| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.4 CrAccepted-AOC | ₹6.4 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹6.6 Cr+₹19.1 L (3.00%)Rejected-AOC | ₹6.6 Cr+₹19.1 L (3.00%) | L2 | Rejected-AOC L2 |
| 3 | L3₹7.1 Cr+₹73.2 L (11.5%)Rejected-AOC | ₹7.1 Cr+₹73.2 L (11.5%) | L3 | Rejected-AOC L3 |
| 4 | L4₹7.2 Cr+₹80.1 L (12.6%)Rejected-AOC | ₹7.2 Cr+₹80.1 L (12.6%) | L4 | Rejected-AOC L4 |
| 5 | L5₹8.3 Cr+₹1.9 Cr (29.6%)Rejected-AOC | ₹8.3 Cr+₹1.9 Cr (29.6%) | L5 | Rejected-AOC L5 |
Tender Value
Refer Docs
EMD Value
₹6.6 L
Closing Date
2 Nov 2020, 11:00 amClosed
Chief Engineer Project Shivalik
HQ CE (P) Shivalik, IDPL Complex, Virbhadra, Rishikesh-249202
Design and construction of two Major Pmt Bridges 60 Mtr and 50 Mtr span Steel Superstructure (Through type) over departmentally constructed abutment at Km 5.4 and at Km 11 on Sumna-Rimkhim road under 123 RCC/21 BRTF Project Shivalik in Uttarakhand
2020_BRO_589229_1
80263/Maj Pmt Brs SR Road/E8
Open Tender
Civil Works - Bridges
Lump-sum
540 days
Km 5.4 and Km 11 on Sumna Rimkhim road
As per Tender Document
12 documents required · 12 mandatory
₹0
₹6.6 L
Yes
3 Mar 2021
8 Oct 2020
3 Nov 2020
8 Oct 2020
2 Nov 2020
17 Oct 2020
9 Oct 2020 - 16 Oct 2020
Amount
Part-I
Design including proof checking and Construction of 60 mtr span Steel superstructure (Through Type) major permanent bridge over Departmentally constructed abutments at Km 5.40 on Sumna-Rimkhim road under Shivalik Project in Uttarakhand State as per Drg No. B-2114/B&T Dte/SLK/2020, Sheet No. 02 dated 02 Aug 2020 and special conditions and particular specifications of the tender documents. Construction works includes all preparatory work, placing of POT & POT cum PTFE bearings, Casting of superstructure/launching of steel superstructure and casting RCC decking, wearing coat having nonskid surface in uniform thickness, strip seal expansion joints, RCC crash barriers, kerbs, hand rails, drainage spout, load testing of superstructure of bridge, service, arrangement for utility, site clearance, painting of all exposed steel works and all other items of works required and necessary for the construction of superstructure but excluding works on approaches and approach slab.
Part-II
Design including proof checking and Construction of 50 mtr span Steel superstructure (Through Type) major permanent bridge over Departmentally constructed abutments over Patthar Nallah at Km 11.00 on Sumna-Rimkhim road under Shivalik Project in Uttarakhand State as per Drg No. B-2113/B&T Dte/SLK/2020, Sheet No. 02 dated 24 Jul 2020 and special conditions and particular specifications of the tender documents. Construction works includes all preparatory work, placing of POT & POT cum PTFE bearings, Casting of superstructure/launching of steel superstructure and casting RCC decking, wearing coat having nonskid surface in uniform thickness, strip seal expansion joints, RCC crash barriers, kerbs, hand rails, drainage spout, load testing of superstructure of bridge, service, arrangement for utility, site clearance, painting of all exposed steel works and all other items of works required and necessary for the construction of superstructure but excluding works on approaches and approach slab.
Navnirman Construction Company
VIJ ENGINEERS AND CONSULTANTS PVT. LTD.
M/S AGARWAL BROTHERS
Triveni Construction Company
Pawansut Infra Projects Pvt. Ltd.
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .