government of India which the contractor shall have to comply with.
3.Provident fund & Family pension scheme:-
The contractor shall submit along with his bill (month wise) a statement regarding deductions
against employees provident fund & family pension scheme in respect of each concerned
against employee. provident fund & family pension scheme at the rate of 8.33% ( or at the
rate made applicable by the Government from time to time ) of the wages. The contractor’s
contribution & his workers contribution towards provident fund, family pension scheme shall
be deposited by the contractor with Regional provident fund commissioner , Ahmadabad.
4.Deposit Link Insurance:-
The contractor shall have to deposit 0.5% of the wages in respect of employees who is a
member of the provident fund as the contribution to the Deposit link insurance scheme with
Regional provident fund commissioner, Ahmadabad.
5.Administrative charges:-
Administrative charges for monitoring provident fund A/C shall be deposited by the contractor
with Regional provident fund commissioner, Ahmadabad at the rates applicable.
Paid leave facilities:
Paid leave facility at the rate of one day of every 20 days worked by the contractor labour
shell be provided by the contractor to his workers. He shells maintain leave record/ leave card
for individual labour, which shall be duly verified and approved / certified by the authorized
officers of the DGVCL.
6.Workmen’s compensation fund & employer’s liability Insurance:-
The contractor shall cover all his employees under workmen’s compensation fund & under the
liability insurance.
The contractor shall employ adequate number of experience staff at site for daily supervision
& for maintenance of various register & records required under the law & contract. No
payment for supervision shall be admissible.
7.Contractor to Indemnity the DGVCL:-
The contractor shall indemnity the company & every member officer & employees of the
company also. Engineer in charge his staff against proceedings claims, demands, costs &
expenses what so ever arising out of or in connection with the matters referred herein above
elsewhere & against all actions. Proceedings claims, demand costs & expenses which may be
made against the DGVCL or Government for or in respect of or formance of his obligation
under the contract documents. The DGVCL shall not be liable for in respect of or in
consequences of any accident or injury to any workmen or other person in the employment of
contractor or his sub contractor & the contractor shall indemnity & keep indemnified The
company against all each damage & compensation & against all claims , demands,
proceedings costs, charges & expenses what so ever in respect thereof in relation there.
8.Work compensation & employer’s liability insurance:-
Insurance shall be affected for all the contractor’s employees engaged in the performance of
his contract if any of the work is subject the contractor shall require the sub contractor to
provide workmen’s employees unless such employees are covered under the contractor’s
The DGVCL reserves the right to terminate this date of contract at any time during its
pendency without giving notice of termination or any reasons thereof.
The DGVCL will be entitled to deduct directly from the bills, to be paid to the contractor any
sum payable by you & which sum / sums the DGVCL is required to pay a principal employer
on account of your default in respect all liabilities referred to in above clauses.
9. PENALTY FOR DELAY:
The time limit allowed for carrying out the work as entered in the tender shall strictly be observed
by the contractor and shall be reckoned from the date on which the order to commence the work is
given to the contractor. The work shall throughout the stipulated period of contract proceed with
due diligence (time being deemed to be essence of contract) and for delay, the contractor shall pay
compensation, an amount equal to half percent (0.5%) per one week/part of week on the work
carried after time limit out completed or on contract amount of work or such smaller amount as per
the decision of the Competent Authority of the DGVCL plus GST at 18% on penalty amount.
However, the total amount of compensation to be paid by the contractor, under the provision of the
However, the total amount of compensation to be paid by the contractor, under the provision of the
clauses shall not exceed 10% of the amount of contract value as decided by the competent
authority of the DGVCL. The penalty will be invariably deducted from the bills of the contractor and
no refund will be given unless the competent authorities approve the reduction the reasons for
delay attributable to DGVCL as well as to party will be brought out clearly while putting the proposal
for waiver reduction in penalty
10. WATER SUPPLY CONNECTION:
The contractor has to make his own arrangement of water for construction activity at his own cost.
However, if possible, the water supply from line of DGVCL will be given at one mutually agreed
point as per the contractor’s request. Further distribution will have to be carried out by the
contractor as per his requirements and at his cost. Water shall be supplied on chargeable basis and
recovery for water charges shall be made at two percent of the cost of items as executed in which
the water supplied by Company is used & as certified by the EIC. If the contractor drilling bore well
at his own cost, in the premises of Company after getting necessary approval and using water after
providing his own pump then company will recover royalty at ¼% of the cost of the items as
executed in which the water is used.
11. ELECTRICITY CONNECTION:
The electric power can be obtained from Dakshin Gujarat Vij Company Ltd., at site at one mutually
agreed point, as a temporary connection (connection only) at free of cost. Further distribution will
have to be carried out by the contractor as per requirements at their own cost. The necessary bills
for consumption charges will be recovered as per the tariff rate of Dakshin Gujarat Vij Company
Ltd. from time to time as per Company’s rules.
Signature of Contractor
DGVCL Circle Office, Valsad
Name of Work: “Carrying out Interior works for Front office for Navsari City Division under
Valsad Circle DGVCL.”
Sr. Descriprion Qty Unit Rate Amount in Rs.
1 Partition glass in Living Room/Bed 38.00 Smt 4959
Rooms/Bathrooms-Providing & fixing
12mm thk toughened extra clear float
glass partition including doors or
opening ( including of floor spring or
2 Providing and fixing horizontal/vertical 135.00 Sft 350
plywood partition with all outer and
inner plywood surface covered by 1mm
thick SF Laminate finish using 18 mm
thickwaterproof coating,antitermite,
antifading plywood selected by
Engineer in charge with necessary
hardware materials etc.
3 Providing and fixing vertical softboard 90.00 Sft 200
partition with frontside covered by
fabric and all other 3 outer and inner
sides covered by 1mm thick SF
Laminate finish using 12 mm thick
softboard& necessary hardware
4 Providing and fixing Artificial 30.00 Sft 160
grass/plants between 3’’ partition with
all required hardware materials etc.
5 Wooden Partition ( Full and Half 17.00 Smt 3803.66
Height) The scope includes supply and
erection/installation of the item on
site.The partition framework comprises
of 25X50mm MDF Section with vertical
and horizontal sections with necessary
gaps for cable management at regular
intervals,The penalare of 8mm MDF
stuck on both side of grid work with
outer side with. 8mm high pressure
laminate, The partition are fixed with
tongand grove arrangement, The
framework can be with panels made of
fabric, inboardpanel, laminated panels
or glass panels, The fabric panels are
made of 8mm. plain partical board/MD
Fladed with desired fabric/laminate,
The inboard panels are made of
12mm. softboard with, clubbed with
desired fabric, The Laminate panels
are made of 8mm. plain partical
board/MDF pressed with high pressure
laminate of 1mm, Wherever necessary
the cutouts are provided for mounting
the switches, for details and assembly
work refer drawings, laminate to be
approved by client/consultants. The
rateincludes cost of all labour, material
and with necessary tools, tackles,
adhesive, screws etc.
Anexternalbeading/visible teak
wood/veneer surfaces shall have
mattmelamine polish and internal
surfaces shall be finished with French
polish. for satisfactory completion of
this item.The rate also includes for all
necessary items required tocomplete
the job as per design/drawing
andclient/consultant's instructions.
6 Providing and fixing 35 mm thick 4.00 SMT 4850
Decorative type flush door shutters,
solid core construction excluding frame
and face veneer or ply-wood face
panels,1.0 mm thick laminate on both
sides including Stainless steel fixtures
and fastening and SS handle including
primer coat of approved quality and
two coats of oil painting etc complete.
7 Wall painting (three coats) with plastic 290.00 Smt 137.73
emulsion paint of approved brand and
manufacture on undecorated wall
surface to give an even shade
including throughly brushing the
surface free from mortar droppings
and other foreign matter and sand
papered smooth.
8 Finishing wall with weather proof 1305 Smt 132.6
exterior emulsion paint on wall surface
(two coats) to give an required shape
even shade after thoroughly brushing
the surface to remove all dirt, and
remains of loose powdered
materials.etc including apprlying wall
primer complete
9 Applying two coats of Birla or Asian 290 SMT 47.40
acrylic lappy (Putty) and two coats of
primer of approved brand and
manufacture on new wall surface to
give an even shade including throughly
brushing the surface free from mortar
dropping and other foreign matter and
10 Providing and laying granite slab 45 SMT 3644.07
18mm thick in skirting, riser of steps
and landing laid on a bed of 10mm
thick base of CM 1:4 ( 1 Cement :
Coarse sand ) finishes with flush
pointing in white or color cement.s
perKamrej Order W.O.
No:DGVCL/Civil/Kamrej
SDn/WO/8591/Dted. 11 May
11 P & L 24" x 24" vitrified 10 mm thick 150 Smt 1418.59
tile flooring over 20 mm (average)
base of cement mortar 1:6 ( 1 cement:
6 coarse sand) on new surface or
fixing on existing flooring by adhesive
material including dismentaling of
existing flooring and jointed with color
cement slurry including finised with
flush pointing & cleaning the surface
etc. complete for antiskit (upto 10 ton)
12 Providing & Applying polymer modified, 1930.00 SMT 522.2
flexible cementatious negative side
waterproofing coating with elastic
waterproofing polymers on interior wall
plaster surface in three coats @14.35
kg /10 sqm. one coat of self priming of
cementatious waterproofing
polymer(dilution with water in the ratio
of 1:1) and two coats of cementatious
waterproofing polymer (dilution with
water in the ratio of 3:1 ) after
scrapping and properly cleaning the
surface to remove pre-existing paint
film & loose particles till plaster is
visible, complete in all respect as per
the direction of Engineer-in-Charge.
13 Providing and fixing to wall ceiling and 20 Rmt 335.69
floor 10.0 Kg. F/Cm2 working pressure
poluthene pipes of the following
outside Dia. Low densidy, complete
with special falnge compression type
fittings, wall clipsetc. including making
good the wall ceiling and floor.(G)110
14 Providing and fixing screw down bib 2 Nos 184.98
taps of following size.(B) Brass
chromium plated screws down Bib
Tap. (i) 15mm dia.
15 Providing and fixing brass screw down 2 Nos 203.79
stop tap.(A) 15mm dia.
16 Providing and fixing pillar tap, capstan 4 Nos 305.67
head, screw down high pressure with
screws, shanks and back nuts. (i)
17 Providing & fixing white color flats 2 Nos 1430.8
vitreous China "Wash basin" of size
600 mm X 400 mm x 150 mm with
single hole for pillar tap with C.I. or
M.S. brackets (painted white )
including cutting holes and making
good the same, including 32 mm dia
C.P. brass waste
18 Providing and fixing wsh down water 1 Nos 2113.21
closet (European type, W.C. Pan) with
integral P or S trap including jointing
the trap with soil pipe in Cement
Mortar 1:1 (1-Cement : 1-fine sand)
(Seal and cover to be measured and
paid for separately)(A) vitreous China
Pattern :(i) in white colour
19 Providing and fixing water closet 1 Nos 2274.12
squatting Pan (Indian type W.C. Pan)
size 580mm (Earthwork, bed concrete,
foot reste and trap to be measured
and paid for separately) (A) Vitreous
China.(I) Long pattern = White colour
20 Providing and fixing chromium plated 2 Nos 252.26
brass half trun flush cock of approved
quality including fixing in pipe line etc.
complete.(i) 20mm dia.
21 Providing and fixing PVC SWR Nahni 4 Nos 566.65
trap IS 14735 for drain - 75 mm
diameter with jali of the following
nominal diameter of self cleansing
design with C.I scread down or hinged
grating including the cost of cutting
and making good the walls.
22 Providing laying and jointing in true 20 Rmt 71.93
line and level 15mm dia. U.P.V.C. Pipe
( SCH- 40) for cold water including
fittings make PRINCE / SUPREME /
ASTRAL / FINOLEX or equivalent as
approved by Engineer In Charge. Pipe
shall be fixed on the wall with the help
of clamp at every two metre C/C or
shall be concelled as directed including
necessary fittings etc. including testing
of pipe and joints and fixing the same
with adhesive solvent, including cost of
23 Providing laying and jointing in true 20 Rmt 90.93
line and level 25mm dia. U.P.V.C. Pipe
( SCH- 40) for cold water including
fittings make PRINCE / SUPREME /
ASTRAL / FINOLEX or equivalent as
approved by Engineer In Charge. Pipe
shall be fixed on the wall with the help
of clamp at every two metre C/C or
shall be concelled as directed including
necessary fittings etc. including testing
of pipe and joints and fixing the same
with adhesive solvent, including cost of
24 Providing and fixing S.W. gully trap 2 Nos 1279.40
with C.I. grating brick masonry
chamber and water tight C.I. cover
with frame of 300mm x 300mm size
(inside) with standard weight.(i)
Square mouth traps. (A) 100mm x
100mm size P type. (upto 10 ton)
25 Constructing brick masonry chamber 2.00 Nos 2903.89
for underground C.I. Inspection
chamber and bends with briocks
having croshing strength not less than
35Kg. Cm2 in C.M. 1:5 C.I. cover with
frame (Light duty) 455mm x 610mm
intenal dimensions total weight of
cover with frame to be not less than
38Kg. (Wt. of cover 23 Kg.) and Wt. of
frame 15Kg. ) (R.C.C. top slabe with
1:2:4 mix (1-cement :2- coarse sand
:4-graded stone aggregate 20mm size)
foundation concrete 1:5:10 inside
plaster 15mm thick with cement
mortar 1:3 finished smooth with a
floating coat of neat cement on walls
and bed concrete etc. complete.(i)
Inside dimensions 455mmx 610mm
and 450mm deep for single pipe line.
(more than 10 ton)
26 Providing laying (to level or slopes) 10 Rmt 353.20
and jointing reinforced concrete Light
duty non-pressure pipes I.S. class NP2
of the following internal diameter with
collars and butt ends prepared for
collar joints including testing of joints
complete.(C) 250mm (upto 10 ton)
27 Providing and fixing Urinal or approved 2 Nos 1051.66
quality including conecting the Urinal
with waste pipe , tap etc. complete.(A)
White earthenware flat back or
corner type size 430mm x 260mm x
28 Removing any type of 1600.00 Smt 11.47
distemper/plastic
emulsion/exterior/wood paint by a
washing and scraping and sand
papering the wall surface smooth
including necessary repairs to
scratches complete.
29 Extra over item 42 for removing dry oil 130.00 Smt 1.62
bound distemper on ceilings and
30 Dismentaling tiled of stone floors laid 177.00 Smt 48.92
in mortar including stacking of
serviceable materilas and disposal of
unserviceable materials with all lead
31 Dismantling santtary fittings like wash 10.00 Nos. 411.67
basin . W.C. pan Indian and European
type, flushing tank etc. including
stacking the materials with all lead
32 Providing and fixing wooden file 44.00 SMT. 8000.00
storage with openable shutter with
mm deep shelves partition and sides
with all outer and inner plywood
surface covered by 1mm th. SF
laminate finish using 18mm th. vertical
horizontal and shutter, 12mm th. back,
shelves commericial plywood approved
make, 01 mm th. SF finish laminate,
teakwood liping, SS conciled handle,
sliding lock & necessary hardware
materials etc. inside and liping french
polish finish complete in all respects by
engineer in charge.
33 Double layer Roller Blinds 12.00 SMT 2,200.00
Providing and installing Zebra double
layer roller blind Polyester corded
including all fixtures.
34 Misc. work/Unforseen work if required 1.00 JOB 1,00,000
to be carried out during execution of
the work which are assential and
required at stage of working such as
Electrical work,Furniture work,
Landscaping work, Plumbing work,
Flase ceiling work, colour work and
misc. civil work as per instruction of
Engineer in charge.
Note:- Above rates are excluding GST. GST will be paid extra on above rates as per
prevailing Govt. rules.
Signature of Contractor
DGVCL Circle Office, Valsad
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
E- Draft Tender.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .