Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹6.2 LAccepted-AOC JOYNAGAR NEAR MANIK DHAR GALI AGARTALA WEST TRIPURA | WEST TRIPURA | TRIPURA | 799002 | ₹6.2 L | 1 | Accepted-AOC He quoted rate lower 1 from other bidders |
| 2 | 2₹6.9 L+₹76,362.68 (12.4%)Rejected-Finance | ₹6.9 L+₹76,362.68 (12.4%) | 2 | Rejected-Finance He quoted rate lowest rank 2 |
| 3 | 3₹7.2 L+₹1.0 L (16.6%)Rejected-Finance LAXMANDHEPA MELAGARH SEPAHIJALA TRIPURA PIN 799115 | SEPAHIJALA | TRIPURA | 799115 | ₹7.2 L+₹1.0 L (16.6%) | 3 | Rejected-Finance He quoted rate lowest rank 3 |
| 4 | 4₹7.5 L+₹1.4 L (22.2%)Rejected-Finance 1 NO BENGALI PARA PASCHIM BASA AMARPUR GOMATI DISTRICT | ₹7.5 L+₹1.4 L (22.2%) | 4 | Rejected-Finance He quoted rate lowest rank 4 |
Tender Value
Refer Docs
EMD Value
₹17,967
Closing Date
27 Jul 2026, 4:00 pmClosed
Commandant 11th Bn TSR
Commandant 11th Bn TSR Pathaliaghat Sepahijala Tripura
Construction of 01 TTS Barrack size (40x20) half wall Galvalume sheet walling roofing with 4 GD Room 11th Bn TSR
2026_CC9_74415_1
No.4957-59/F.324(A)/TSR-11/QM
Open Tender
Civil Works
Works
90 days
11Th Bn TSR Pathaliaghat Sepahijala Tripura
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,000
₹17,967
7 Aug 2026
6 Jul 2026
27 Jul 2026
6 Jul 2026
27 Jul 2026
6 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50m, - All kinds of soil. | 16.73 | Cum | 231.6 | ₹3,874.67 |
| 2 | Supplying and filling in plinth, under floor, foundations etc. with sand(fine) from local quarry with all lifts including spreading in horizontal layers, watering, grading to required slope, ramming, consolidating and compacting each layer by using plate compactor or by any suitable method complete. | 15.22 | Cum | 1,177.3 | ₹17,918.51 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - - All work up to plinth level: (i). 1:3:6 ( 1 Cement: 3 fine sand : 6 graded well burnt brick aggregate 40mm nominal size) | 2.45 | Cum | 9,295.7 | ₹22,774.47 |
| 4 | (ii). 1:2:4( 1 Cement: 2 fine sand : 4 graded well burnt brick aggregate 20mm nominal size) | 1.59 | Cum | 10,742 | ₹17,079.78 |
| 5 | First class brick work in foundation and plinth including cost of all materials as required complete:- In cement mortar 1:4(1 cement: 4 fine sand). | 13.17 | Cum | 9,845.2 | ₹1,29,661.28 |
| 6 | Centering shuttering including struttings, propping etc. and removal of form work for: (i) Columns, Pillars, Piers, Abutments, Posts and Struts with wooden plank. | 18.5 | Sqm | 570 | ₹10,545 |
| 7 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50m and lift upto 1.5m- All kinds of soil. | 15 | Cum | 161.3 | ₹2,419.5 |
| 8 | Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5 km also including ramming and watering of the earth in layers not exceeding 20cm in trenches, plinth, sides of foundation etc. complete. | 12 | Cum | 338.6 | ₹4,063.2 |
| 9 | Half brick masonry work with first class bricks in superstructure upto floor five level including cost of all materials as required complete:- In cement mortar 1:4(1 cement : 4 fine sand). | 29.23 | Sqm | 1,533.5 | ₹44,824.21 |
| 10 | Steel work in built up tubular(round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. (i). Hot finished welded type tubes. | 1,450 | Kg | 146.2 | ₹2,11,990 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 14.64 MB
BOQ_75743.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .