| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹30.2 LAccepted-AOC | ₹30.2 L | L1 | Accepted-AOC Work Order. |
| 2 | L1₹30.2 LRejected-AOC | ₹30.2 L | L1 | Rejected-AOC 2nd lowest. |
| 3 | L1₹30.2 LRejected-AOC | ₹30.2 L | L1 | Rejected-AOC 2nd lowest. |
| 4 | L1₹30.2 LRejected-AOC | ₹30.2 L | L1 | Rejected-AOC 2nd lowest. |
| 5 | Rejected-Technical AT WARD NO 22 NEAR SIVA MANDIR HANUMAN PO BHARATPUR DIST KHURDHA 751003 | BHARATPUR | KHURDHA | ODISHA | 751003 | - | - | Rejected-Technical Not Qualified. |
Tender Value
₹30.2 L
EMD Value
₹30,500
Closing Date
8 May 2026, 5:30 pmClosed
S.E, RWSS Division, Angul at Talcher
At.- Baghuabole, Hatatota, Talcher, Angul, Odisha
RPWS Project to Upper Sahi habitation of Balipata village under Kaniha Block in Angul District.
2026_RWSS_128539_1
01/SE/RWSS/2026-27 Dt. 21.04.2026
National Competitive Bid
Civil Works - Water Works
Percentage
180 days
Angul
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹30,500
Yes
25 Jun 2026
29 Apr 2026
11 May 2026
29 Apr 2026
8 May 2026
29 Apr 2026
29 Apr 2026 - 5 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | CONSTRUCTION OF PUMP HOUSE : Earth work in excavation of foundation in all kinds of soil including dressing and leveling the bed and breaking clods to maximum 5cm to 7cm and depositing the excavated materials at places away from the work site within 50m initial lead w & 1.5m initial lift as directed by the Engineer-In charge. | 15.51 | Cum | 299.52 | ₹4,645.56 |
| 2 | Supplying all labour, & T&P materials for Filling Foundation & plinth with Sand well screened including well watered and rammed, cost, conveyance & royalty of all materials to work site etc. complete as directed by the Engineer-in-charge. | 2.55 | Cum | 846.55 | ₹2,158.7 |
| 3 | Supplying all labour & T&P materials for cement concrete (1:4:8) with 4cm size hard granite crusher broken metal for RCC works including hoisting and laying, cost, conveyance and royalty charges etc. all complete to work site as directed by the Engineer-In-Charge. | 2.55 | Cum | 6,703.84 | ₹17,094.79 |
| 4 | Supplying all labour & T&P materials for brick work with Fly Ash Bricks of 25Cm x 12 Cm x 8 Cm size having crushing strength not less than 95Kg/ Cm2 in cement mortar (1:6) in foundation & Plinth after immersing the bricks for 6 hours in water before use including making necessary projections, watering, curing etc. complete. with cost conveyance & royalty of all materials to work site as directed by the Engineer-in-charge. | 9.63 | Cum | 5,644.5 | ₹54,356.54 |
| 5 | Supplying all labour & T&P materials for brick work with Fly Ash Bricks of 25Cm x 12 Cm x 8 Cm size having crushing strength not less than 95Kg/ Cm2 in cement mortar (1:6) Super structure after immersing the bricks for 6 hours in water before use including making necessary projections, watering, curing etc. complete with cost conveyance & royalty of all materials to work site as directed by the Engineer-in-charge. | 11.24 | Cum | 5,677.5 | ₹63,815.1 |
| 6 | Supplying all labour & T&P materials for cement concrete (1:2:4) with 12mm size HGCB chips for RCC works including hoisting and laying, cost, conveyance and royalty charges etc. all complete to work site as directed by the Engineer-In-Charge. | 4.08 | Cum | 9,651.26 | ₹39,377.14 |
| 7 | Supplying all labour T&P and materials at site for labour for cutting, bending, binding of M.S rod & tying the grills and placing in position including cost, taxes & conveyance of tor steel and binding wire 18 to 20 gauge complete as per direction of Engineer-In-Charge. | 4.08 | Qntl. | 6,151 | ₹25,096.08 |
| 8 | Supplying all labour & T&P materials for Rigid and smooth centering & shuttering for RCC works including false work & dismantling them after casting including, cost, conveyance & taxes etc. all complete as directed by the Engineer-in-charge. I.Plinth Bend | 7.18 | Sqm | 159.66 | ₹1,146.36 |
| 9 | Lintel | 1.4 | Sqm | 397.37 | ₹556.32 |
| 10 | Beam | 2.96 | Sqm | 1,031.19 | ₹3,052.32 |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_588992.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.66 MB
DTCN_Balipata.pdf
Tender Documents • 0.38 MB
BOQ_588992.xls
BOQ • 0.36 MB
Corrigen.pdf
PDF • 0.44 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .