S.E., E.T.C., Bareilly
Superintending Engineer Transmission Campus Near L.I.C. Office Rampur Garden, Bareilly
Pilfer Proofing Metering of 132KV Bhojipura TSS Bay alongwith other associated works at 132KV Substation Dohna under E.T.D.-II, Bareilly
2021_UPTCL_546320_1
E-Tender No. 49/W/ ETC(B)/2020-21
Open Tender
Electrical Works
45 days
Bareilly
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
A/c No 10897666087 IFSC SBIN0000615 S.B.I. Bly
₹4,000
15 Sept 2021
16 Jan 2021
5 Feb 2021
16 Jan 2021
4 Feb 2021
16 Jan 2021
16 Jan 2021 - 4 Feb 2021
Amount
Following Works are Required to be carried out for Pilfer Proof metering of 132 KV Bhojipura TSS Bay at 132 KV S/S Dohna under ETD-II, Bareilly with all Cost of Men, Materials, Misc. Consumables, T&Ps for Satisfactory Completion of the Work as per Technical Specifications and Direction of the Supervising Engineer, as per details below :
Removal of trench cover from trenches for laying of various size cable through 21/2 & 1" dia 'C' Class G.I. pipe (wherever respective required) as per cable schedule on cable racks along the Wall of Cable Trenches with Associated work such as Cutting, making Threads for fitting Socket, Elbow & dressing etc. Determination of all internal connections at each equipment, laying of Control Cables in GI Pipes and its Retermination including all internal connection at each equipment including correct Ferruling as per drawing on each core of cable. Control cable will be fully covered by G.I. pipe up to termination point at both ends. After completion of work all the Trench covers are to be placed properly. All required material (G.I. Pipe, Socket, Bands, Nipples & T-joints), labour, electrician, etc. will be arranged by the contractor himself at his own cost.
Pilfer Proofing by using 21/2 " Dia Pipe.
Pilfer Proofing by using 1 " Dia Pipe.
M/s S.S. Refregeration
SHRI BALAJI ENGG. WORKS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid