| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹81.1 LAccepted-AOC 54 PON NAGAR ARAVAKURICHI KARUR | ARAVAKURICHI | KARUR | TAMIL NADU | ₹81.1 L | L1 | Accepted-AOC Below Est rate |
| 2 | L2₹81.4 LRejected-Finance | ₹81.4 L | L2 | Rejected-Finance Above Est Rate |
| Sl No | Description | Qty | Unit | Bharathi Construction L2 | SELVAKUMAR CONSTRUCTIONS L1 |
|---|---|---|---|---|---|
| 1.00Name of the work : Upgradation the road from Rengapalayam ODR road to Seethapatty Old colony Joins at Bagavathy amman temple( R - 422) Km 0/0-1/10 | |||||
| 2.00 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. | 1,342.4 | Sqm | 6 ₹8,054.40 | 6 ₹8,054.40 |
| 3.00 | Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting sidedrain etc, complete. as per SS20 A | 1,141.5 | Cum | 141 ₹1.6 L | 140 ₹1.6 L |
| 4.00 | Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete. | 161.25 | Cum | 342 ₹55,147.50 | 341 ₹54,986.25 |
| 5.00 | Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) . GSB Gr III | 662.25 | Cum | 2,866 ₹19.0 L | 2,856 ₹18.9 L |
| 6.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | 608.82 | Cum | 2,935 ₹17.9 L | 2,925 ₹17.8 L |
| 7.00 | Applying PRIMECOAT over WMB/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp. | 4,058.75 | Sqm | 88 ₹3.6 L | 88 ₹3.6 L |
| 8.00 | Applying TACK COAT over Primed WBM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp. | 4,058.75 | Sqm | 21 ₹85,233.75 | 21 ₹85,233.75 |
| 9.00 | BITUMINOUS CONCRETE 25mm THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5 | 103.91 | Cum | 12,137 ₹12.6 L | 12,095 ₹12.6 L |
| 10.00 | Provision for KM Stones | 1 | Nos | 2,202 ₹2,202 | 2,190 ₹2,190 |
Tender Value
₹84.0 L
EMD Value
₹85,000
Closing Date
20 Feb 2026, 3:00 pmClosed
Collector/Chairman, DRDA, Karur
Collector/Chairman, DRDA, Collectorate, Karur
Upgradation the road from Rengapalayam ODR road to Seethapatty Old colony Joins at Bagavathy amman temple( R - 422) Km 0/0-1/150
2026_RDTN_657146_4
DIPR.1044/Tenders/2026
Open Tender
Civil Works - Roads
180 days
District Rural Development Agency
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹85,000
Yes
District Rural Development Agency, Karur
2 Apr 2026
14 Feb 2026
20 Feb 2026
14 Feb 2026
20 Feb 2026
14 Feb 2026
16 Feb 2026
Name of the work : Upgradation the road from Rengapalayam ODR road to Seethapatty Old colony Joins at Bagavathy amman temple( R - 422) Km 0/0-1/10
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201.
Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting sidedrain etc, complete. as per SS20 A
Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete.
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) . GSB Gr III
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Applying PRIMECOAT over WMB/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Applying TACK COAT over Primed WBM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
BITUMINOUS CONCRETE 25mm THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Provision for KM Stones
Provision for HM Stones
Towards cautionary sign board 90cm
Road Marking with hot applied thermoplastic Compound with Reflectorising Glass Beads on Bituminous surface
Provision for Road studs
Construction of Hard bed @ Ch 400m @ Rengapalayam ODR road to Seethapatty Old colony Joins at Bagavathy amman temple ( R - 422) Km 0/0-1/0
Earth work excavation for foundation in all clauses of soils and subsoils to full depth may be directed except in hard rock requiring blasting but inclusive of shoring strutting and whenever necessary of complete complying with standard specification
Cement concrete 1:4:8 mix using 40mm gauge hand broken granite jelly for foundation including dewatering if necessary and laid in layers of not more than 15cm thick and compacted etc., complte complying with standard specification.
Suppling and erecting centering for sides centering for soffits of plane surface for ground level strutting using mild steel sheets of size 90cm x 60cm complyig with standard specification.
Cement concrete 1:3:6 mix using 40mm gauge hand broken granite jelly for foundation including dewatering if necessary and laid in layers of not more than 15cm thick and compacted etc., complte complying with standard specification.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Towards the cost for bituminous pad for expansion joints
Maintenance after completion of work the road sufrace and shoulder to be maintained in proper condition to make them free from excessive edge drop offs, roughness, scouring and pot holes and cleaning of surface drain including culverts for frre flow of water. Relettering name boards and K.M & H.M stone and other maintenance operation required to keep the road traffic worthly at all the time for the maintenance period for the following years.
For 1st Year
For 2nd Year
For 3rd Year
For 4th Year
For 5th Year
GST Amount for providing Service to Government Contract Works for the above ConstructionWorks. GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.12 MB
08Technicalbid.pdf
Tender Documents • 2.30 MB
BOQ_788942.xls
BOQ • 0.24 MB
08Pricebid.pdf
Additional Documents • 1.47 MB