Loading…
Loading…
Tender Value
₹1.5 Cr
EMD Value
₹1.5 L
Closing Date
1 Sept 2026, 6:00 pm3d left
Dy.Minicipal Commissioner - West Zone
Providing, Supplying and fixing new MS Grill As Per Design Given and repairing, replacing M.S Structural parts of existing grill and other necessary work at Diff.ward of Dyce-1 of West Zone (ARC) (Re-Tender)
337544
2/26-27 (T.N.26)
Open
Civil Works - Others
Works
Ahmedabad
4 documents required · 0 mandatory · 4 optional
₹3,600
Municipal Commissioner, Ahmedabad
₹1.5 L
21 Aug 2026
21 Aug 2026
21 Aug 2026
1 Sept 2026
21 Aug 2026
2. Tender Estimated Cost Rs.1,49,98,053.08 (exclusive of GST). GST will be paid extra by
AMC/Authority at prevailing rate to the contractor.
1% of the Tender Cost in the form (Rs.1,49,980/-)
3. Earnest Money
(D.D./Pay Order / B.G.)
4 Tender Fee Rs Demand Draft of Rs.3600.00
6. Time-Limit 12 months(Excluding Monsoon)
7. Validity Period 120 Days
(i) Last Date of Online Submission
a) In Sealed cover in duplicate copies by Registered Post A.D,
(ii) Mode of Sending or by Courier.or hand delivery
b) Tender sent by ordinary post will be rejected out right.
(iii) Description essential to be
a) Name of work, Tender Notice No. & Tender No.
made on sealed cover b) Date of receiving tender by Corporations.
(iv) Mode of quoting rates in
The Price bid shall be submitted online only.
Schedule of Quantities and Rates It shall not be submitted Physically.
9. Date of Opening Dt 02-09-2026 , 15:00 PM
Submission of EMD. Tender fee and other Documents during office
Place of Submission & Opening of
10. hours: On Dt.02-09-2026 &12:00 pm West Zone, 2nd Floor, A.M.
Tender Office, Dr. Ramanbhai Patel Bhavan, Usmanpura.Ahmedabad
Municipal Corporation, W.Z. Office, Ahmedabad-380013.
(1) Rs.1000/- per day (for tenders amounting upto 10 Lakhs),
11. Penalty Due to Delay of work (2) Rs.2500 per day (for tenders amounting above 10 Lakhs
and upto 30 Lakhs), (3) Rs.5000 per day (for all tenders
amounting above 30 Lakhs) but not more then 10% of bill
12. Defect Liability As per ‘B-1 Form Close
Whenever a work is allotted by Engineering staff, whether minor or
major of part thereof of any amount, the contractor shall be bound
to start the works within 48 hours of intimation of work.
Time permitted to start parts of Communication done telephonically via SMS, Via Whatsapp and
work through letter / E-mail shall be considered legal and binding for the
same. Failure of comply to start the works in 48 hours of intimation
as above by contractor the contractor shall be levied penalty of (1)
Rs.1000/- per day (for tenders amounting upto 10 Lakhs), (2)
Rs.2500 per day (for tenders amounting above 10 Lakhs and upto
30 Lakhs), (3) Rs.5000 per day (for all tenders amounting above
30 Lakhs). Three times failures by contractor shall make
contractor responsible to be black listed unless and otherwise
justified properly in writing / binding within 15 days of last notice of
14. ftuLx[t¾xhlu «J<obtl GST yjd&e åþfJJtbtk ytJNu
The staff of the contractor shall wear safety jackets,
shoes, helmets etc. while on duty and any violation will attract
a fine of Rs. 5,000/- for each incident.
15 Safety Failure to erect safety signage or trying to carry out
the works without proper precautions/safety measures as
required will attract a fine of Rs. 5,000/- for each incident.
If contractor work is not Started or not completed in
time or delay or left the ongoing work so As Per AMC
16 Debar condition
Debar Circular no.74 Dated 15.10.2025 Action taken against
Contractor's Sign Addl.C.E.(west zone)
ybœtJtœ BgwÂlÂmvj ftuvtuohuNl
bntldh muJtmœl - vrùbÍtul
y.Bgw.ftu. Ítul Ítulj ytuVem,
ztuo.hbKCtE vxuj CJl, WMbtlÃþht ath hM<t vtmu, ybœtJtœ. vrùb Ítul xuLzh ltuxem
lk-07/2025-26 btk ytJhe juJtguj ftbtule ÂJd<
1. Wvhtuf< xuLzhtu su btLg hSMx[uNl ^htJ<t ftuLx[t¾xh©eytuyu ztWljtuz fhe ChJt.
2. yt xuLzhtu zwÃjefux ftuveytu mt&u Chelu Wvh lt mhltbu ÁcÁ / hSMxh yu.ze./ MvezvtuMx/ fwhegh&e rlg< mbgbtk
btufjJtlt hnuNu.
3. ftuLx[tfxh©eytuyu xuLzhle mt&u BGþrlrmvj btLg hSMx[uNlle/ dJobuLx hSMx[uNlle ftuve, xuLzh ftuve <&t yLg vwhtJt mt&u
yawf mtbuj fhJtle hnuNu ylu fJh Wvh xuLzh lkch <&t ftuLxufx lkch sYh MvÐ œNtoJJtltu hnuNu. su ftuLx[tfxh©eytuyu
hSMx[uNl heLgw fhtJuj l ntug.
4. ftuLx[tfxhtuyu xuLzhbt cukfl wltb, Ft<t lkch, btEfh lkch ylu mhltBþ MvÐ yûthu jFÔþ.
5. xuLzh Ve vu ytuzoh / zebtLz z[tVx&e aqfJJtlehnuNu. œhuf xuLzh œeX yjd xuLzh xuLzhVe ChJtle hnuNu.
6. ytuAe hfble xuLzh Ve, R.yub.ze. fu xuLzh Ve, R.yub.ze. ÂJltlt xuLzhtu hœct<j (fuLmj) dKtNu.
7. xuLzh mt&u BþfJtbtk ytJ< hfblt ftb btxu htufzt, jtufj btRfh auf, rzbtLz z[tVx, vu ytuzoh fu cukf duhkxelt MJYvbtk <&t
Yt. yuf fhtuz&e Wvhle ykœtS< hfblt ftb btxu R.yub.ze.le hfb btºt rzbtLz z[tVx, vu ytuzoh fu ckuf duhkxelt MJYvbtk
8. cukf duhuLxe btºt ybœtJtœ Nnuhle s MJefthJtbtk ytJNu.
9. xuLzh Ve <&t R.yub.ze.le hfblt ze.ze./ aufle vtA¤ ftuLx[tfxh©eyu vtu<&t btuctRj lkch yJ~g jFJtltu hnuNu.
ftuLx[t¾xhu vtu<&t ze.ze. xuLzh R~gw > <theF ct>lt s ytvJt.
10. Nh<e xuLzh hœ ct<j dKtNu.
11. stu xuLzhbtk MvÐ WÕjuF fhtguj ntug <tu atubtmtlu fthKu Ft<tfeg MËalt yLJgu ßgthu ßgthu ftb ck^ htFJtLþk &tg <u
mbglu ftble BþÆ<btk bkswhe ytvJtbtk ytJNu. vhkðþ yt yLJgu ftuE CtJ J^thtu ytvJtbtk ytJNu lne. sule ltuk^ œhuf
12. xuLzhtu ftuEvK fthK ytÃgt rmJtg MJefthJt fu lrnk MJefthJt <ule mkÃËKo m•tt BGþrl.rmvj frb§h©ele hnuNu.
13. xuLzhbtk stu ftuR mwDtht JDtht ntug <tu <u ykdu xuLzh Ch<t vnujt AuÕju r>Jmu rlg< JucmtEx y&Jt fauheyu sYhe <vtm
fhelu s xuLzh btufjÔþk.
14. mefgtuhexe zevtuÍex/ vVtuboLm duhuLxele hfb Yt. yuf fhtuz mw^ele ykœtS< hfblt ftb btxu htufzt, jtufj btRfh auf,
rzbtLz z[tVx, vu ytuzoh fu cukf duhkxelt MJYvbtk <&t Yt. yuf fhtuz&e Wvhle ykœtS< hfblt ftb btxu mefgtuhexe zevtuÍex/
vhVtuboLm duhkxele hfb btºt rzbtLz z[tVx, vu ytuzoh fu ckufduhkxelt MJYvbtk ytvJtle hnuNu.
15. mœh xuLzhbtk " GST rlgb Bþsc jtøþ vzNu. " <u Bþsc dKºte fhe xuLzh ChJtlt hnuNu.
zebtLz z[tVx / auf “Bgwrlrmvj frb§h©e, ybœtJtœ” lt ltbltu fZtJJtu.
A. Guarantees issued by following banks will be accepted as SD/EMD on permanent basis. All
nationalized Banks B. Guarantees issued by following banks will be accepted as SD/EMD for the
period up to March- 31, 2026. The validity cut-off date in the GR is with respect to the date of issue of
Bank Guarantee irrespective of the date of termination of Bank Guarantee.
1. Commercial Banks :-
2. A U Small Finance Bank
3. Bandhan Bank
4. Barclays Bank
5. City Union Bank
7. DBS Bank India Limited
9. Equitas Small Finance Bank
10. ESAF Small Finance Bank
11. Federal Bank
16. IDFC First Bank
17. Jammu and Kashmir Bank
18. Jana Small Finance Bank
19. Karnataka Bank
20. Karur Vysya Bank
21. Kotak Mahindra Bank
22. South Indian Bank
23. Standard Chartered Bank
24. Tamilnadu Mercantile Bank
25. Utkarsh Small Finance Bank
2. Co-operative and Rural Banks Of Gujarat :-
1. The Ahmedabad Mercantile Co-operative Bank Limited
2. Nutan nagrik Sahakari Bank Limited
3. Rajkot Nagarik Sahakari Bank Limited
4. Saraswat Co-operative Bank
5. SBPP Co-operative Bank
6. SVC Co-operative Bank
7. The Cosmos co-opretive Bank
8. The Gujarat State Co-Operative Bank
9. The Mehsana Urban Co-operative Bank Limited
10. The Surat District Co-operative Bank
11. The Surat Peoples Co-operative Bank
12. The Kalupur Commerical Co-operative Bank Limited
13. The Panchmahal District Co-operative Bank
14. The Baroda District Co-operative Bank
15. Baroda Gujarat Gramin Bank
16. Saurashtra Gramin Bank
bu.Bgwrl.frb§h©e, ybœtJtœ Bgwrl. ftuvtuhuNllt mhfgwjh lk.-81, Bþsc <btb
«fthle fLMx[¾Nlle yu¾xeJexebtk BþÏg ftuLx[t¾xh, mc ftuLx[t¾xhlt su bswhtu ftbdehe fh<t
ntug <u <btb bswhtuLþk øþsht< rcÕz´d yuLz y^h fLMx[¾Nl Jfombtk hSMxuNl fhtJÔþ
Ahmedabad Municipal Corporation
WEST ZONE ENGINEERING DEPARTMENT
Name of Work: - Providing, Supplying and fixing new MS Grill As Per Design Given and repairing, replacing M.S
Structural parts of existing grill and other necessary work at Diff.ward of Dyce-1 of West Zone(ARC)
No Qty. Item Rs. Per Amount in Rs.
1 150 Box cutting the road surface to proper slope and camber
for making a base for road work including removing the
excavated stuff and depositing on the road side slope as
directed upto 50Mt.lead 101.91 Cmt.
2 Conveyance charge of earth, lime, murrum, building
rubbish, manure, garbage, sludge, excavated rock, fly ash,
aggregates of any kind executed outside the road site. Rate
also includes spreading & levelling etc complete. Internal
conveyance above 50 mt done within the work site is not
a 112 f) Lead From 5 Km to 10 Km.
b 75 g) Lead From 10 Km to 15 Km.
3 Extra rate over item of excavation of earth for excavation
of asphalt pavement of thickness upto 0.20 meter
including demolishing the asphalt carpet,metal,soiling
etc.comp. with stacking the material as directed. -
a 225 up to 0.20 mt thickness
c 188 0.20 to 0.30 meter (By any type of Breaker Machine or
R.C.C.Cutter machine including cost of operator, fuel, &
transportation etc complete. 177.76 Smt
b 113 0.30 meter & above (By any type of Breaker Machine or
R.C.C.Cutter machine including cost of operator, fuel, &
transportation etc complete. 311.08 Smt
4 22 Providing and Casting in situ controlled Cement Concrete
M-200 for R.C.C.Raft and cutt-off walls including necessary
shuttering laying, vibrating, ramming and curing complete. 4399.29 Cmt
5 150 Providing formwork of ordinary timber planking so as to
give a rough finishi ncluding centering shuttering strutting
and propping etc.Height of propping and centering belows
up porting floor to ceiling not exceeding 4M. and removal
ofthe same for in situ reinforced concrete and plain
concrete work in.(A)Foundations Footings Bases of
Columns etc. and Mass concrete. 171.68 smt
6 75 Providing TMT Bar FE 500D reinforcement for R.C.C.
work including bending, binding and placing in
position complete upto floor two level 75.46 Kg
7 Dismantling the following including loading, unloading and
disposal of unserviceable material for all lead or as
directed by Engineer-In-Charge and stacking the
serviceable material and backfilling the resulting trenches
and pits complete. -
i 75 Dismantling tiled or stone floors laid in mortar including
stacking of serviceable material and disposal of 47.25 Smt
uservicalble material with all lead and lifts. SOR 23-24 IT
ii 8 Demolition & disposal of unservisable material with all
lead and lift for unreinforeced concrete. SOR 23-24 IT CD
NO:20001B 603.23 Cmt
iii 8 Demolition of brick work & stone masonry including
stacking of serviceable materials and disposal of
unserviceable materials with all lead and lift (1) In cement
mortar. SOR 23- 24 IT CD NO:20003B 544.95 Cu.m
iv 8 Demolition including stacking of serviceable materials and
disposal of unserviceable materials with all lead and lift. (I)
R.C.C work. SOR 23-24 IT CD NO:20002 1047.38 Cu.m
Brick work using common burnt clay building
bricks having crushing strength not less than
35kg./Sq.Cm.in foundation and plinth in Cement
8 Mortar1:6 (1-Cement :6 - fine sand) -
(A) Conventional (upto 10 ton)
Providing 15 mm thick cement plaster in single coat
on Rough (Similar) side of single or half brick walls for
interior plastering up to floor two level and finished
even and smooth in (i) Cement mortar 1:3 (1-cement :3-
9 150 sand) 174.83 Sqm
Making Grill As per Design Shown in Atteched Drawing
including Extra rate over item of excavation of earth for
excavation of asphalt pavement / RCC of thickness up to
0.20 meter including demolishing the asphalt carpet,
metal, soiling/cutting Reinforcement etc. comp. with
stacking the material as directed.
up to 0.20 meter thickness (By Manual) 0.20 to 0.30 meter
(By any type of Breaker Machine or R.C.C.Cutter machine
including cost of operator, fuel, & transportation etc.
complete.0.30 meter & above (By any type of Breaker
Machine or R.C.C.Cutter machine including cost of
operator, fuel, & transportation etc. complete.
for foundation upto 1.5 m depth including sorting out and
stacking of useful materials and disposing off the
excavated stuff all lead and lift.(B) all kinds of soil
EARTH WORK (EXECUTED WITH MANUAL LABOUR)
Concrete (PCC) of grade - M15
Providing and laying in position Ready Mixed M- 150 grade
concrete for reinforced cement conctere work , using
cement content as per approved Design Mix manufactured
in fully automatic batching plant and transported to site of
work in transit mixer for a lead up to 10 kms having
continuous agitated mixer, manufactured as per mix
design of specified grade for reinforced cement concrete
work including pumping of R.M.C. from transit mixer to
site of laying, excluding the cost of centering shuttering
finishing and reinforcement including cost of admixtures in
10 1350 recommended proportions as per IS: 9103 to accelerate/ 10,235.00 Rmt
retard setting of concrete, improve workability without
impairing strength and durability as per direction of the
Engineer - in - charge. Without Fly Ash (Min cement level
as per latest IS 456 shall be maintained) Concrete (PCC) of
Providing and laying in position Ready Mixed M- 200 grade
concrete for reinforced cement conctere work , using
cement content as per approved Design Mix manufactured
in fully automatic batching plant and transported to site of
work in transit mixer for a lead up to 10 kms having
continuous agitated mixer, manufactured as per mix
design of specified grade for reinforced cement concrete
work including pumping of R.M.C. from transit mixer to
site of laying, excluding the cost of centering shuttering
finishing and reinforcement including cost of admixtures in
recommended proportions as per IS: 9103 to accelerate/
retard setting of concrete, improve workability without
impairing strength and durability as per direction of the
Engineer - in - charge. Without Fly Ash (Min cement level
as per latest IS 456 shall be maintained)
Structural steel work - Fabrication works - with paint
Providing, fabricating, assembling, hoisting, erecting and
fixing in position structural steel work at all heights/ all
levels/ all shapes & sizes with all leads & lifts using any
type of MS section like rolled steel sections, hollow
sections, plates, chequered plates, bar, sheet, rod,
threaded bolt, railing etc. all confirming to latest relevant
IS codes for the metal elements i.e. window grill, transom
bar, bright bar in wooden door - window frame, railings,
gates, grills, bracings, foundation plate & bolt, support at
truss system, truss, purlin, rafter ,cleat, platforms,
brackets, fencing pole, signage pole, service elements, Jali,
clamp, logo etc. including straightening, cutting, bending,
embosing, bolting and welding, etching (if required) the
members all as per structural drawings and as per detailed
specifications (for materials & workmanship) including
profile cutting, smooth grinding, machining of edges/
faces, necessary welding (electric arc welding) for required
weld lengths and sizes, machine drilling of holes for
joining/ anchoring/bolting, necessary arrangements of
templates to keep the foundation bolts in position dry
sanding, degreasing (wet cleaning) & preparation of rust-
free surface manually or mechanically, metal putty to
make the surface even and smooth, necessary scaffolding/
staging, anchor fasteners,extra for bending elements for
fixing etc complete. Extra for providing hydraulic bending
to MS member (i.e. hollow sections, rolled steel sections,
any type of plates, sheet, bar etc) of any thickness any size
as per drawing, for any type of steel structures like railing,
bus shelter, signage structure, gantry structure etc.
including straightening, profile cutting, bending (precision
bending), etc all as per approved shop drawings and as
directed by Engineer in charge.
Extra for providing Hot dip galvanizing work
confirming to IS 4759/ 2629/ 2633 with zinc of 610 GSM
thickness on any type of MS section for any elements etc.
for all the places, all heights, all level as per the drawing
and as instructed by Engineer in charge. The rate shall
include preparing the surface by shot blasting/ acid
washing prior to hot deep galvanizing, labour, tools,
machinery etc complete (Sample to be approved). The
weight of steel sections before galvanization shall be
measured for payment. The cost of steel sections shall be
paid for separately under relevant item. complete as per
structural designs & directions of Engineer-in-charge.
Supply & fixing factory finished cold formed Light guage
steel frame sections confirming to SP:6 (5) 1980 at site or
work including riveted, bolted or welded in builtup for all
type of sections ,in framed work, cutting, hoisting, fixing in
position and applying primer coat of approved steel primer
etc. complete as per structural designs & directions of
11 3900 Engineer-in-charge. 113.31 Kg.
Providing and supplying of labour for necessary manual
excavation, cleaning, Shifting of Material Or any other, or
for any other work as directed by Engineer In charge. The
12 38 Rate includes Handcart with Mazdoor 551 No
Makadam/ supervision at day / Night
WELDER/ Gas cutter at Day /night
Supplying of welding machine / gas cutter including cost of
welding rods/gas, Transportation, including carting from
15 23 site to work place. 1500 No
Labour for removing, repairing refixing M.S.Railing/grill or
its part at any locations of of any size as per existing
design including cost of red oxide painting it using two coat
of enamel paint of approved color shade Cost includes cart
& deposit of the scrap materials at the AMC store. The
contractor has to execute the work on site bringing
16 894 portable welding, cutter machine etc.comp. 18 Kg
17 60 Supplying Pneumatic Breaker Machine for RCC Slab or
Asphalt Demolishing Work on site byusing
Operator,fuel,power Supplyetc.Complete as Directed.(No
payment should be allowed for non working condition of
machinery and for pipe line excavation and 600 hrs
Hiring and Operating Generator of 7.50KV to 10.0 KV at Shift
site for welding Machine where power is not available (8
18 36 Rate including diesel for Generator & transporting at site 1650 hour)
19 8 Hiring of Tractor with trolley considering 8Hrs .As working
Day hours inclu.Driver with fuel,(iteam cod eno:-
H033SOR2023-24, Ahmedabad District road 1661.02 Day
Providing and Fixing weldmesh jali in 1.2 mt. X 0.60 mt.
frame with 2 nos of 1.2 mt length in horizontal and 2 nos
of 1.2mt long 25 mm X 25 mm X 3 mm MS angle and fixing
at 1.2 mt C/C and in with 0.30 mt x 0.30 mt in 1:2:4
20 36 concrete. Rate including two coats approved brand enamal 775 Rmt
paint as per instruction given by engineer in charge.
21 300 Supplying and fixing of 300 mm-L x 150 mm-B x 380 mm-H
Kerb block for Footpath in M-20 grade using 20 mm
nominal size black trap aggregate of Sevaliya/Timba or
equivalent quality for pre-cast blocks, reasonably exposed
finish/ formwork , mould with well equipped with
vibratory system for kerb stones of approved design
including curing, etc. complete, including the cost of
formwork etc. complete. The rate shall also include
necessary cutting of asphalt, fixing the Kerb stones in line
and level on 5 cm thick sand bedding with necessary
equipments and materials. The rate shall also include the
flush pointing in CM (1:3) for all joints of the kerbstones.
Filling of zari alone the sides of the kerb stone fixed with
Bituminous concrete mixed in proper position as directed
by Engineer in change to form a portable mixture. In any
case Gravel or such type of materials shall not be allowed
for production. a) Laying on 5 cm thick Sand Bedding 350.89 Rmt
22 75 Supplying and fixing of 450 mm H x 300 mm L x
Below..100 mm B Above Double Teper Kerb block for
footpath/Central Verge in M-20 grade using 20 mm
nominal size black trap aggregate of Sevaliya/Timba or
equivalent quality for pre-cast blocks, reasonably exposed
finish/ formwork, mould with well equipped with vibratory
system for kerb stones of approved design including
curing, etc. complete, including the cost of formwork etc.
complete. The rate shall also include fixing the Kerb
stones in line and level on 5 cm thick sand bedding with
necessary equipments and materials. The rate shall also
include the flush pointing in CM (1:3) for all joints of the
kerbstones. 525 Rmt
CONTRACTOR'S SIGNATURE ADDL.CITY ENGINEER
& STAMP (West Zone)
Approved Design of Railing
Invitation for Bid (IFB)
1. The AHMEDABAD MUNICIPAL CORPORATION, (Hereinafter called “the Employer”)
invites sealed Tender document from reputed and qualified bidders for the construction of
Works detailed in the Table below:-
Sr.No Name of Works Approximate Bid Security Completio n
value of works (Rs.) Period
1 Providing, Supplying and fixing new 1,49,98,053.08 1,49,980.00
MS Grill As Per Design Given and Month(Excluding
repairing, replacing M.S Structural Monsoon)
parts of existing grill and other
necessary work at Diff.ward of
Dyce-1 of West Zone (ARC)
2. T e n d e r (a complete set of bidding document) fee shall be Rs.3600/- in the form of
Demand Draft / Pay Order from any Nationalized Bank in favor of MUNICIPAL
COMMISSIONER, Ahmedabad, payable at Ahmedabad, which shall be non refundable. The
fees shall be paid at the time of submitting the tender.
3. Interested bidders shall download the tender documents from website
http://amc.nprocure.com and http://nprocure.com. tender fee as mentioned in clause 2 above
shall be paid by the bidder at the time of bid submission.
4. All bids must be accompanied by Bid Security of the amount specified for the Works in the
above Table payable at Ahmedabad and drawn in favor of AHMEDABAD MUNICIPAL
CORPORATION, Ahmedabad. Bid Security will have to be in any one of the forms as
specified in Clause of ITB (Instructions to Bidders).
5. All Bids must be delivered to Assistant Manager " West Zone, Zonal Office", Dr.Ramanbhai
Patel Bhavan Ushmanpura,Ahmedabad. Not later than 12:00 hrs on Dt.02-09-2026
Seal and Signature of the Bidder Addl. City Engineer
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT
GENERAL CONDITION
1. Contractor shall produce the relevant registration certificate of AMC / State Govt /Central
2. Contractor shall register the work to labour commissioner as per labour act.
3. Contractor shall not sub-let the work without permission of the authority
4. Contractor should have sufficient skilled and unskilled laborers so that he shall start work at
different sites simultaneously. Contractor's having labour force available during festivals
shall only apply. Contractor can not stop the work due to on availably of labour force. In case
progress is delayed, contractor shall be penalized 0.1% of Tender amount per day for work
done after time limit, maximum up to 10% for remaining work.
5. Bitumen rate difference will be paid as per tender conditions, if applicable.
6. Advance payment / machinery advance will not be paid.
7. Payment of running bill will be made as per recent A.M.C. policy in force.
8. No extra payment will be made due to increase of central / state Govt. Taxes.
9. If the work is not completed within time limit the penalty will be recovered from immediate
bills of contractors.
10. If the material i.e. MH cover C.C block etc. supplied from Municipal Corporation store then
contractor shall not claim for any extra rate for non execution of such item, partly/fully.
11. In the specifications, "as directed"/"Approved" shall be taken to mean, "as
directed"/approved" by the Engineer-in-charge.
12. Wherever a reference to any Indian Standard appears in the specifications, it shall be taken to
mean as a reference to the latest edition of the same in force on the date of agreement.
13. In "Mode of Measurement" in the specifications wherever a dispute arises in the absence of
specific mention of a particular point or aspect, the provisions on these particular points, or
aspects in the relevant Indian Standards shall be referred to.
14. All measurements and computations, unless otherwise specified, shall be carried out nearest
to the following limits:
(i) Length, width and depth (height)------- 0.01 Meter.
(ii) Areas -----0.01 Sq. Mt.
(iii) Cubic Contents ------0.01 Cu.Mt.
15. The distance, which constitutes lead, shall be determined along the shortest practical route
and not necessarily the route actually taken. The decision of the Engineer-in-charge in this
regard shall be taken as final.
16. Where no lead is specified, it shall mean "all leads"
17. Lift shall be measured from plinth level.
18. Definite particulars covered in the items of work, through not mentioned or elucidated in it,
specifications shall be deemed to be included there in.
19. Reference to specifications of materials as made in the detailed specification of the items of
work is in the form of a designation containing the number of the specification of the
material and prefix 'M' e.g. 'M-5'.
20. Approval to the samples of various materials given by the Engineer-in-charge shall not
absolve the contractor from the responsibility of replacing defective material brought on site
or materials used in the work found defective at a later date.
21. The contract rate of the item of work shall be for the work completed in all respects.
22. No collection of materials shall be made before it is got approved from the Engineer-in-
23. Collection of approved materials shall be done at site of work in a systematic manner.
Materials shall be stone at site of work in a systematic manner. Materials shall be stored in
such a manner as to prevent damage, deterioration or intrusion of foreign matter and to-
ensure the preservation of their quality and fitness for the work.
24. Materials, if and when rejected by the Engineer-in-charge, shall be immediately removed
from the site of work within 24 hours.
25. No materials shall be stored prior to, during and after execution shall be kept in sufficient
numbers and in good working condition on the site of the work.
26. All works shall be carried out in workmanlike manners per the best techniques for the
particular item.
27. All tools, templates, machinery and equipment for correct execution of the work as well as
for checking lines, levels, alignment of the works during execution shall be kept in sufficient
numbers and in good working condition on the site of the work.
28. The mode, procedure and manner of execution shall be such that it does not cause damage or
over loading of the various components of the structure during execution or after completion
of the structure.
29. All necessary safety measures and precaution (including those laid down in the various
relevant Indian Standards) shall be taken to ensure the safety of men, materials and
machinery on the works as also of the work itself.
30. The testing charges of all materials shall be borne by the Contractor unless recovery at one
percent towards testing charges is separately made.
INSTRUCTION TO TENDERERS
TENDER VALIDITY PERIOD:
The tender shall be kept valid for acceptance for a period of One Hundred Twenty Calendar
days (120) from opening of price bids.
SECURITY DEPOSIT
Within 10 days of receipt of Acceptance from the Corporation, the successful tender shall
furnish to the Corporation Security Deposit of 5% (Five Percent) of the contract price cheque or
Bank Guarantee, pay order, or demand draft of Nationalized Banks and Schedule Banks only.
CONTRACTOR'S SIGNATURE ADDL.CITY ENGINEER
& STAMP (West Zone)
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT
GENERAL SPECIFICATION
Time limit for the work shall be 12 month (Excluding Monsoon) period after the order to start the
works. Progress of work should be in proportion to time limit.
The contractor shall be remain responsible for Workmen’s compensation if any accident. The
contractor shall arrange for barricading at night and arrangement of Pagi at night to direct the traffic.
He shall be responsible for any damage to public. If any incident happen, during the execution of
work. In case of dispute for unseen or overlooked items the decision of the Dy. City Engineer shall
be final. The contractor shall have to give site clean of all rubbish during the work and at the time of
completion of work and hand over the site with final finishing of the work as directed. All the
rejected materials shall be removed from site within 24 hours by contractor at this risk and cost.
Debris shall have to cart daily from site.
For mixing mortar either for masonry or for plaster or for any other purpose contractor shall have to
prepare through of bigger size and mix the mortar in the required proportion. In on case he shall be
allowed to mix the mortar either on floor or any finished surfaces. The contractor shall have to make
his own arrangement for water required for the work.
If any extra item crops up during the progress of work the same shall be carried out by the contractor
and he shall be paid at the rate fixed by Add.C.E. as per the rate analysis based on latest SOR or if
item is not available in SOR than based on current market rates. In case of extra item decision of
Add. City Engg. shall remain final regarding rate.
If in the interest of the Corporation it is necessary to change either any site or the design of the
propose work the contractor shall carry out the same at his quoted rates without charges any extra
and the contractor will have to carry out the works and he will be paid at the rate quoted by him. No
claim for extra rate for subsequent changes in site and design is entertained.
The cubical contents of the cement bag shall be taken as 1-20 cft. Per bag and the contractors shall
have to prepare the measures boxes according to this measure.
Octroi exemption passes shall not be given for any materials required for the work. Contractor will
be fully responsible for compliance of the various provisions under contract Act. 1970 and the Rules
framed the to under.
The tender for the work shall remain open for a period (120) days from the date of opening of the
tenders for this work and that the tenderer shall not be allowed to withdraw on modify the offer on
his own during the period. If any tenderer withdraw or makes any modifications or addition in the
terms and conditions of his tender not acceptable to the Municipal Corporation the Municipal
Corporation shall without prejudice to any right or remedy be at liberty to forfeit in full the said
earnest money and black list the contractor.
If the work is not carried out within the specified time limit. from the date of order to start the work
the penalty of Rs.- (As per Form - B1) per day of delay shall be recovered from the immediate bills
payable to the contractor. Contractor has to make his own arrangement for procurement of steel and
Contractors should note the following conditions carefully:-
1. Conditional tender shall not be accepted.
2. All tenders are to be submitted in duplicate without which the tenders are liable to be
3. In case of tender downloaded from website, tender fee & EMD should be submitted in form
of demand draft or in cash.
4. Condition of Form - B1 Standard Specification of material & code of practice will be
applicable. Form B1 can be is available in website. Specification shall be as per ' R& B Dept.
- Govt. of Gujarat booklets of Building Works & and Road Works Specifications published
by Gujarat Book Depot, Sector-21. Gandhinagar. CONTRACTOR'S SIGNATURE
ADDL.CITY ENGINEER & STAMP ( West Zone) Mobile No.:-
CONTRACTOR'S SIGNATURE ADDL.CITY ENGINEER
& STAMP (West Zone)
AHMEDABAD MUNICLPAL CORPORATION
MAHANAGAR SEVA SADAN
Clause : 1 Contractor shall not employ any child having age 5 to 15 years as it is prohibited by Child
Labour Prohibition and Regulation Act 1986. Hon'ble Supreme Court has given certain guide
lines and as per the guide lines. If child labour is employed on the site work, the contractor
shall have to deposit Rs. 20,000.00 (Rupees Tw enty thousand only) in the child labour
welfare fund. If the employer refuses to deposit then action will be taken for contempt of
Supreme Court Judgement and also will be prosecuted by concerned authority. Because of
the breach of any provision of child labour prohibition and regulation Act 1986 by the
Contractor & Municipal Corporation becomes liable to pay any amount then the Municipal
Corporation shall recover the said amount from the contractor.
Clause : 2 The Standing Committee has decided to deduct 1/2% amount from each running bill as
per its Reso. No. 1783 Date 06--02-97, but the Municipal Corporation Board has recently
decided that the actual testing charge is taken and the remaining amount is refundable at the
time of final bill (As per Muni. Board Reso. No. 123 dated 25-02-97)
Clause : 3 Contractor has to follow prevailing Labour act and has to maintain labour register
acordingly,and has to follow other govt.rules.
Clause : 4 Quantity taken in tender are tentative and may differ as per execution of work. No claim
shall be entertain regarding QUANTITIES.
* MODIFICATION OF DOCUMENTS
Modification of specifications and correction/corrigendum in respect of the work if required will be
made by A.M.C. The same shall be placed on A.M.C website which may be downloaded by the
tendrers enclosed along with the tender duly signed. These shall form a part of tender. The tenderer
shall not add or amend the text of any of the documents except in so far as may be necessary to
comply with any addendum.
* ADDENDAUM / CORRIGENDUM .
Addendum or corrigendum conveying any change or correction in respect of the work shall form the
part of the contract documents. The full consideration shall be given to such addendum or
corrigendum or correction before submission tender duly filled in by the contractor. Therefore, the
contractor shall have to watch such addendum or corrigendum or correction published by A.M.C
through its website www.egovamc.com. Tenderes shall verify the number of addendum issued and
enclose the same with the tender documents,failing which the tender shall be liable for rejection and
no any complaint in respect to this shall be entertained under any circumstances.
CONTRACTOR'S SIGNATURE ADDL.CITY ENGINEER
& STAMP (West Zone)
AHMEDABAD MUNI CIPAL CORPO RATI ON ENGI NEER DEP ARTMENT
NAVRANGPURA WARD
TECHNICAL SPECIFICATION
Name of Work ;- Providing, Supplying and fixing new MS Grill As Per Design Given and repairing, replacing M.S
Structural parts of existing grill and other necessary work at Diff.ward of Dyce-1 of West Zone
General Technical Specification Section
Following technical specifications shall be applicable to the relevant items of BOQ
Box cutting the road surface to proper slope and camber for making a base for road
work including removing the excavated stuff and depositing on the road side slope as
directed upto 50Mt.lead
Any soil which generally yields to the application of pickaxes and shovels, spades, rakes
or any such ordinary excavating implement or organic soil, gravel, silt, sand turf loam,
clay, peat etc. falls under this category. For materials and workmanship for earthwork
and excavation, relevant specification IS: 3764 & IS 1200 (Part I) shall be followed.
To protect persons from injury and to avoid damage to property, adequate
barricades, construction signs, red lanterns and guards as required shall be placed and
maintained during the progress of the construction work and until it is safe for the traffic
to use the roadways. The relevant Indian standards and the rules and regulations of
local authorities in regards to safety provisions shall be observed.
The depth of the excavation shall be as required. The site shall be cleared and all
obstructions, loose stones, materials and rubbish of all kind, bush; wood and all type
trees shall be removed, as directed. The materials so obtained shall be the property of
AMC and shall be conveyed and stacked as directed, within 50-m. lead. The roots of the
trees coming in the sides of the trenches shall be cut and coated with hot Bitumen.
All types of trees, woods etc. which requires prior permission of Govt./ Forest
Authority / Municipal Commissioner, before cutting shall be cut after obtaining such
permission from them. The rate of site clearance is deemed to be included in the rate of
The excavation shall be carried out in true line and level and having width and
depth, as shown in the drawings or as directed. The Contractor shall do the necessary
shoring and strutting or shall provide necessary slopes to a safe angle or steps, as
required or directed, at his own cost. No extra payment shall be made for such
precautionary measures, taken. The bottom of the excavated area shall be leveled both
longitudinally and transversely, as directed, by removing excess soil and watering, as
required. No earth filling will be allowed for bringing it to level, if by mistake or any
other reason, excavation is made deeper or wider than shown on the drawings or as
directed. The extra depth or width shall be made up with sand filling, as specified for the
bottom level of the subsequent finishing at the cost of the Contractor or as directed by
Engineer-In-Charge.
The Contractor shall at his own expense and without extra charge make provision
of supporting all utility services, lighting the excavated areas, separating and stacking
serviceable materials nearly, shoring, timbering, strutting, bailing out water either sub-
soil or rainwater, including pumping at any stage of the work. all Excavation work must
executed with manual labour only.
4.2. Precautions :
The blasting operation shall remain in charge of competent and experienced supervisor
and workman who are thoroughly acquainted with the details of handling explosives and
blasting operations. The blasting shall be carried out during fixed hours of the day,
preferably during the mid-day-lunch hours or at the close of the work as ordered in
writing by the Engineer-in-charge. The hours of blasting shall be notified in advance to
the people in the vicinity. All the charges shall be prepared by the man in charge only.
Red danger flags shall be displayed prominently in all directions during the blasting
People except this who actually light the fuse shall be prohibited from entering into this
area. The flag shall be stationed as 200 m. from the firing site in all directions and all
persons including workmen shall be excluded from the flagged area at least 10 minutes
before the firing warning whistle being sounded for this purpose.
During excavation in rock by blasting, the lowest 15 cm. of the stratas shall be blasted
with light charges so as not to shatter or weaken the underlying rock on which the
foundation will be actually laid. If excavation in rock is done to larger width and lengths
than those shown on the drawings or as directed, no payment shall be made for such
over break. If excavation is done to depth grater than shown on the drawings or
directed, excess depth shall be made up with foundation grade concrete as directed at
the contractor’s cost.
The charged hole shall be drilled to the required depth and in suitable places when
blasting Is done with powder, the fuse cut to the required length shall be inserted in the
holes and the powder dropped in. The powder shall be gently tamped with copper rod
with rounded ends. The explosive powder shall then be covered with trapping materials
which shall be tamped lightly but firmly. When blasting is done with dynamite and other
high explosive dynamite cartridges shall be prepared by inserting the square cut ends of
fuse into the detonator, and finished with dippers at the open ends. The detonator
should be gently pushed into the premier leaving one third of the copper exposed
outside. The primer shall be housed into the explosive. Bore holes shall be of such size
that the cartridges can be easily passed down. The primer shall be cleared of all debris
and explosive inserted. The space for about 20 cms. above the charge shall then be
gently filled with dry clay pressed home and rest of the tamping is firmed with any
convenient materials gently packed with a wooden cover.
At a time, not more than 20 such charges shall be prepared and fired. The man in
charge shall blow a whistle in a recognised manner for cautioning the people. All the
people shall then be required to move to safe distances. The charges shall be lighted by
the man in charge only. The man-in-charge shall count the number of explosions. He
shall satisfy himself that the charges have been exploded before allowing the workman
to go to the work site.
The contractor shall be fully responsible to strictly follow the prevailing rules and
procedures regarding blasting procedures.
In case of a misfire the following procedure shall be observed :
Sufficient time shall be allowed to account for the delayed blast. The man in charge shall
inspect all the charges and determine the missed charge.
If it is the blasting powder charge, it shall be completely flooded with water. A new hole
shall be drilled at about 45 cm. from the old and fired. This should blast the old charge.
Should it not blast the old charge. Should it not blast the old charge, the procedure shall
be repeated till the old charge is blasted.
In case of charge of gelatin, dynamite etc. the man in charge shall gently remove the
tamping and the primer with detonator. A fresh detonator and primer shall then be used
to blast the charge. Alternatively the hole may then be drilled 15 cm. away and parallel
to it. This hole shall then be charged fired when the misfired hole should explode at the
same time. The man in charge shall report to the office at once all cases of misfire, the
cause of the same and what steps were taken in connection therewith.
If a misfire has been found to be due to defective detonator or dynamite, the whole
quantity in the box from which defective article was taken must be sent to the authority
as directed for inspection to ascertain whether all the remaining materials in the box are
also defective or not.
4.3. Accidents :
The contractor shall be solely responsible for any accident during the entire procedure of
handling explosive and blasting and shall pay necessary compensation to persons
affected or damage t lands or properly etc., due to the blasting without extra claims on
the department.
A careful and day-to day account of explosives shall be maintained by the contractor in
an approved manner and shall be open to inspection of the Engineer-in-charge at all
times. Surprise visit may also be paid by the Engineer-in-charge to the storage and in
case of any unaccountable shortage or unsatisfactory accounting, the contractor shall be
liable to be penalised by forfeiture of part or whole of his Security Deposit or by
cancellation of tender in which case be shall not be entitled for any compensation.
4.5. Disposal of Excavated materials :
No materials excavated from foundation trenches of whatever kind they may be, are to
be placed even temporarily nearer than1.5m. of distance prescribed by the Engineer
from the outer edges of excavation. All materials excavated shall remain the property of
Government. Rate for excavation includes sorting out of useful materials and stacking
them separately as directed within the specified lead. Materials suitable and useful for
back filling or other use shall be stacked in convenient places but not in such a way as to
obstruct free movement of men, animals and vehicles or encroach upon the area
required for constructional purpose. The site shall be left clean of all debris on
Disposal of excavated materials is subject to the following :
Unsuitable materials obtained from clearing site and excavation shall be disposed off
within a lead of 50 meters as directed. useful materials obtained from clearing site and
excavation shall be stacked within a lead of 50 M. beyond the building area as directed.
Materials suitable for back filling shall be stacked at convenient places within a lead of
50 M. from the structure for reuse. Useful stones from rock excavation shall be stacked
neatly within a lead of 50 M. and will be allowed to be used by the contractor on
payment at rates laid down in the contract or if not so aid down, at schedule of rates of
the Division or at a mutually agreed rates if there are no such rates in the Schedule of
If surplus materials are required to be conveyed beyond 50 M. conveyance will be paid
for under a separate item.
4.6. Mode of measurement and payment :
The work shall be measured for the work limited to the dimensions shown on drawings
or directed, Excavation to dimensions in excess of the above will not be measured or
paid for and if so ordered by the Engineer the contractor shall have to fill up the excess
depth with cement concrete specified for foundation without extra payment.
Driving of sounding bards, drill holes to explore the nature of substratum upto a total
length of meter distributed in 2 or 3 places in each foundation if necessary, will be
considered incidental work and eill not be paid for separately.
Removal of slips and blows in the foundation trenches will not be measured or paid for.
If it is necessary in the opinion of the Engineer-in-charge to carry foundation below the
levels shown on the plants the excavation for the first 1.5 M. of additional depth will be
included in the quantity for the particular classification and will be paid for as extra work
at rate to be decided under the general conditions of contract unless the contractor
unless the contractor is willing to accept payment as tendered rates.
The rate shall be for a unit of one cubic meter.
Conveyance charge of earth, lime, murrum, building rubbish, manure, garbage, sludge,
excavated rock, fly ash, aggregates of any kind executed outside the road site. Rate also
includes spreading & levelling etc complete. Internal conveyance above 50 mt done within
the work site is not payable.
e) Lead From 5 Km to 10 Km.
f) Lead From 10 Km to 15 Km.
All the surplus earth etc. shall be carried away immediately from the site of work
to a place within 5km.distance or as directed and ordered by the Engineer, so as not
to cause any inconvenience to the public traffic finding which in view of public safety
and traffic convenience. The corporation shall carry out the work byany other
agency at the contractor’s risk and cost. If the instructions are not completed within
days from the date of order to cart the surplus materials and clear the site, the
said work shall be carried out by the Municipal Corporation at the risk and cost of
the contractor and no claim or dispute shall be entertained in this respect.
If the filling in trenches after settlement of the earth filling in trenches is to be
done and the same shall be carried out by the contractor without asking any extra
rate. The contractor shall have to cart the surplus earth after the trenches we will
watered and refilled with the sand. The rate of carting including carting of brickbats,
metal, rubble vegetable and garbage, if necessary to clear the road surface.
The rate shall be for a unit of one cubic meter.
Extra rate over item of excavation of earth for excavation of asphalt pavement / RCC of
thickness up to 0.20 meter including demolishing the asphalt carpet, metal, soiling/cutting
Reinforcement etc. comp. with stacking the material as directed. (a) up to 0.20 meter
thickness (By Manual)(b) 0.20 to 0.30 meter (By any type of Breaker Machine or
R.C.C.Cutter machine including cost of operator, fuel, & transportation etc complete.(c)
0.30 meter & above (By any type of Breaker Machine or R.C.C.Cutter machine including
cost of operator, fuel, & transportation etc complete.
The Item shall be carried out as per Item description and as per instruction of Engineer-in-Charge
and/or his authorized representative.
The rate includes the cost of excavation of bituminous macadam i.e. bituminous layers only
like DBM, BC etc including the labours, tools, equipment and all other incidental expenses. Non
Bituminous Sub-layer/Sub base are not considered in this item.
Work shall be carried out manually or by Machinery as
per site requirements. The mode of payment for this
item shall be on Smt. Basis.
ProvidingandCastinginsitucontrolledCementConcreteM-200 for R.C.C.Raft and cutt-off
walls including necessary shuttering laying, vibrating, ramming and curing complete.
The rate shall be for a unit of one cubic meter.
Providing formwork of ordinary timber planking so as to give a rough finishi ncluding
centering shuttering strutting and propping etc.Height of propping and centering belows
up porting floor to ceiling not exceeding 4M. and removal ofthe same for in situ reinforced
concrete and plain concrete work in.(A)Foundations Footings Bases of Columns etc. and
The rate shall be for a unit of one Squre meter.
Providing TMT Bar FE 500D reinforcement for R.C.C. work including bending,
binding and placing in position complete upto floor two level
TMT bars shall conform to M-18. Mild steel binding wires shall conform to M-21
The work shall consist of furnishing and placing reinforcement to the shape and
dimensions shows as on the drawings or as directed.
Steel shall be clean and free from rust and loose mill scale at the time of fixing in
position and subsequent concreting.
Reinforcing steel shall conform accurately to the dimensions given in the bar bending
schedules shown on relevant drawings. Bars shall be bent cold to specified shape and
dimensions or as directed using a proper bar bender, operated by hand or power to attain
proper radius of bends. Bars shall not be bent or straightened in a manner that will injure the
material. Bars bent during transport or handling shall be straightened before being used on
the work. They shall not be heated to facilitate bending. Unless otherwise specified, a ‘U’
type hook at the end of each bar shall invariably be provided to main reinforcement. The
radius of the bend shall not be less than twice the diameter of the round bar and the length
of straight part of the bar beyond the end of the curve shall be at least four times the
diameter of the round bar. In case of bars which are not round and in case of deformed bars,
the diameter shall be taken as the diameter of circle having an equivalent effective area. The
hooks shall be suitably encased to prevent anysplitting of the concrete.
All the reinforcement bars shall be accurately placed in exact position shown on the
drawing and shall be securely held in position during, metal hangers, supporting wires or other
approved devices at sufficiently close intervals,. Bars shall not be allowed to sag between
supports nor displaced during concreting or any other operations of the work. All devices used
for positioning shall be of noncorrodible material. Wooden and metal supports shall no extend
to the surface of concrete, except where shown on drawings. Placing of broken stone or brick
and wooden blocks shall not be allowed. Pieces of broken stone or brick and wooden blocks
shall not be used. Layers of bars shall be separated by spacer bars, precast mortar blocks or
other approved devices. reinforcement after being placed in position shall be maintained in a
clean condition until completely embedded in concrete. Special care shall be exercised to
prevent any displacement of reinforcement in concrete already placed. To prevent
reinforcement from corrosion, concrete cover shall be provided as indicated on drawings. All
the bars producing from concrete and to which other bars are to be spliced and which are
likely to be exposed for a period exceeding 10 days shall be protected by a thick coast of neat
Bars crossing each other where required shall be secured by binding wires (annealed) of
size not less than 1 mm in such manner that they do not slip over each other at the time of
fixing and concreting.
As far as possible, bars of full length shall be used. In case this is not possible, overlapping
of bars shall be done directed. When practicable, overlapping bars shall not touch each other,
but be kept apart by 25 mm or 1.25 mm times the maximum size of the coarse aggregate
whichever is greater by concrete between them. Where not feasible, overlapping bars shall be
bound with annealed wires not less than 1 mm thick twisted tight. The overlaps shall be
staggered for different bears and located at points along the span where neither shear nor
bending movement is maximum.
Whenever indicated on the drawings or desired by the Engineer- in-charge, bars shall
be joined by coup lings which shall have a cross-section sufficient to transpit the full stresses
of bars. The ends of the bars that are joined by coupling shall be upset for sufficient length so
that the effective cross section at the base of threads is not less than norma l cross-section of
the bar. Threads shall be standard threads. Steel for coupling shall conform to I.S.
When permitted or specified on the drawings, joints of reinforcement bars shall be butt-
welded so as to transmit their full stresses. Welded joints shall preferably be located at points
when steel will not be subject to more than 75 percent of the maximum permissible stresses
and welds so staggered that at any one section not more than 20 percent of the rods are
welded. Only electric are welding using a process which excludes air from the molten metal
and conforms to any or all other special provisions for the work shall be accepted. Suitable
means shall be provided for holding bars securely in position during welding. It shall be
ensured that no voids are left in welding and when welding is done in two or three stages,
previous surface shall be cleaned properly. Ends of the bars shall be cleaned of all loose scale,
rust, grease, paint and other foreign matter before welding. Only competent welders shall be
employed on the work. the M.S. electrodes used for welding shall conform to I.S. 814. Welded
pieces of reinforcement shall be tested. Specimen shall be taken from the actual site and their
number and frequency of test shall be as directed.
M/s. shall be on kg. basis.
Dismantling the following including loading, unloading and disposal of unserviceable
material for all lead or as directed by Engineer-In-Charge and stacking the serviceable
material and backfilling the resulting trenches and pits complete.
a. Dismantling tiled or stone floors laid in mortar including stacking of
serviceable material and disposal of unserviceable material with all lead and
b. Demolition & disposal of unserviceable material with all lead and lift for
unreinforced concrete.
c. Demolition of brick work & stone masonry including stacking of serviceable
materials and disposal of unserviceable materials with all lead and lift (1) In
d. Demolition including stacking of serviceable materials and disposal of
unserviceable materials with all lead and lift. (I) R.C.C work.
The demolition shall consist of demolition of one or more parts of the structure as specified
or shown in the drawings. Demolition implies taking up or down or breaking up. This shall
consist of demolishing whole or part of work including all relevant item as specified or shown in
The demolition shall always be planned before hand and shall be done in reverse order of
the one in which the structure was constructed. Contractor is fully responsible for proper and safe
Necessary dropping, shoring and under pinning shall be provided for the safety of the
adjoining work or property, which is to be left intact, before dismantling and demolishing is
taken up and the work shall be carried out in such a way that no damages is caused to the
adjoining property.
Wherever required, temporary enclosures or partitions shall also be provide 1. Necessary
precautions shall be taken to keep the dust nuisance down as and where necessary.
Dismantling shall be commenced in a systematic manner. All materials which are likely to
be damaged by dropping from a height or demolishing roof, masonry etc. shall be carefully
dismantled first. The dismantled articles shall be properly stacked as directed. All materials
obtained from demolition shall be the property of Government unless otherwise d shall be kept in
safe custody until handed over to the Engineer-in-charge.
Any serviceable materials, obtained during dismantling or demolition shall be separated out
and stacked properly as directed, with all lead and lift. All unserviceable materials, rubbish etc.
shall b stacked as directed by the Engineer-in-charge.
On completion of work, the site shall be cleared of all debris rubbish and cleaned as directed.
Mode of measurements & payment :
Measurements of all work except hidden work shall be taken before demolition
dismantling and no allowance for increase in bulk shall be allowed. The demolition of lime
concrete shall be measured under this item. Specification for deduction for voids, openings etc.
shall be on same basis as that employed for construction of work.
All work shall be measured in decimal system as fixed in its place subject to the following
limits, unless otherwise stated hereinafter : (a) Dimensions shall be measured to the nearest
mt. (b) Area shall be worked out to the nearest 0.01 sq. mt. (c,d,e) Cubical connection shall be
worked out to the nearest 0.01 Cu.m.
The rate shall include cost of all labour involved and tools used in demolishing and
dismantling including scaffolding. The rate shall also include the charges for separating out and
stacking the serviceable materials properly and disposing the unserviceable materials with all
lead and lift. The rate also includes for temporary storing for the safety of the portion not
required to be pulled down or of adjoining property and providing temporary enclosures or
partitions where considered necessary.
The rate shall be for a unit of
one cubic metre. For
Dismantling of Tiled Floor:
The relevant specifications shall be followed except the dismantling of tiled or stone floors
laid on mortars shall be done Dismantling implies carefully taking up or down or these are fixed
by nail screws bolts etc. the shall be taken out with proper tools.
Mode of measurement & Payment :
The supporting materials such as joints beams if any etc. shall be measured separately. The rate
shall include stacking the unserviceable materials as directed will lead and lift.
The rate shall be for a unit of (a) RMT (b) one sq. Meter (C) CMT(d)Cu.m(e)Cu.m
Brick work using common burnt clay building bricks having crushing
strength not less than 35kg./Sq.Cm.in foundation and plinth in Cement Mortar1:6
(1-Cement :6 - fine sand)
(A) Conventional (upto 10 ton)
The rate shall be for a unit of one cubic meter.
Providing 15 mm thick cement plaster in single coat on Rough (Similar) side of single
or half brick walls for interior plastering up to floor two level and finished even and
smooth in (i) Cement mortar 1:3 (1-cement :3-sand)
The rate shall be for a unit of one Squre meter.
Making Grill As per Design Shown in Atteched Drawing including Extra rate over item
of excavation of earth for excavation of asphalt pavement / RCC of thickness up to
meter including demolishing the asphalt carpet, metal, soiling/cutting Reinforcement etc.
comp. with stacking the material as directed.
up to 0.20 meter thickness (By Manual) 0.20 to 0.30 meter (By any type of Breaker
Machine or R.C.C.Cutter machine including cost of operator, fuel, & transportation etc.
complete.0.30 meter & above (By any type of Breaker Machine or R.C.C.Cutter machine
including cost of operator, fuel, & transportation etc. complete.Excavation for foundation
upto 1.5 m depth including sorting out and stacking of useful materials and disposing off
the excavated stuff all lead and lift.(B) all kinds of soil
EARTH WORK (EXECUTED WITH MANUAL LABOUR) Concrete (PCC) of grade -
Providing and laying in position Ready Mixed M- 150 grade concrete for reinforced
cement conctere work , using cement content as per approved Design Mix manufactured
in fully automatic batching plant and transported to site of work in transit mixer for a
lead up to 10 kms having continuous agitated mixer, manufactured as per mix design of
specified grade for reinforced cement concrete work including pumping of R.M.C. from
transit mixer to site of laying, excluding the cost of centering shuttering finishing and
reinforcement including cost of admixtures in recommended proportions as per IS:
to accelerate/ retard setting of concrete, improve workability without impairing strength
and durability as per direction of the Engineer - in - charge. Without Fly Ash (Min
cement level as per latest IS 456 shall be maintained) Concrete (PCC) of grade - M20
Providing and laying in position Ready Mixed M- 200 grade concrete for reinforced
cement conctere work , using cement content as per approved Design Mix manufactured
in fully automatic batching plant and transported to site of work in transit mixer for a
lead up to 10 kms having continuous agitated mixer, manufactured as per mix design of
specified grade for reinforced cement concrete work including pumping of R.M.C. from
transit mixer to site of laying, excluding the cost of centering shuttering finishing and
reinforcement including cost of admixtures in recommended proportions as per IS:
to accelerate/ retard setting of concrete, improve workability without impairing strength
and durability as per direction of the Engineer - in - charge. Without Fly Ash (Min
cement level as per latest IS 456 shall be maintained) Structural steel work - Fabrication
works - with paint
Providing, fabricating, assembling, hoisting, erecting and fixing in position structural
steel work at all heights/ all levels/ all shapes & sizes with all leads & lifts using any type
of MS section like rolled steel sections, hollow sections, plates, chequered plates, bar,
sheet, rod, threaded bolt, railing etc. all confirming to latest relevant IS codes for the
metal elements i.e. window grill, transom bar, bright bar in wooden door - window frame,
railings, gates, grills, bracings, foundation plate & bolt, support at truss system, truss,
purlin, rafter ,cleat, platforms, brackets, fencing pole, signage pole, service elements, Jali,
clamp, logo etc. including straightening, cutting, bending, embosing, bolting and welding,
etching (if required) the members all as per structural drawings and as per detailed
specifications (for materials & workmanship) including profile cutting, smooth grinding,
machining of edges/ faces, necessary welding (electric arc welding) for required weld
lengths and sizes, machine drilling of holes for joining/ anchoring/bolting, necessary
arrangements of templates to keep the foundation bolts in position dry sanding,
degreasing (wet cleaning) & preparation of rust-free surface manually or mechanically,
metal putty to make the surface even and smooth, necessary scaffolding/ staging, anchor
fasteners,extra for bending elements for fixing etc complete. Extra for providing
hydraulic bending to MS member (i.e. hollow sections, rolled steel sections, any type of
plates, sheet, bar etc) of any thickness any size as per drawing, for any type of steel
structures like railing, bus shelter, signage structure, gantry structure etc. including
straightening, profile cutting, bending (precision bending), etc all as per approved shop
drawings and as directed by Engineer in charge. Extra for providing
Hot dip galvanizing work confirming to IS 4759/ 2629/ 2633 with zinc of 610 GSM
thickness on any type of MS section for any elements etc. for all the places, all heights, all
level as per the drawing and as instructed by Engineer in charge. The rate shall include
preparing the surface by shot blasting/ acid washing prior to hot deep galvanizing,
labour, tools, machinery etc complete (Sample to be approved). The weight of steel
sections before galvanization shall be measured for payment. The cost of steel sections
shall be paid for separately under relevant item. complete as per structural designs &
directions of Engineer-in-charge.
The rate shall be for a unit of RMT
Supply & fixing factory finished cold formed Light guage steel frame sections confirming to
SP:6 (5) 1980 at site or work including riveted, bolted or welded in builtup for all type of
sections ,in framed work, cutting, hoisting, fixing in position and applying primer coat of
approved steel primer etc. complete as per structural designs & directions of Engineer-in-
The rate shall be for a unit of one Kilogram.
Providing and supplying of labour for necessary manual excavation, cleaning, Shifting of
Material Or any other, or for any other work as directed by Engineer In charge. The Rate
includes Handcart with Mazdoor
The rate shall be for a unit of no.
Makadam/ supervision at day / Night
The rate shall be for a unit of Number.
WELDER/ Gas cutter at Day /night
The rate shall be for a unit of Number.
Supplying of welding machine / gas cutter including cost of welding rods/gas, ransportation,
including carting from site to work place.
The rate shall be for a unit of Number.
Labour for removing, repairing refixing M.S.Railing/grill or its part at any locations of of
any size as per existing design including cost of red oxide painting it using two coat of enamel
paint of approved color shade Cost includes cart & deposit of the scrap materials at the
AMC store. The contractor has to execute the work on site bringing portable welding, cutter
machine etc.comp.
The rate shall be for a unit of one Kilogram.
Supplying Pneumatic Breaker Machine for RCC Slab or Asphalt Demolishing Work on site
byusing Operator,fuel,power Supplyetc.Complete as Directed.(No payment should be
allowed for non working condition of machinery and for pipe line excavation and
The rate shall be for a unit of one Hour.
Hiring and Operating Generator of 7.50KV to 10.0 KV at site for welding Machine where
power is not available Rate including diesel for Generator & transporting at site
The rate shall be for a unit of one Shift(8 hour).
Hiring of Tractor with trolley considering 8Hrs .As working Day hours inclu.Driver with
fuel,(iteam cod eno:-H033SOR2023-24, Ahmedabad District road
The rate shall be for a unit of one Shift(8 hour).
Providing and Fixing weldmesh jali in 1.2 mt. X 0.60 mt. frame with 2 nos of 1.2 mt length in
horizontal and 2 nos of 1.2mt long 25 mm X 25 mm X 3 mm MS angle and fixing at 1.2 mt
C/C and in with 0.30 mt x 0.30 mt in 1:2:4 concrete. Rate including two coats approved
brand enamal paint as per instruction given by engineer in charge.
The rate shall be for a unit of one Running meter.
Supplying and fixing of 300 mm-L x 150 mm-B x 380 mm-H Kerb block for Footpath in
M-20 grade using 20 mm nominal size black trap aggregate of Sevaliya/Timba or
equivalent quality for pre-cast blocks, reasonably exposed finish/ formwork , mould with
well equipped with vibratory system for kerb stones of approved design including curing,
etc. complete, including the cost of formwork etc. complete. The rate shall also include
necessary cutting of asphalt, fixing the Kerb stones in line and level on 5 cm thick sand
bedding with necessary equipments and materials. The rate shall also include the flush
pointing in CM (1:3) for all joints of the kerbstones. Filling of zari alone the sides of the
kerb stone fixed with Bituminous concrete mixed in proper position as directed by
Engineer in change to form a portable mixture. In any case Gravel or such type of
materials shall not be allowed for production. a) Laying on 5 cm thick Sand Bedding
Supplying and fixing of 450 mm H x 300 mm L x 150 Below..100 mm B Above Double
Teper Kerb block for footpath/Central Verge in M-20 grade using 20 mm nominal size
black trap aggregate of Sevaliya/Timba or equivalent quality for pre-cast blocks,
reasonably exposed finish/ formwork, mould with well equipped with vibratory system for
kerb stones of approved design including curing, etc. complete, including the cost of
formwork etc. complete. The rate shall also include fixing the Kerb stones in line and level
on 5 cm thick sand bedding with necessary equipments and materials. The rate shall also
include the flush pointing in CM (1:3) for all joints of the kerbstones.
Seal and Signature of the Bidder Add.City Engineer(West Zone)
Amdavad Municipal Corporation
ybœtJtœ BGþrlrmvj ftuvotuhuNl
vr©b Ítul - Esluh Ftðþ
1. Ft<t îtht «t&b LOI (juxh ytuV RLxebuNl) RMgw fhJtbtk ytJNu. LOI (juxh ytuV RLxebuNl)
bégt ctœ rœl-10 btk 5 % (vtka xft) juFu auf&e / rzbtLz z[tVTx / vu ytuzoh / luNljtEÍz cukf
duhkxe&e zevtuÍex Che fhthvºt fhJtltu hnuNu. <u ctœ Jfo ytuzoh RMgw fhJtbtkk ytJNu ylu
Jfoytuzohle <theF&e mbg bgtoœt NÁ &guj dKJtbt ytJNu <ub A<tk vK ftb NY fhJtbtk lrn
ytJu <tu rlgbtlwmth ftgoJtne fhJtbt ytJNu.
2. Nh<e xuLzh MJefthJtbtk ytJNu lrn.
3. xuLzh Jujezexe 120 rœJm hnuNu.
4. xuLzh MJefthÔþk, hesu¾x fhÔþk, ftulu ytvÔþk ylu fgt CtJ&e ytvÔþk, <u ykdu zu. BGþrl. frb.©e ltu
rlKog ytFhe hnuN.u
5. xuLzh Chuj ftuLx[t¾xh vife ftuEvK ftuLx[t¾xhlu vK yt CtJu ftb ytvJtbtk ytJu <tu ceò btLg
ftuLx[t¾xh Jtk^tu jE NfNu lrn.
6. yufe JF<u yuf fh<tk Jæþ søgtytuyu ftb NY fhJtltu Jfoytuzoh b¤u <tu ftb yuf mt&u s c^u NY
fhÔþk vzNu. yuf ftb ÃþÁ &tg vAe cesw ftb NY fheyu yuÔþk atjNu lrn.
7. atÕþ ftbu ftuE vK mrJom jtEllu LþfNtl l &tg <u he<u ftb fhÔþk vzNu, òu ftuE mrJom jtEllu
LþfNtl &Nu <tu <ule mkÃËKo sJtc>the (òlbtjle) ftuLx[t¾xhle vtu<tle hnuNu. mtEx vh ftb
>hBgtl bswh fu sl<tlt ftuE btKmlt òl btj fu LþfNtl &tg <ule sJtc>the ftuLx[t¾xhle
hnuNu. vtujem Vhegt> &tg <tu <ule sJtc>the vK ftuLx[t¾xhle hnuNu. CuFz ^me l vzu <ule
sJtc>the vK vtujem Vhegt>btk ftuLx[t¾xhle hnuNu. CuFz ^me l vzu <u btxu mjtb<elt vdjtk
(suJt fu >tuhzwk ctk^e bsqh Ftztbtk W<thJt, mtuh´d ylu Mx[x´d fhJt rJduhu) je^t Jdh bsqhlu
Ftztbtk W<thNu <tu ftuLx[t¾xh s vtujem Vhegtœbtk sJtcœth hnuNu ylu BGþrl. ftuvtuohuNlltu ftuEvK
MxtV ytlt btxu sJtc>th hnuNu lrn.ytxÕþk mbSlu s xuLzh ChÔþk.
8. yt xuLzh su <u Jdolt btLg gtœelt ftuLx[t¾xhtu Che NfNu. dJbuoLxlt btLg ftuLx[t¾xhu y.BGþ.ftuvtuo.
btk btLg ftuLx[t¾xhle gtœebtk hSMx[uNl ðþhk< fhtJÔþk vzNu.
9. yt Wvhtk< y.BGþ.ftuvtuo.lt slhj ftuLx[t¾x fLzeNl vK btLg htFJtle hnuNu. Vtubo ce-1le Nh<tu
ck^lf<to hnuNu. ftb htuz ylu rcÕz´d Ftðþk - øþsht< htßglt MvuNeVefuNl «btKu fhJtLþk hnuNu
<&t MxtVle Mþalt vK mtEx Wvh atÕþ ftbu ægtlbtk juJtle hnuNu. ce-1 Vtubo <&t MvuNeVefuNl
øþsht< çþf Mxtuh, mu¾xh-21, dtk^eldh Ft<u&e ftuLx[t¾xhu ò<u bu¤Je juJtltu hnuNu. <u Jtkaelu vAe
10. ftuLx[t¾xhlu vubuLx BGþrl. ftuvtuo. Ltt rl<erlgb Bþsc fhJtbtk ytJNu.
11. ftuEvK ftgœtfeg jexeduNl yb>tJtœ Nnuhle ftuxobtk hnuNu.
12. bxehegj fu ceò xuMx´d hevtuxo ftuLx[t¾xhu vtu<tlt Fauo ftuvtuohuNl sKtJu <u søgtyu fhtJJtlt hnuNu.
yt ykdultu mkÃËKo Fao <&t BGþrl. MxtVlu juctuhuxhe Mþ^e <&t buLGþVu¾ah´d søgt Mþ^e jtJJt jE
sJtltu Fao vK ftuLx[tfhu CtudJJtltu hnuNu.
13. juch yu¾x «btKu hSMx[uNl ykdu ybj fhJtltu hnuNu <&t fuxjt juch jtJNtu <u vK sKtJJtLþk
hnuNu. juch yu¾x «btKu ftgoJtne lrn &E ntug <tu <u btxu ftuLx[t¾xh mkÃËKovKu sJtc>th hnuNu.
14. btj su <u Mxtumo Wvh y&Jt mtEx Wvh Mþalt Bþsc W<thJtltu <ubs dtuXJJtltu hnuNu.
15. muÕm xuût, ytu¾x[tug, mhatso, yLg xuût fu yLg ftuEvK fhJuht ChJtle sJtc>the ftuLx[t¾xhle
16. atEÕz juch yuBvjtug fhe NftNu lrn.
17. ftuLx[t¾xh îtht yuze.mexe.Rsluh©e / zu. mexe. Rsluh©ele mwalt bwsclt bxehegjltk muBvj hsw
18. ftuLx[t¾xhu atÕþ ftbu mtEx Wvh zeSxj fubuht&e ftb atÕþ > vnujtk, åttÕþ ftbu <&t ftb ÃËKo
>lt Vtuxtud{tV BGþrl. yturVmbtk ytvJtlt hnuNu.
19. ftuEvK fthKmh xuLzh hœ fhJtbtk ytJu <tu ftuLx[t¾xh <u ykdu ftuEvK «fthltu n¬tu fu J¤<hle
btkdKe fhe NfNu lrn. yt Nh< MJeftgo ntug <ubKu s xuLzh ChÔþk.
20. bxehegÕm suJt fu hu<e, #xtu, mebuLx, vtEv, rJduhu MxtLzzo bxehegÕm MvuNeVefuNl «btKult
jtJJtlt hnuNu. ßgtk ftuE atuFJx l &E ntug ðgtk ytE.yum. ftuz «btKu bxehegÕm jtJJtLþk <&t
xuMx´d fhtJJtLþk hnuNu.
21. htßg / fuL÷ mhfth©elt JF<tu JF<lt ftgœt Bþsc su ftuE hfble fvt< fhJtlt nwfb
mhfth©eyu fhuj ntuE <u Bþsc ftuLx[tfxlt cejbtk&e fvt< fhJtbtk ytJNu.
22. juch JuÕVuh Vkz btxu ntjbtk htßg mhfth©eyu fhujt nwfb Bþscle hfb cejbtk&e ftve juJtbtk
Wvhtu¾< Nh<tu <&t rlgbtu buk ft¤SÃËJof Jtkae Au ylu blu fçËj bksqh Au.
ftuLx[tfxhle mrn <&t me¬tu yuze.mexe Rsluh (v.Ítul)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender No. 26.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].