Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.7 LAccepted-AOC | ₹3.7 L Quoted ₹3.2 L | L1 | Accepted-AOC L1 |
| 2 | L2₹3.3 L+₹8,464.40 (2.67%)Rejected-Finance N A | ₹3.3 L+₹8,464.40 (2.67%) | L2 | Rejected-Finance L2 |
| 3 | L3₹3.9 L+₹71,947.40 (22.7%)Rejected-Finance VILL KIYAR PO JEORI TEHSIL RAMPUR DISTT SHIMLA | SHIMLA | HIMACHAL PRADESH | 171001 | ₹3.9 L+₹71,947.40 (22.7%) | L3 | Rejected-Finance L3 |
| 4 | L4₹4.0 L+₹80,411.80 (25.3%)Rejected-Finance | ₹4.0 L+₹80,411.80 (25.3%) | L4 | Rejected-Finance L4 |
Tender Value
₹5.0 L
EMD Value
₹4,994
Closing Date
21 Jul 2026, 9:00 amClosed
Additional Superintending Engineer
Additional Superintending Engineer, GPHD, Jeori
Temporary Diversion of Water of Nogli Khad into Power House Water Conductor System (Open Channel) wef 01.08.2026 to 08.11.2026 (100 days)
2026_HPSEB_139076_1
HPSEBL/GPHD/DB-9/2026-27-81
Open Tender
Manpower Supply
Percentage
100 days
Nogli
Please refer Tender documents.
6 documents required · 6 mandatory
₹590
₹4,994
8 Sept 2026
15 Jul 2026
22 Jul 2026
15 Jul 2026
21 Jul 2026
15 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Work Detail | |||||
| 1.01 | Temporary diversion of water of Nogli khad into power water conductor system (open channel) by providing boulders/bushes/tree branches, sand filled gunny bags and maintaining water level in old intake structure by operation of control structure by gate to avoid water spillage by cleaning trash racks provided at various places in water conductor system such as at bell mouth gate, near de-silting chamber. The de-silting chamber valves should also be cleaned by operation of respective valves i/c clearance of side drains complete in all respect as per the requirement and direction of Engineer-in charge to be given time to time. The attendant (s) should be equipped with mobile phone round the clock for the period w.e.f 01/08/2026 to 08/11/2026 (100 Days)
2. The materials/T& P required will be provided by the contractor.
3. Contractor will be responsible for fatal or no-fatal accident during working hours.
4. The G.S.T @ 18% will be paid/born by HPSEBL extra. The same shall be deposited by the contractor himself. | 1 | Job | 4,23,220 | ₹4,23,220 |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.29 MB
081TENDER.pdf
Tender Documents • 0.75 MB
BOQ_206019.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .