| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹33.1 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹33.2 L+₹15,921.80 (0.48%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | Rejected-Technical ALOOR THAYALTHOTTY HOUSE MULIYAR | - | Rejected-Technical L3 | |
| 4 | Rejected-Technical STAR NAGAR THEKKIL FERRY BEVINJE KASARAGOD 671541 | KASARAGOD | KASARAGOD | KERALA | 671541 | - | Rejected-Technical L6 | |
| 5 | Rejected-Technical | - | Rejected-Technical L9 |
Tender Value
₹41.9 L
EMD Value
₹50,000
Closing Date
18 Mar 2023, 6:00 pmClosed
Executive Engineer
Office of the Executive Engineer Harbour Engineering Division Kannur Head Quarters Hospital (P.O) Kannur-670017
Road formation, DR Side protection, Earth and Quarry muck filling and Pipe culvert
2023_HED_563921_1
ET/23/HED/EE/KNR/2022-23
Open Tender
Civil Works - Roads
Item Rate
210 days
Mullakkodi
Please refer Tender documents.
8 documents required · 8 mandatory
₹3,260
₹50,000
Yes
3 Jun 2023
4 Mar 2023
21 Mar 2023
4 Mar 2023
18 Mar 2023
4 Mar 2023
Amount
Construction of road
2.1 : Clearing Grass and Removal of Rubbish Clearing grass and removal of rubbish up to a distance of 30m outside the periphery of the area as per Technical Specification Clause 201. By Manual Means
3.15.1 : Compacting Original Ground <br> (i) Compacting original ground supporting embankment <br> Loosening, Levelling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Tables 300.1 and 300.2 for embankment construction as per Technical Specification Clause 301.4.1.
3.4 : Construction of Embankment with Material Obtained from Borrow Pits <br> Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5
11.1.1.1 : Excavation for Structures Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. I.Ordinary soil (i)Upto 3 m depth
11.4.1.1 : Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 I.P.C.C grade M 10 (i)Nominal mix 1:3:6
11.4.4 : Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203IV.R.C.C grade M 20
11.8 : Supplying, fitting and placingTMT bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202
Appurtenance works
60.7.2 : DR PACKING Under foundation - Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at site.
19.35.1 : Providing and laying Non Pressure NP-3 class (Medium duty) R.C.C. pipes including collars/spigot jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement : 2 fine sand) including testing of joints etc. complete.450 mm dia RCC pipes.
19.35.2 : Providing and laying Non Pressure NP-3 class (Medium duty) R.C.C. pipes including collars/spigot jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement : 2 fine sand) including testing of joints etc. complete.600 mm dia RCC pipes.
60.7.1 : DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
51.2.3 : Filling with Quarry Muck <br> Filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the CBR value of subgrade
P V DIVAKARAN
ABDULLA A T
K. P. BIJU
SHAFEEQ C.A
CM ASHARAF
SAJITH P P
P P MANOJ
FERRO ROLLS AND MELTS
Bidder Name
CM ASHARAF
P V DIVAKARAN
SAJITH P P
P P MANOJ
SHAFEEQ C.A
FERRO ROLLS AND MELTS
K. P. BIJU
LIJILKUMAR POLA
ABDULLA A T
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_831429.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .