Loading…
New: tenders and results on WhatsApp
New: Find tenders, results and companies on WhatsApp, by text or voice note
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical VILL TUISAMA DASDA KANCHANPUR NORTH TRIPURA | DASDA | KANCHANPUR | TRIPURA | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical VILL ASHAPARA DASDA KANCHANPUR NORTH TRIPURA | KANCHANPUR | NORTH TRIPURA | TRIPURA | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 4 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 5 | Admitted-Fee/PreQual/Technical VILL SRIRAMPUR PO KANCHANPUR NORTH TRIPURA DISTRICT | KANCHANPUR | NORTH TRIPURA | TRIPURA | Admitted-Fee/PreQual/Technical |
Tender Value
₹17.6 L
EMD Value
₹35,265
Closing Date
10 Nov 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
THE EXECUTIVE ENGINEER R.D.KANCHANPUR DIVISION
O/O THE EXECUTIVE ENGINEER R.D.KANCHANPUR DIVISION
MAINTENANCE
2026_CERDD_78802_1
eDT47/EE/RD/KCP/DIV/2026-27
Open Tender
Civil Works - Roads
Percentage
90 days
UNDER R.D. KANCHANPUR SUB DIVISION
Please refer Tender documents.
9 documents required · 9 mandatory
₹1,000
₹35,265
10 Nov 2026
2 Nov 2026
10 Nov 2026
2 Nov 2026
10 Nov 2026
2 Nov 2026
2 Nov 2026 - 10 Nov 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in Soil with Dozer with lead upto 100 m.
Excavation for roadway in soil by mechanical means with Dozer including cutting and pushing the earth to site of embankment upto a distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections as per MoRD Technical Specification Clause 302.3. | 2,040.69 | CUM | 81.1 | ₹1,65,500 |
| 2 | Surface Drains in Ordinary Soil
Construction of unlined surface drains of average crosssectional area 0.4 sqm in ordinary soil to specified lines, grades, levels and dimensions as per MoRT&H Technical Specification clauses of section 300. Excavated material to be used in embankment with a lift upto 3 m and lead of 50 m (average lead 25 m). | 750 | MTR | 114.6 | ₹85,950 |
| 3 | Road side 'V' shaped Pucca Drains
Construction of 'V' shaped road side pucca drain with 1st class brick work in cement Mortar 1 : 4 (1 cement : 4 river sand) laid brick on edge to specified lines, grades, levels and dimensions as per approved design and MoRD Technical Specification Clause 307, 1606. (Excluding the cost of excavation which would be paid separately) | 600 | SQM | 1,246.8 | ₹7,48,080 |
| 4 | Preparation and consolidation of sub grade with power road roller of 8 to 12 tonne capacity after excavating earth to an average of 22.5 cm depth, dressing to camber and consolidating with road
roller including making good the undulations etc. and re-rolling the sub grade and disposal of surplus earth with lead upto 50 metres as per direction of the of the Engineer-in-Charge. | 1,734.06 | SQM | 7.62 | ₹13,217 |
| 5 | Dismantling of Brick soling
Dismantling of brick soling, stacking serviceable materials and unserviceable materials separately with all lifts and upto a lead of 500 m by manual means as per MoRD Technical Specification Clause 202. | 58.05 | CUM | 859.2 | ₹49,877 |
| 6 | Charges for Brick soling
Laying flat brick soling on prepared subgrade
(excluding the cost of bricks but including the cost
of binding materials) according to lines, grades and cross-section shown on the drawing, filling joints with Earth, free from clay with a Plasticity Index not exceeding 6, watering and rolling the same with three wheeled road roller 80-100 kN as per MoRD Technical Specification Clause 412. | 769.51 | SQM | 60.8 | ₹46,786 |
| 7 | Charges for Brick soling
Laying brick edging laid lengthwise on prepared
subgrade (excluding the cost of bricks but including the cost of binding materials) according to lines, grades and cross-section shown on the drawing, filling joints with Earth, free from clay with a Plasticity Index not exceeding 6, watering and rolling the same with three wheeled road roller 80- 100 kN as per MoRD Technical Specification Clause 412. | 540 | MTR | 17.3 | ₹9,342 |
| 8 | Supplying bamboo (1st class) 85 mm to 100 mm dia and making shoe with end tappered upto 300 mm from the bottom of the bamboo as per drawing and specification. | 595.02 | MTR | 42 | ₹24,991 |
| 9 | Handling and driving bamboo (1st class) 85 mm to 100 mm dia upto the length required by heavy hammer as per drawing and specification. | 261.87 | MTR | 70.1 | ₹18,357 |
| 10 | Providing and fitting, fixing bamboo (1st class) 85 mm to 100 mm dia for horizontal, diagonal bracing, strut etc. with nails / spikes and binding wire (GI 2.00 mm) as per drawing and specification. | 172.98 | MTR | 57.3 | ₹9,912 |
stage.html
html • 0.03 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.31 MB
47EEAPPROVEDDNIT.pdf
Tender Documents • 3.18 MB
BOQ_80231.xls
BOQ • 0.33 MB
ePT18.pdf
Additional Documents • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .