Tender ID
Tender Value
₹30.0 L
EMD Value
₹31,000
Closing Date
9 Apr 2026, 6:00 pmClosed
Executive Engineer, Panchayat (R&B) Division, Valsad
New Gujarat Parten 2501- Gram Vikas 2025-26 New Gujarat Parten 2501- Gram Vikas 2025-26 Resurfacing of Various Road of Umargam Taluka Dist Valsad (Pk-2 Total 3- Road 1.30 Km Legth) 1)PalgamKhothaniya Faliya IshvarbhaiHouse towrds Road 0.45 km 2.) Resurfacing PalgamKhothaniya Faliya GaneshbyhaiHouse towrds Road 0.45 km 3.) Bhatkhadi (Dhodipada) Raman patkarni Wadi towrds Road 0.40 km (Re-invite)
291087
48 of 2025-26
Open
Civil Works - Roads
Works
Valsad
6 documents required · 6 mandatory
₹1,500
Yes
Executive Engineer, Panchayat (R&B) Division, Valsad
₹31,000
Yes
28 Mar 2026
28 Mar 2026
28 Mar 2026
9 Apr 2026
28 Mar 2026
Name of Work : New Gujarat Parten 2501- Gram Vikas 2025-26 Resurfacing of Various
Road of Umargam Taluka Dist Valsad (Pk-2 Total 3- Road 1.3 Km Legth)
BILL OF QUANTITIES
Item No. Item of work Quantity Unit Rate In figures Amount
Clearing and grubbing road land
including uprooting trunk vegetation,
grass bushes, shrubs, sapligs and
1 trees girth upto 300 mm removal of 0.04 Hect 28393.040
stumps of trees cut earlier & disposal
of unserviceable material. (C) By
Mechanical means in area of light
Earth work in cutting in all sorts of soil
and soft murrum including conveying
and spreading the stuff,embankment
2 as and where directed within 200 185.00 CMT. 128.070
meters from the end of the cutting wirh
all required lead and lift.
Scarifying gravelled macadam or
bitumen macadam surface 6cm to
3 cm depth including stacking useful 2700.00 Sqm 40.720
materials on road side and disposing
of the remaining stuff as directed.
Consructing of granular sub-base Gr-II
by providing course graded B.T.
machine crushed material satisfying
MOST specification of (grading II)
using materials (26.5 mm to
mm@ 75 per cent,2.36 mm below@25
4 per cent) including spreading in 216.00 Cum 713.060
uniform layer with motor grader on
prepared surface, mixing by mix in
place method with rotavator at OMC
and compacting with vibratory roller to
achieve the desired density etc.
Providing and laying wet mix
macadam base course as per
MORTH specification using machine
crushed B.T. chips as per required
gradation, mixing with required
optimum quantity of water, conveying
5 the mix to site of work, spreading in to 556.00 Cum 857.760
grade and camber with
paver/mechanical means and
consolidation each layer with vibratory
roller to aschieve the desired density
including cost of material labour plant
and equipment etc. complete.
Providing and applying priming coat
with emulsion (SS-1) at the rate of
6 7.50 kg/ 10 Sq.mt. including cost of 3900.00 Sqm 41.810
asphalt and preparing the surface
heating, and applying etc. complete.
Supplying, stacking & spreading Hard
Murrum on road side for hard side
7 shoulder of work as per specification 78.00 CMT. 443.390
including rolling & watering complete.
Supplying, fixing & joining reinforced
concrete heavy duty non pressure pipe
with colars for culverts carryig heavy
traffic as per Indian Railway Standard
8 Specifications including setting and 25.00 Rmt 1952.000
joining the pipe in cement mortar 1:2
watering and laying ( to level or slope)
of I.S. class NP-3 600 mm dia.(Internal)
Providing & laying bituminious base
course 37.50 mm thick compacted
layer asphalt VG-30 grade at 1.99 %
by weight of mix for mixing and
2.5kg/10 smt RS-1 for tack coat &
using B.T. chips of required gradation
including cleaning and heating
asphalt, premix material by drum mix
9 process in proper gradation and laying 292.50 MT 2132.030
with paver finisher including rolling and
consolidation with 8-10 tonne vibratory
roller and providing all material
equipment, tools, and plants, fire
wood, oil, kerosene labour charges
etc. complete using contractor's own
machinaries, drum mix plant and paver
finisher etc. complete.
Providing & laying 37.50mm thick
bituminous macadam with 0.66 cum
stone chips for one M.T. using the
asphalt VG-30 34 kg/M.T. (i.e 3.40%)
for mixing and RS-1 for tack coat
kg/10sqmt heating the asphalt and
10 agg by continues batching of hot mix 323.00 MT 2714.830
plant & spreading the same by pavers
finisher and consolidation with power
roller of 80 to 100 KN with necessary
equipment, oil, kerosene, fire, wood,
labour charges etc. complete with
contractor's own machinary.
Providing & laying seal coat with B.T.
agg. as specifed using agg. at the rate
of 0.18 cu.mt/10Sq.Mt.and bitumen for
mixing agg. at the rate of 4.50% i.e.
45.00 kg/M.T. of total mix for binder
including heating & mixing in hot /
drum mix plant & transporting &
11 sreading the same by paver finisher & 105.30 MT 3127.890
consolidation with vibratory roller incl.
necessary firewoood, oil, lubricants,
labour charges etc. using contractor's
own drum mix plant, machineries &
equipment, tools etc. complete in
accordance with the requirement of
Providing and laying asphalt painting
on B.T. surface with bitumen VG-30 at
12 rate 5.00Kg / 10Sq.mt. and spreading 3900.00 SQM 28.280
stone dust for painting surface at rate
Providing & Fixing ordinary K.M. Stone
Precast C.C. 1:2:4 including
13 necessary reinforcement as per I.R.C. 3.00 No 704.330
type design in C.C. 1:4:8 including
painting and lettering etc. complete
Providing & Fixing Hectometer stone
14 as per I.R.C. type design including 6.00 No 356.500
painting, lettering etc. complete (i)
Fixing in C.1:5:10
Providing & fixing Village Name Board
Made out of 2mm aluminium sheet;
size 90x60cms.rectangle as per the
design of IRC-67-1977. Pre treated
with phospheting process & acid
etching; coated with one coat of epoxy
primer and two coats of best quality
epoxy paint, reflectorised with retro
refle retro reflective sheeting as per
latest M.O.S.T. Specifications ;Letters
and numerals should be as per IRC-30-
1968. 3.1m long (2 nos.) Stand post
and frame fabricated from suitable
size iron angle of 50x50x5mm.
painted with best quality epoxy
coatings in black and white bends. The
details of symbol or
inscription/numbers for each board
shall be as per the instruction of
engineer in charge. The fixing at site
shall be in 1:2:4 CC block of size
45x45x60cms. for each leg, including
excavation curing etc.complete under
the supervision of enginner in
Logo Board:- Providing and fixing
Logo Board made out of 2mm
aluminium sheet, as per the drawing &
design. Pre treated with phospheting
process and acid etching coated with
one coat of epoxy primer and two coat
of best quality epoxy paint,
refloctrorized with retro reflective
sheeting as per the latest M.O.S.T.
specification, 3.1 Mt. long stand post
and frame fabricated from suitable
size iron angle of 35 x 35 x 3 mm, 75 x
75 x 6 mm as required The fixing at
site shall be in 1:2:4 CC block of size
45 x 45 x 60 cms for each leg,
including excavation curing etc.
complete under the supervision of
Engineer-In-Charge (A)Engineer grade.
STOP SIGN:-Providing and fixing sing
boards made out of 2mm aluminium
sheet; size 90 x 90cms. rectangle as
per the design of IRC-67-1977 pre
treated with phospheting process &
acid teching; coated with one coat of
epoxy primer and two coats of best
quality epoxy paint; reflectorised with
retro refiective sheeting as per latest
M.O.S.T. Specifications; 3.1m long
stand post and frame fabricated from
suitable size iron angle of 35 x 35 x
3mm 75x75x6mm as required; painted
with best quality epoxy coatings in
black and white bends. the details of
symbol for each board shall be as per
the instruction of engineer in charge.
The fixing at site shall be in 1:2:4 CC
block of size 45 x 45 x 60cms. for each
leg. including excavation curing tec.
complete under the supervision of
engineer in charge.(A) Engineer
I/We am/are willing to carry out the work at… % above/below percent(Should
be written in figures and words) of the estimated rate mentioned above. Amount of my /our tender works out as
Estimated amount put to tender Estimated amount put to tender
Deduct………% below Add………% Above
In words In words
All works shall be carried out as public works department Handbook and other
specification of Division or as directed.
All the columns in schedule should be filled in ink or ballpen and the total of the
entries in last column should be struck by the contractor under his signature.
Rate quated include clearance of site (Prior commencement of work and at its close)
in all respects and hold good for work under all conditions,site moisture, weather etc.
The Contractor shall exhibit a board with detailed specification and details of work
as directed by the Engineer-In-Charge for which no extra payment shall be made.
The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
GST and Income tax TDS will be deducted at a source while making payments of bills
In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per
Govt. G.R.: PRC-10/2017 Cement Consumption/16/C Date:11/05/2017 as stated in
S.O.R. therefore in R.C.C. items where there is a change as per actual mix design the cost
of difference of cement consumption have been deducted from the rate of original item at
the rate of input rate mentioned in all the tender.
To be continued on additional sheet,if found necessary.
Deputy Executive Engineer Executive Engineer
Panchayat (R&B) Sub.Division Panchayat (R & B) Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
2.GR to be attached with DTP_SBD.pdf
GR.pdf
SBD-TASP Road Pk-2.pdf
Schedule B TASP_ Road Pk-2.pdf
Specification_ TASP Road Pk-2.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .