| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.8 LAccepted-AOC NEAR PORAMATH ULUBERIA HOWRAH 711316 | ULUBERIA | HOWRAH | WEST BENGAL | 711316 | ₹5.8 L | 1 | Accepted-AOC L1 |
| 2 | 2₹5.8 L+₹291.91 (0.05%)Rejected-Finance 18 SANKAR BOSE ROAD KOLKATA | ₹5.8 L+₹291.91 (0.05%) | 2 | Rejected-Finance L2 |
| 3 | 3₹5.9 L+₹7,005.83 (1.20%)Rejected-Finance | ₹5.9 L+₹7,005.83 (1.20%) | 3 | Rejected-Finance L3 |
| 4 | Rejected-Technical ADARPARA P O DIST JALPAIGURI | JALPAIGURI | JALPAIGURI | - | - | Rejected-Technical BIF NOT SUBMITTED AS PER NIT |
Tender Value
₹5.8 L
EMD Value
₹11,676
Closing Date
12 Mar 2026, 3:55 pmClosed
District Engineer
Jalpaiguri Zilla Parishad Jalpaiguri
Clearing of Garbage and upgradation of field with River Bed Materials at Zilla Parishad premises
2026_ZPHD_1018200_1
e-NIT NO WBZP/79-DE/JLP/2025-26
Open Tender
CIVIL WORKS
Percentage
15 days
Jalpaiguri
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,005
₹11,676
Yes
31 Aug 2026
6 Mar 2026
13 Mar 2026
6 Mar 2026
12 Mar 2026
6 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cutting of Trees including Cutting of Trunks, Branches and Removal of Stumps.
Cutting of trees, including cutting of trunks, branches and removal of stumps & roots, refilling, compaction of backfilling and stacking of serviceable material by manual means with all lifts as per Technical Specifications Clause 201 for Rural Roads of MORD. | - | Each | 783 | - |
| 2 | Uprooting and Removing Stumps & Roots.
Uprooting and Removing Stumps & roots, compaction of backfilling and stacking of serviceable material by manual means as per Technical Specifications Clause 201 for Rural Roads of MORD. | - | Each | 442 | - |
| 3 | Clearing and Grubbing Road Land.
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specifications Clause 201 for Rural Roads of MORD. | - | Hec. | 23,363 | - |
| 4 | Taking out carefully G.C.I. or C.I. or asbestos sheets (including ridges etc.) from roof or wall
after unscrewing bolts, nuts, screws etc.and stacking the material at site as directed. | 1 | SqM | 41 | ₹41 |
| 5 | Removal of rubbish,earth etc. from the working site and disposal of the same beyond the
compound, in conformity with the Municipal / Corporation Rules for such disposal, loading into truck and cleaning the site in all respect as per direction of Engineer in charge | - | CuM | 166 | - |
| 6 | Galvanised corrugated iron sheet work (excluding the supporting frame work) fitted and fixed with 10 mm. dia J or L hook-bolts, limpet and bitumen washers and putty complete with 150 mm. end lap and one corrugation minimum side lap. (Payment to be made on area of finished work)(GCI sheet to
be supplied by contractor). b) With 0.63 mm thick sheet | 1 | SqM | 644 | ₹643.94 |
| 7 | Galvanised iron sheet ridging fitted with necessary bolts,screws, washers etc complete.(225mm end lapping) | - | M. | 475 | - |
| 8 | Construction of Sub Base using Local Materials, spreading in uniform layers with Motor grader on prepared surface, including screening the metal as necessary, mixing by mix in place method with Rotavator at OMC, and compacting with vibratory roller to achieve the desired density, lighting, guarding and barricading including cost and carriage of all materials and making necessary earthen bundh of one metre wide on each side to protect the edges complete as per Clause 401 of
Specifications for Road & Bridge Works of MoRT & H (5th Revision).
(iv) For Construction of Sub Base by compacting river bed materials. | - | CuM | 1,203.52 | - |
| 9 | Add GST @ 18.00 % | - | Unit | - | - |
| 10 | Add Cess @ 1% | - | Unit | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.27 MB
BOQ_2501963.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .