| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹75.9 LAdmitted-Finance | -0.10% | ₹75.9 L | L1 | Admitted-Finance |
| 2 | L2₹77.5 L+₹1.6 L (2.10%)Admitted-Finance 304 MOHLA SOT ROORKEE HARIDWAR | HARIDWAR | UTTARAKHAND | 247656 | +2.00% | ₹77.5 L+₹1.6 L (2.10%) | L2 | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical 01 CHERSOO NH44 PULWAMA PULWAMA JAMMU KASHMIR 192123 | PULWAMA | JAMMU AND KASHMIR | 192123 | - | - | - | Not Admitted-Fee/PreQual/Technical Others-hard copy not submitted |
| 4 | Not Admitted-Fee/PreQual/Technical 01 VIDYA VIHAR PHASE I KARGI ROAD DEHRADUN | DEHRADUN | UTTARAKHAND | 248001 | - | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹75.9 L
EMD Value
₹1.5 L
Closing Date
2 Jun 2026, 2:00 pmClosed
Superintending Engineer
Electricity Civil Circle (Dehradun)
Construction of SCADA/DMS Rooms at First Floor of Disaster Recovery Centre, Haldwani.
2026_UPCL8_95984_1
ECC-14/2026-27
Open Tender
Civil Works
Percentage
180 days
As per Tender
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,900
E.E, ECCD Dehradun
₹1.5 L
2 Jun 2026
26 May 2026
2 Jun 2026
26 May 2026
2 Jun 2026
28 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1CIVIL WORKS | |||||
| 0.999 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50m. All kinds of soil. | 10 | Cum | 253.27 | ₹2,532.7 |
| 0.000 | P/Laying in position C.C of excluding the cost of centering and shuttering -All work up to plinth level:1:4 :8 (1 Cement :4 coarse sand: 8 graded stone aggregate 40 mm nominal size) Misc Works | 20 | Cu.M | 6,628.08 | ₹1,32,561.6 |
| 0.999 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:2:4 (1 Cement : 2 coarse sand (zone-lll) derived from natural sources : 4 graded stone aggr | 1 | Cum | 7,570.23 | ₹7,570.23 |
| 0.000 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :sand: 3 graded stone aggregate 20 cm nominal size).1:1.5:3 (1 cement : 1.5coarse sand : 3 graded stone aggregate 20 mm nominal size) | 1 | Cum | 8,801.51 | ₹8,801.51 |
| 0.999 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) | 14.6 | Cu.M | 10,559.92 | ₹1,54,174.83 |
| 0.000 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement, with 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size). | 69.78 | Cu.M | 11,194.85 | ₹7,81,176.63 |
| 0.999 | Centering and shuttering including strutting propping etc. and removal of form for: Suspended floors, roofs, landings, balconies and access platform. | 369.77 | Sqm | 902.21 | ₹3,33,610.19 |
| 0.000 | Centering and shuttering including strutting propping etc. and removal of form for: Shelves (Cast in situ) | 28.28 | Sqm | 902.21 | ₹25,514.5 |
| 0.999 | Centering and shuttering including strutting propping etc. and removal of form for:. Columns, Pillars, Piers, Abutments, Posts and Struts. | 72.83 | Sqm | 935.34 | ₹68,120.81 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.22 MB
TC.pdf
Tender Documents • 0.28 MB
BOQ_113458.xls
BOQ • 0.44 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .