Loading…
Loading…
Tender ID
Tender Value
₹98.2 L
EMD Value
₹98,245
Closing Date
6 Mar 2026, 6:00 pmClosed
Dy.Minicipal Commissioner - West Zone
Maintenance,Renovation & Civil Work at Different Municipal Building,Garden ,Municipal School and other Require Differant Places in Paldi Ward at West Zone.(A.R.C. TENDER)
279117
8/25-26 (T.N.13)
Open
Civil Works - Others
Works
Ahmedabad
4 documents required · 0 mandatory · 4 optional
₹2,400
Yes
Municipal Commissioner, Ahmedabad
₹98,245
Yes
21 Feb 2026
21 Feb 2026
21 Feb 2026
6 Mar 2026
21 Feb 2026
Name of work:-"Maintenance,Renovation & Civil Work at Different Municipal
Building,Garden ,Municipal School and other Require Differant Places in Paldi Ward at
West Zone.(A.R.C. TENDER)"
No. Qty Items Rs. Ps. Per Rs. Ps.
1 15 Demolition of Brick work and stone masonry including
stacking of serviceable materilas and disposal of
unserviceable materials with all lead and lift. (ii) In
2 10 Demolition of RCC work includes stacking of
serviceable materials and disposal of unserviceable
materials with all leads and lifts. 1047.38 Cmt
3 50 Dismentaling of sheet roofing including ridges, hips,
valleys ,gutters etc. stacking of serviceable materil as
and disposal of unserviceable materials with all lead
and lift.(i) G.I.sheet roofing. 47.25 Smt
4 1500 Dismentling steel work including distempering
and stacking the materials with all lead and lift. 3.63 Kg.
5 400 Removing and scraping of old deteriorated plaster of
any thickness from wall / RCC member including
stacking of serviceable material and disposal of
unserviceable from site of work with all lead and lift 19.38 Smt
6 400 Dismentaling tiled of stone floors laid in mortar
including stacking of serviceable materilas and disposal
of unserviceable materials with all lead and lift. 47.25 Smt
7 20 Dismentling doors, windows, ventilators etc. (wood
orsteel) shutters including chowkhats architraves, hold
fasts and other attachment etc.complete and stacking
the material within all lead and lift.(i) Not exceeding
Sq.M. in area. 185.85 Each
8 100 Dismentling CI pipes GSW pipes abd AC rain water
pipes with fittings and clamps including stacking the
materials with all lead and lift (for any dia, of pipe)
9 40 Dismantling santtary fittings like wash basin WC pan
Indian and European type, flushing tank etc. including
stacking the materials with all lead and lift
10 40 Dismentling barbed wire in fencing including making
rolls and also including dismentling fencing posts
including all earth work concrete in base and making
good the disturbed ground stacking useful materials as
directed and disposing as directed and disposing of the
unserviceable materials with all lead and lift. 66.15 Rmt
11 1000 Scraping oil paint from steel and other metal surface
and making the surface even 48.83 Smt
12 Excavation for foundation up to1.5 m depth including
sorting out and stacking of useful materials and
disposing of the excavated stuff upto 50 mt. lead.(A)
Loose or soft soil
a 95 0 to 1.50 mt.depth
b 10 1.5 to 3.0 mt.depth 128.52 Cmt
13 1 Providing and laying cement concrete 1:5:10 (1-
Cement:5-finesand:10-graded brick bat aggregates
mm nominal size) and curing complete excluding cost
of formwork in(A) Foundation and Plinth 2457.01 Cmt
14 70 Providing and laying cement concrete1:5:10 (1-
Cement: 5- coarses sand and:10-hand broken stone
aggregates 40mm nominal size) and curing complete
excluding cost of formworkin (A) Foundation and
Plinth (upto 10 ton). 2492.51 Cmt
15 20 Providing and laying cement concrete1:4:8 (1-Cement:
4- coarses and:8-hand broken stone aggregates 40mm
nominal size) and curing complete excluding cost of
formworkin (A) Foundation and Plinth (upto 10 ton). 2653.67 Cmt
16 2 Providing and laying cement concrete 1:3:6 (1-Cement
: 3- coarse sand : 6- hand broken stone aggregates
mmnominal size) and curing complete excluding cost
of formwork in (A) Foundation and Plinth.. 2956.44 Cmt
17 Providing and laying cement concrete work 1:2:4 (1-
cement:2- coarse sand:4-graded aggregates 20mm
nominal size) curing complete excluding cost of
formwork and reinforcement.
a 10 Foundations, footings, base or columns and mass
concrete 3923.53 Cmt
b 2 Slabs, landing, shelves, balconies, lintels, beams,
girders and cantilivers upto floor two level 4012.47 Cmt
c 2 Independent piers, columns, and pillars, upto floor two
level 4012.47 Cmt
18 Providing and laying controlled cement concrete /
Ready Mix Concrete of M-200 and curing complete,
excluding the cost of form work and reinforcement for
reinforced concrete work in:
30 (A) Foundations, footings, base of columns, and mass
concrete. 3977.88 Cmt
2 (B) Walls from top of foundations/level up to floor
Four level. 4484.17 Cmt
2 (C) Slabs, landing shelves, Balconies, lintels, beams,
girders, and cantilever, up to floor Four level. 4460.36 Cmt
10 (D) Columns, pillars, posts, and struts, up to floor Four
level. 4558.2 Cmt
2 (E) Staircase up to floor four level. (excluding landing)
2 (F) Vertical and horizontal fins up to floor four level.
19 Providing form work in ordinary timber planking so as
to give a rough finish including centering,shuttering
strutting and propping etc height of propping and
centering below supporting floor to celling not
exceeding 4M &removal of the same fo in situ
reinforced or plain concrete work upto floor four level
20 Foundation, footings, bases of columns etc. and mass
concrete 171.68 Smt
22 (B) Flat surfaces such as soffits of supspened floors
slabs Landings and the like. (1) Floors etc. upto
mm in thickness. 252 Smt
2 (B) Flat surfaces such as soffits of suspended floor roof
slabs Landings and the like. (2) Floors etc. above
200mm in thickness. 270.9 Smt
4 Vertical surface such as walls (any thickness) partitions
and the like including attached buttresses & string
course & the like. 229.95 Smt
20 (G) Columns PillarsPosts and struts. (1) Square
Rectangular Polygonal in plan. 297.68 Smt
2 (2) Circular or curved in plan.
50 (H) Sides and soffits of Beams Beam Haunchings
cantilevers Girders Bressumers and Lintels not
exceeding 1 M. in Depth
20 1750 Providing TMT Bar FE 415 reinforcement for R.C.C.
work including bending, binding and placing in
position complete upto floor two level 66.59 Kg.
21 15 Filling available excavated earth (excluding rock) in
trenches. plinth, sides of foundations etc. in layers not
exceeding 20 cm. in depth consolidating each
disposited layer by ramming and watering. 129.1 Cmt
22 20 Filling in plinth with sand under floors including
watering ramming, consolidating and dressing etc.
complete. 455.63 Cmt
23 4 Filling in foundation and plinth with murrum or
selected soil in layers of 20 cm. thickness including
watering, ramming and consolidating etc.
(Ahmedabad City Building SOR 2023-24) 286.2 Cmt
24 Brick work using common burnt clay building bricks
having crushing strength not less than
35kg./Sq.Cm.in foundation and plinth in Cement
Mortar1:6 (1-Cement :6 - fine sand)
A 20 (A) Conventional (upto 10 ton) 3981.21 Cmt
25 Extra Rate for brickwork in Above Item for
super structure above plinth level upto floor two
a 10 (A) Conventional (upto 10 ton)
d 2 D) above floor two level Item No. 2(6.13) (B)
26 5 Half brick masonry in common brunt clay building
bricks having crushing strength not less than
Kg/Sq.Cm. in Cement mortar 1:5 ( 1-Cement : 5 coarse
sand) in foundation and Plinth conventional
brickwork (up to 10 ton) 593.9 Smt
27 5 Extra for half brick masonry in superstructure above
plinth level upto floor two level. (B) conventional
28 80 Providing and laying polished Kota stone slab flooring
over 20mm (Average) thick base of cement mortar 1:6
(1-cement : 6-coarse sand) or L.M. 1.1.5 (1-Lime putty
:1.5 - coarse sand) laid over and jointed with grey
cement slurry mixed with pigment to match the shade
of slab including rubbing and polishing etc. complete.
(A) 25mm thick 982.83 Smt
29 5 Providing and laying polished kota stone slab 25mm
thick in risers of steps,skirting Dedo and pillars laidon
10mm thick cement mortar 1:3 (1-Cement : 3coarse
sand) and jointed with gray cement slurymixed with
pigment to match the shade of slabincluding rubbing
and polishing etc. complete. 1176.03 Smt
30 15 Labour Work for moulding the polish kota stone
surface rate also including provding cutting and grinder
machine for molding work etc.complete as directed. 150 Rmt
31 150 Labour work for Polish kota stone surface rate also
including providing cutting and grinder machine for
molding work etc comlete as directed.
32 120 Providing and laying white glazed tiles 6mm thick in
flooring tread sofstep sand landing laid on abed of
12mm thick cement mortar 1:3(1-cement:3-coarse
sand)finishing with flush pointing in white cement. 908.17 Smt
33 10 Providing and laying White / Colour glazed tiles 6 mm.
thick in skirting, risers of steps and dedo on 10 mm.
thick cement plaster 1:3 (1 cement : 3 coarse sand) and
jointed with white cement slurry.
34 125 Providing and laying coloured glazed tiles of the size
300mm x 200 mmx 8mm/ 300mm x 450mm x 8mm in
skirting, riser sof steps and dedo on 10mm. thick
cement plaster 1:3 (1cement :3coarse sand) & jointed
with white cement slurry.
35 20 Providing and laying Ceramic tiles 6mm thick in
flooring treads of steps and landing laid on a bed of
10mm thick cement mortar 1:3 (1-cement : 3- coarse
sand ) finishing with flush pointing in white cement
36 5 Providing and laying marble stone slab flooring over
20 mm. (Average) base of cement mortar 1:6 (1
cement: 6 coarse sand) or L.M. 1:1.5 laid and jointed
with grey cement slurry including rubbing and
polishing complete: (A) Marble slab 20 mm. thick. 2194.63 Smt
37 20 Providing and laying Vitrified tiles 8 to 10 mm thick
24'' x 24'' in flooring treads of steps and landing laid on
a bed of 12mm thick cement mortar 1:3 (1- cement : 3-
coarse sand ) finishing with flush pointing in white
cement. 1062.5 Smt
38 2 Providing and laying Vitrified tiles 8 to 10mm thick,in
skrting risers of steps and dedo on 10mm thick cement
plaster1:3(1-cement:3-coarsesand)and jointed with
white cement slurry 1130.15 Smt
39 130 Providing & Laying 18 mm thick Mirror polish granite
flooring for counter , stair -riser , tread , skirting , dedo
etc. machine cut or chiselled on bed of cement mortar
1:1 pointing with neat cement slurry incl. moulding etc.
comp. as per instruction of engineer in charge. 2690 Smt
40 100 P/F grouting with epoxy branded material filling with
groove cutting of 2 to 3 mm in tiles flooring and
cladding work etc. comp. by as per engineer incharg. 260 Smt
41 650 Providing and laying broken china mosaic flooring for
terrace using 12 mm to 20 mm broken pieces of glazed
tiles to be laid over cement mortar 1:3 to plain or slope
and to be tempered to bring mortar creme out upto
surface using white cement including rounding off
junctions and extending them upto 15 cm along the
wall,clearing with water and oxalic acid etc. as
directed. 739.89 Smt
42 200 Providing 10mm thick cement plaster in single coat on
brick/concrete walls for interior plastering upto floor
two level and finished even and smooth in (i)Cement
mortar 1:3 (1-cement:3-sand) 127.58 Smt
43 150 Providing 15mm thick cement plaster in single coat on
Rough (Similar)side of single or half brick walls for
interior plastering upto floor two level and finished
even and smooth in (i) Cement mortar 1:3 (1-cement:3-
sand) and smooth / Mala Plaster/ neat cement slurry in
44 20 Providing & fixing 15 cm wide chicken mesh jali with
nails & then application of 15 mm plaster on R.C.C. &
masonary joints as per dir. of engg. In charge. 35 Rmt
45 150 20mm thick sand faced cement plaster on walls upto
height 10 metres above ground level consisting of
12mm thick backing coat of C.M. 1:3 (1-cement : 3-
sand) and 8mm thick finishingcoat of C.M. 1:1 (1-
cement : 1-sand) etc. complete. 297.68 Smt
46 2 Providing & laying Stone chips Plaster with / without
grooves for making panels incl. backing coat of plaster
in C.M. (1:3) in grey cement as per dir. Of consultants.
47 4 Providing and fixing sheet glass, selected quality
(Type-C) bedded in putty and fixed with wooden
beading including the cost of wooden beadings of first
class teakwood and necessary cutting of glass. (1)
mm thick. 1143.05 Smt
48 4 Providing and fixing suncontrol film of approved shade
and quality. Approved brand Garware and equivalent. 650 Smt
49 5 Providing and fixing Lock at drawer of counter type
Table including fixing any one of the materials like
wooden patti, favicol, khilli, screws, nut-bolts,
clamping, or any kind of other similar required work as
directed by engineer incharge etc. comp. 540 No
50 400 White washing with lime on wall surface (two coats) to
give an even shade including thoroughly booming the
surface to remove all dirt, dust;mortar drops and other
foreign matter. 12.29 Smt
(a) 400 Extra over above item for every subsequent coat of
colour wash with lime on wall surface 5.67 Smt
51 600 Colour washing with lime on wall surface (two coats )
over and including a primary coat of white washing to
give an even shade after through brooming the surface
to remove all dirt, dust, mortar drops and other foreigh
matter. 12.29 Smt
(a) 600 Extra over above item for every subsequent coat of
colour wash with lime on wall surface
52 2000 Removing dry or oil bound distemper/paint by a
washing and scraping and sand papering the wall
surface smooth including necessary repairs to scratches
53 327.00 Extra over above item for removing dry oil bound
distemper on ceilings and sloping roofs.
54 500 Distempeing (Two coats) with oil bound distemper of
approved brand and manufacture and of required shade
on wall surfaces to give an even shade, over and
including a priming coat with distemper primer of
approved brand and manufacture after thoroughly
brushing the surface free from mortar dropping and
other foreign matter and also including preparing the
surface even and sand papered smooth. 76.08 Smt
55 200 Extra over above Item for every subsequent coat of
approved brand and manufacture. 30.09 Smt
56 65 Extra over above Item 54 for distempering with oil
bound washable distemper on celling and sloping roofs. 8.04 Smt
57 500 Wall painting (two coats) with plastic emulsion paint of
approved brand and manufacture on undecorated wall
surface to give an even shade including throughly
brushing the surface free from mortar droppings and
other foreign matter and sand papered smooth. 78.44 Smt
58 40 Extra over above item 57 for every subsequent coat of
wall painting with plastic emulsion pain of approved
brand. 33.39 Smt
59 16 Extra over above item 57 for painting with plastic
emulsion paint of approved brand on ceilings and
sloping roofs. 5.36 Smt
60 500 Applying two coats of Birla (white cement based) or
Asian (acrylic lapy- putty) or equivalent & two coats of
primer of approved brand and manufacture on new wall
surface to give an even shade including thoroughly
brushing the surface free from mortar dropping and
other foreign matter and sand papered smooth. 40.19 Smt
61 2000 Finishing wall with weather proof exterior
emulsion paint on wall surface (two coats) to
give an required shape even shade after thoroughly
brushing the surface to remove all dirt, and
remains of loose powdered materials.etc
complete 113.4 Smt
62 100 Painting two coats (excluding priming coat) on new
steel and other metal surface with synthetic enamel
paint, brushing to give an even shade including
cleaning the surface of all dirt, dust and other foreign
matter. 64.66 Smt
63 1000 Painting two coats (excl. priming coat) on peviously
painted steel & other Metal surfacer with enamel
paint, brushing, interior to give an even shade incl.
cleaning the surface of all dirt, dust and other foreign
matter. 54.35 Smt
64 50 Painting two coat (excluding priming coat) on
previously painted wood and wood based surfaces with
enamel paint to give even shade including cleaning of
all dirt, dust and other foreign matter. 106.96 Smt
65 20 Arrangement of zula with two or nece. skilled labour
for repairing & maintenance work out side building
work etc. complete as per insructer incharge(At any
floor level) 950 No
66 20 Providing and laying Texture paint of 1.00 mm thick
and of approved shade, pattern on wall / ceiling of
plastered or wooden panel / ceiling. Rate include
necessary back coat laapi, texture grout, and finishing
coat of plastic emulsion paint 950 Smt
67 4 Providing & Fixing Angle cock of " Ess Ess" - Trend
series or equivalent standard make as approved by
engg. in charge all complete.
68 15 Provdg. & laying S.W. Gully trap with C.I. garting
brick masonry chamber & water tight C.I. cover with
frame of 300 mm x 300 mm size ( inside) with standard
weight.sqare mouth trap size 150 x100 mm P or R
69 8000 Providing erecting and fixing double coated Syntex or
equivalent PVC. (ISI) water tank of required capacity
each with all necessary fittings and connection etc.
complete on terrace. 4.61 Litre
70 20 Providing and fixing PVC SWR Nahni trap IS
for drain - 75mm diameter with jali of the following
nominal diameter of self cleansing design with C.I
scread down or hinged grating including the cost of
cutting and making good the walls.
71 Providing laying and jointing in true line and
level.U.P.V.C. Pipe(SCH-40) for cold water including
fittings make PRINCE/ SUPREME/ASTRAL
/FINOLEX or equivalent as approved by
EngineerInCharge.Pipes shall be fixed on the wall with
the help of clamp at every two metre C/C or shall be
concelled as directed including necessary fittings etc.
including testing of pipe and joints and fixing the same
with adhesive solvent, including cost of all materials.
72 Provdg. & fixing UPVC handle valve of
Prince,Supreme , Astral, finolex or equivalent make as
per dir. Of engg. In charge.
A 20 (A) 15 mm dia
B 2 (B) 20 mm dia
C 20 (C) 25 mm dia
D 10 (D) 40 mm dia.
E 10 (E) 50 mm dia.
73 Provdg. And fixing to wall ceiling and floor 10.00 kg.
F/Sq.Cm working pressure polythelene pipes of the
following outside diameter, low, density, complete with
special flange compression type fittings, wall clips etc.
making good wall ceiling and floor.
a 20 (A) 75mm dia
b 20 (C)110 mm dia
74 20 Providing and fixing water closet squatting pan (Indian
type WC Pan) size 580mm (Earthwork, bed concrete,
foot reste and trap to be measured and paid for
separately) (A) Vitreous China. (I) Long pattern=
White colour 926.1 No
75 10 Providing and fixing wsh down water closet (European
type, W.C. Pan) with integral P or S trap including
jointing the trap with soil pipe in Cement Mortar 1:1
(1-Cement : 1-fine sand) (Seal and cover to be
measured and paid for separately) (A) vitreous China
Pattern :(i) in white colour 1290.8 No
76 20 Providing and fixing C.P. brass waste for washbasin or
sink. (A) 32mmdia. 67.24 No
77 20 Providing & Fixing 0.45 to 0.60 long Lead Connection
for Urinal/Wash basin etc. comp. as per Inst. of engg.
78 4 Providing and fixing 12.5 Litres low level flushing
cistern with a pair, of C.I. or Mild brackets, complete
with fittings such as lead valve less syphon, 15mm
nom.nal size brass ball valve with polythene float, C.P
brass handle unions and couplings for connections,
with inlet, outlet and overflow pipes, 40mm dia.
porcelain enamelled flush bend including cutting holes
in walls and making good the same connecting the
flush bendwith cistern and closet (overflow pipe to be
measured and paid for separately)(A) Vitreous China
(I) In white colour 2321.21 No
79 10 Providing and fixing plastic seat and cover for wash
down water closer with C.P. brass hinges and rubber
buffers. (B) Black plastic seal and cover.
80 12 Providing and fixing Urinal of approved quality
including connection with trap and with integral
longitudinal flush pipe.(A) Squating plate pattern white
earthenware 550mm x 300mm. 1535.63 No
81 Providing and fixing chromium plated brass half run
flush cock of approved quality including fixing in pipe
line etc. complete.
2 (1) 20 mm dia.
82 20 Providing & Fixing PVC Body Chromium Finish Hand
Faucet with Flexible Pipe of Approved Brand &
Manufacturers with holder etc. complete as per
direction of E.I.C. 375 No
83 10 Providing and fixing wash basin with single hole for
pillar tap with C.I. or M.S. brackets painted with
including cutting holes and making good the same but
excluding the fittings. (A) vitreousChina (II) Flat back
wash basin 550mm x 400mm size (I) in white colour.
84 2 Providing and fixing Kitchen sink with C.I. or M.S.
brackets, painted white including cutting holes in walls
and making good the same but excluding fittings. (C)
Vitreous China Sink.(i) 600mm x 450mm x 150mm
size 2257.69 No
85 15 Providing and fixing C.P. brass shower rose with
15mm or 20mm inlet.(A) 100mm dia. Each 279.37 No
86 10 Provdg. & fixing 600mm x 450 mm Bevelled edge
mirror of superior glass mounted of .6 mm th. A.C.
sheet or plywood sheet and fixed to wooden pluge with
C.P. brass screws and washers. 825.48 No
87 5 Provdg. & fixing C.P.Brass towal rail complete with
C.P. brass brackets fixed to wooden plugs with CP
Brass screws.(600 mmx 20 mm size) 597.22 No
88 Provdg. & fixing CP Brass screw down bib taps of
25 (I) 15mm dia
89 10 Provdg. & fixing C.P.brass pillar tap capstan head,
screw down high pressure with screws shanks and back
nuts. (A) 15 mm dia 305.67 No
89- 6 Providing and fixing 15mm Doctor Bib cock of
A Approved brand including fixing in exi. line & rate
includes removing old cock etc. as per inst of eng in
charge. 5400 No
90 Supplying necesary PVC/UPVC/Other hardware,G.I.
Fittngs etc.comp.
a 10 Conseal cock
b 40 Conseal cock (PVC)
c 60 6"x6" SS jali 75 No
d 100 15mm bib tap (PVC) 60 No
e 100 waste pipe 55 No
f 20 25mm Flush cock 750 No
g 30 15mm shower 350 No
h 100 UPVC Tee,Bend,Couplin 55 No
i 60 Lead Connection 260 No
j 70 15mm Handle Valve (UPVC) 275 No
k 30 25mm Handle Valve (UPVC) 345 No
l 30 Nahni Trap (PVC) 255 No
m 60 15mm dia UPVC Pipe 52 Rmt
n 40 25mm dia UPVC Pipe 75 Rmt
o 20 Water closet squatting pan (Indian type WC Pan) 700 No
p 10 Wash down water closet (European type WC Pan) 890 No
q 20 Wash basin
r 40 Plastic seat and cover for WC
s 20 Urinal Tub
t 440 Hand Faucet with Flexible Pipe (PVC)
u 10 Mirror (PVC)
v 10 Towel Rail 425 No
x 10 PVC Flush tank
91 Providing and supplying of labour for necessary
excavation, cleaning, Shifting of Material Or any other,
or for any other work as directed by Engineer In
a 8 Mistry 692 No
b 150 Plumber (Fitter) 697 No
c 30 Welder 689 No
d 550 Mazdoor at Day Male 493 No
e 50 Supervisor 711 No
92 18 Supplting of welding machine / gas cutter including
cost of welding rods/gas, Transportation, including
carting from site to work place. 1500 No
93 18 Hiring of Three wheeler carrier (Chakado/Rixa)
considering 10 Hrs. as working day hours incl.Driver 1153.24 Day
94 300 Providing and laying Cement concrete flooring for
I.P.S. 1:2:4 (for Indian Patent Stones) (1 cement:
coarse sand: 4 graded stone aggregate 20 mm. nominal
size) lain in layer finished with a floating coat of net
cement.(40 mm th) 297.68 Smt
95 3500 Providing and fixing M.S. grills of required pattern to
wooden frames of windows etc. with M.S. flats at
required spacings and frame alround, square or round
bars with round headed bolts and nuts or by screws (A)
Plain Grill. (upto 10 ton) 100.17 kg
96 50 Providing and fixing M.S. grills of required pattern
to wooden frames of windows etc. with M.S. flats at
required spacings and frame alround, square or round
bars with round headed bolts and nuts or by screws (A)
Ornamental Grill. (upto 10 ton) 143.64 kg
97 2 Providing and fixing in position collapsible shutters
with vertical channels 20 x 10 x 2 mm braced with flat
iron diagonal 20 x 6 mm size with top and bottom rails
T iron 40 x 40 x 6 mm with 38 mm dia steel pulleys
complete with bolts, units, locking arrangements,
stoppers, handles, including a priming coat of red lead
paint 5391.23 Smt
98 6 Providing & Fixing in position Alluminium doors with
frame using approved quality anodised extruded
alluminium section as approved by Engg.in
charge(Jindal alluminium)(a) Frame sections
101.6x44.45 mm (b) Shutter bottom vertical & top
section 83.5x44.45 (wt.1.31 kg/mt.)(at 1.31 kg/mt) (c)
Shutter bottom section at 114.3x44.45 mm at (1.37
kg/mt) Shutter middle section at 100x44.3 wt.(1.37
kg/mt) incl.providing & installing 5 mm thick approved
color Acrylic sheet of standard quality fixed with
glazing chips on upper pannel & Laminated sheet on
lower pannel (wtt.0.13 kg/Rmt) etc.comp.as direction
of engg.in charge. 2900 Smt
99 8 Providing & Fixing in position External quality high
grade anodized (preferably M-6), Aluminum Door
,Ventilations, window Fix /sliding type - 2/3/4 Track
with frame & shutter using approved quality Metalic
color anodised aluminum section of standard weight of
"Jindal" or equivalent make, including P/F installing
mm thick approved Clear or Frosted Glass of
Modiguard or equivalent make with Necessary Fixtures
& Fittings of standard quality as approved by engg.in
charge etc. complete as directed and approved. Rate
includes all necessary hardware, fixtures, locks,
handles, door-stop, door-magnets, etc. as required upto
the fullest satisfaction of consultants. The ventilations
shall be of movable type. 2850 Smt
100 4 Providing and fixing window having extruded
aluminum Colour anodized section frame main outer
size 127mm x 38.10mm x 1.35mm @wt. 1.384kg/m, 2119.14 Smt
horizontal Four track member size 122.20mm x
31.75mm x 1.10mm@ wt 1.205 kg/m, vertical member
of size 122.20mm x 31.75mm x 1.50mm @1.398 kg/mt
with sliding shutters of horizontal member size 40mm
x 18mm x 1.29mm@ 0.456kg/mt ,vertical member of
size 40mm x 18mm x 1.29mm @ 0.456 kg/mt with
mm thick transparent bronze colour tinted float glass
with powder coated aluminum fittings and fixtures and
transparent silicon sealant glass fixing to frame as per
details etc complete for window.
101 Providing and fixing 35mm thick shutters for Doors,
windows and clear story windows including anodised
alluminium butt hinges with necessary screws.
1 (II)Fully panelled 5478.89 Smt
102 20 Provoding and fixing flush door shutters, solid core
construction with frame of first class hardwood with
cross board and face veneer or plywood face panels,
including anodised alluminium butt hinges with
necessary screws. (B) Non-decorative type and block
board core anodised alluminium butt hinges in flush
door shutters (2) 35 mm thick. 2404.5 Smt
103 9 Providing and Fixing 1 H.P. Electrical monoblock or
submarcible water pumps withmotor and required cable
and switch board of approved brand and make
etc.comp.as directed. 6800 Set
104 50 Providing cement vata (10cm. x 10 cm. size) quarter
round in cement mortar 1:1 including neat cement
finishing, watering etc. complete. 23.45 Rmt
105 10 Carring out plinth treatment to post construction
/existing structure by spraying chemical solution for
termite control treatment including labour and material
consistment with I.S.Ispecification. Using Chlordene
and Chiorpur files 20EC. AsPer 6131_paret
Consentration Weight one percentisre commendedi.
eonelitre 20ECchemical emulsion with 19 liter give1%
concrent ration inclusive of one litre chemical emulsion
appication at the rate of 5Litre chemical /Sqm of
surface is recommended as per I.S. 104.9 Smt
106 330.0 Conveyance charge of earth,lime,murrum, building
rubbish,manual garbage,sludge ,excavated rock,fly ash,
aggregate of any kind etc. comp. up to 5Km. lead 235.51 Cmt
107 1500 Consruction of under ground tank with 23 cm th.
Masnory wall in c.m. 1:6 incl. Excavation, necessary
23 cm B.B.C.C.1:5:10 for foundation and providing
R.C.C. 1:2:4 for top & bottom slab of 12 mm. th. And
7.5 mm. th R.C.C.paradi on face of internal side of
periphary of the tank incl. formwork T.M.T. steel
reinforcement as per given design, vibrating,curing, &
mixing of approved water proofing material with every
50 Kg.bag of cement ,inside plaster in C.M. 1:3 and
vatta in C.M.1:1 inside tank .P & F F.R.C. frame cover
of size 600 x 450 mm , fiber steps etc. comp as dire. 6 Litre
108 700 Providing and Laying of Rubber Moulded Paver Block
Grey/Coloured 60 mm thick, M-35 Grade of any size
shape (Usually Uni-Paver Blocks) using black trap
good quality aggragate of 20 mm nominal size for
footpath, parking areas, service lanes and other areas as
mentioned in the drawing / instruction of engineer in
charge. Cost includes formworks using rubber mould,
Rate providing and laying paver blocks as per required
grading and specification. The paver block shall be
mechanically compacted. The work of paving blocks
shall be executed in line and level by skill mason of
flooring work only. It should be laid in such a way that
the no cutting of the paver block to be necessary. if
cutting of paver block necessary then it should be cut 501.6 Smt
by machine only and carting. The finished surface of
the paver block shall have resonably good, plain
finished. Paver blocks shall be compacted and shall be
relaid if necessary. Gravel or such type of materials
shall not be allowed for production. Laying on 5 cms
109 25 Providing Kerbing of size 300x300x75 mm of M-25
with good finishing rate incl.pointing in C.M. (1:1) &
fixing in good line , level & plumb etc. comp. 219 Rmt
110 75 Supplying and fixing of 300 mm-L x 150 mm-B x
mm-H Kerb block for Footpath in M-20 grade using
20mm nominal 350.89 Rmt
111 20 Providing & Fixing Door closer - complete of
Approved make to wooden / Aluminium Doors as per
direction of engg. In charge. 850 No
112 2 Providing & fixing Approved Make Glass Mosaic on
Plastered surface. Glass mosaic shall be of 25 mm x
mm size & 4 mm thickness pasted on a net / paper
sheet.Glass mosaic pieces are mounted uniformly on
the net / paper sheet. colour shade combinations &
Pattern as approved by consultants. Rate includes all
material, Labour , Scaffolding etc. complete. 2569 Smt
113 40 Providing & Fixing 2 mm thick F.R.P.sheet of
Approved Quality & Color / Pattern as per Consultant's
design also includes required fabrication structure in
the grid of 2'-0x2'-0 size using hollow pipe of 16 gauge
& size 2"x1" & 1"x1" , G.I. & Bitumen Washers,
Silicon paste application for fixing the sheet . Rate also
includesnecessary bending, cutting , labor charges
Zinc Primer coat & Two coats of oil painting of color
as approved by consultants & making good the wall. 1930 Smt
114 2 Providing 2 mm thick F.R.P. Gutter with necessary
M.S. Supporting Brackets) (Appr. Rate) 400 Rmt
115 10 Providing and fixing 30mm thick solid both side
prelam PVC door shutter (sintex door-equivalent) with
necessary alluminium fitting with EL-7 section frame
(Appr. rate) 1617 Smt
Providing and supplying ISI marked only standard
length Stonewate pipes in standard lengths of following
class and diameter including all taxes,insurance,
transportiton, fright charges, octroi,inspection charges,
loading,unloading, conveyance to departmental stores,
116 stacking etc. complete
Lowering, laying and jointing stone ware pipes of
following diameters with cement joints in C.M.1:1
proportion in proper position , grade and alignment at
all level as directed by Engineer-in- charge including
conveyance from stone to site of work, Jointing
117 material etc.comp
10 100 mm 58 Rmt
10 150 mm 88 Rmt
Constructing Chamber of following size including
excavation, refilling, BBCC (1:5:10) for foundation,
C.C.Channel (1:2:4), finished 15 mm thick cement
plaster inside in CM 1:3, finishing with cement slurry,
Brick masonary in CM 1:5 & excluding the cost of
118 chamber seat cover etc..completed.
0.60 X 0.45 mt. size Inside Clear, Depth from 0.0 to
2 0.90meter for pipe dia <=150 mm. 2261.6 No
119 Constructing Slab Type M.H. Chamber Of The
Following Size Including Excavation, Refilling, Brick
Bats Cement Concrete (1:5:10) of thickness 15 C.M.,
CC Channel (1:2:4) of thickness 10 C.M., finished
mm thick cement plaster inside & outside (Only for
shaft) In Cm 1:3, Finishing With Cement Slurry, P/F
Mm Dia M.S.Steel Hdpe Coated Steps 35 Cm C/C At
35 Cm Staggered Masonary In Cm 1:5, Rcc Slab In
Cc1:1.5:3 of thickness 15 C.M.,Including Cantering &
Reinforcement (Single jalli at 15 C.M. c/c bothway
mm dia.)But Excluding The Cost Of Manhole Seat
Cover Etc..Completed Of Size 0.75 X 1.00 Meter
(Inside Clear, M.H. length should be parallel to the
1.00 to 2.00 meter depth, (Slab at Ground level) (for
2 pipe dia <=230 mm) 5651.78 No
Repairing damaged M.H. and rasing M.H. up to road
level incl. removing damaged brick work and repairing
by brick masonry in C.M. 1:5 and plaster in C.M. 1:3
and fixing C.I. steps and existing MH sheet cover,
removing the debris from MH and carting the same
120 as directed.
(A) up to 0.15 mt. (@ Two Coarse)
(B) up to 0.35mt. (@ Four Coarse)
Chairs:-Supply and Fixing of Fillowing Item of
Auditorium seating Fabricate Auditorium seating with
Synchronized Tip Up Chair Urethane foam for seat and
back made my DOW chemical with High Pressure
moulding technology to achieve long life performance,
upholstered with stitched 3 Layer 100% Yarn Dyed
fabric Upholsteries. Chair profile with the seat in
121 Normal position and without a tablet arm should not be
more than 75 cm. Tip Up Chair should which is Dia
mm Barrel MS Rivets.The CRCA compliance to IS
513.The Seat Size should be 42 cm x 48 cm the Back
height should be 70 cm with ergonomically designed
seat and back cushions. Chair should be of existing
available Size.(Including Welding,Fitting and
Transportation)
a 225.00 Good Quality Washable Dubback chairs cloths of any 350.00 Smt
b 100.00 Mould of Seat & back (50 mm Seat & 75 mm Back) 1600.00 Set
c 100.00 Fibre Seat & back (21 X 21 inch Seat & 28 X 21 inch 1600.00 Set
d 680.00 Top of handle With Cup Holder fibre handle 360.00 No.
e 300.00 labour Work Fitting Spring and Repairing Seat 450.00 Set
Micanisium Road for Tie Up Chair
f 200.00 labour Work Repairing Side fitting Clamp including if 400.00 Set
Require Necessary Welding For Chair Support
122 50.00 Supply and Fixing of Auditorium seating Fabricate
Auditorium seating with Synchronized Push back Chair
with Ergonomically designed Poly Urethane foam for
seat and back made my DOW chemical with High
Pressure moulding technology to achieve long life
performance, upholstered with stitched 3 Layer 100%
Yarn Dyed fabric Upholsteries. Chair profile with the
seat in Normal position and without a tablet arm should
not be more than 75 cm.Chair pushback mechanism
should consist of 2 nos. x DIA 50 mm ZYTEL Based
Rollers which is supported by AXIAL shaft of DIA
mm is Driven by radial movement of 4 set of Swing
Arms of size 25mm x 6 mm or Simillar thickness with
Orbital Riveted Solid Dia 8 mm Barrel MS Rivets. The
pushback movement is achieved by synchronised 9990.00 No.
movement of 04 links mounted on Two Number of
triangular Symmetrical housing of size 27 cm x 23 cm
duly Simillar embossed for extra strength by 1.2 cm
made up by 0.12 cm CRCA compliance to IS 513. The
entire mechanism should be made in India and should
have total weight 8.5 kg duly Powder Coated – NO
SPREAY PAINT Part should be used for the chair of
The Seat Size should be 42 cm x 48 cm Simillar the
Back height should be 70 cm Simillar with
ergonomically designed seat and back cushions,Chair
should be available in 20”, 21”, 22” and 23” to use
multiple seat size in one layout for matching variable
arch length Or Simillar Relaxable Size & Design
Valid/Applicable/Provide instead of All Detail
Dimention and All Over Size of Chair & (Including
Fitting and Transportation)
123 350 Applying one coats of Enamel Paint of approved brand
and manufacture on Road MH/CP. Rate including
thoroughly brushing the surface free from dust. Rate
Includes Rent for Chota hathi/Tempo for Material
Carting/shifting, Traffic Diversion & Necesary
Prection works on road etc. Comp. as per Instruction of
Engg. In Charge. 80 No
124 Applying priming coat Over Kerb Surface after and
650 including Preparing the Surface With Ready Mixed 19.46 Smt
Priming Paint Brushing red Lead.
125 Painting Two Coats on divider and footpath curb
surface / New Concrete Surface (Painting two coats
650 after filling the surface with synthetic enamel paint in 71.86 Smt
all shades on new plastered concrete surfaces)
126 Providing & laying average (25 to 30 mm thick )
machined/hand cut green Rough kota (river wash) of
approved quality, selected and sorted for uniform color
& texture, in floor, otta, landing, tread, riser, ramp, sill,
skirting, channel etc., in following sizes as per design
(normal pattern straight or staggered joint with square
or rectangular shaped stone) and drawings (with
grooves of 10mm wide or without grooves). Kota stone
is to be laid over cement mortar 1:4 bedding of average
20 to 30 mm thickness as per drawing with joints,
pointing and finishing and filling the grooves with CM
1:2 including curing and cleaning with wire brush to
remove excess cement on the sides of stone up to the
satisfaction of the Architect & Engineer-in-charge. The
rate shall also include necessary chamfer/ rounding the
edge as per requirement
(a) a) Upto 600 mm X 600 mm ( River Wash) from
460.00 600mm on words. 1422.00 Smt
127 250 P/A Tremix with dewartering machine and floater
machine on constructed CC work for finishing the
surface as per requirement. The rate including all
machinaries, labor, loading, unloading, transportaion
etc complete as per direction given by engineer in
128 250 Providing,Cutting,bending and fixing in any size and
shape 2 mm thick FRP sheet shade including HILTI
SDST screw,washer,hardware fitting,silicon sealent
water proofing material etc.comp.as directed 1325 Smt
129 50 Providing & fixing steelDoor with shutter for Steel
Sheet 18 gauge, And Angel And 40X40X 3mm And
Steel Doors Frame Of Size 40X40X 5 Mm Incl.
Anodised Iron butt Hinges And Nece.Fitting And
Fastening With Necessary Screws.Rate Also Incl. Two
Coats Of Oil Paint Etc Comp. 2700 Smt
130 40 Providing corrugated G.I. sheet of class-3 roofing fixed
with glavanished iron J or L Hooks, Bolts and nuts
8mm diameter with bitumen and G.I. limpet washer or
G.I. limpet washer. filled with white lead complete
excluding the cost of purlins, Rafters and Trusses.(1)
0.80 mm thick sheet. 719.93 Smt
131 30 P/M/F chainlink jali 8’ x4’ size asper details sketch &
instruction ofengineer in charge same asLaldarwaja
garden pattern consistingof 3’ dia. M.S. black pipe ‘A’
class 5’4" ht. fixed at 8’9” c/c in CC 1:2:4 block of
9”x9”x9” size chainling jali of size 2” x 2” x
gaugefixed in 35x35x 5 mm MS angleframe 8’x4’ size
with MS flat of size 25x3 mm welded with jali
etc.comp. The jali is to be welded to MS pipe with MS
flat asinstruction given.The MS pipe andthe MS angle
frame are to be painted one coat of primer and twocoats
of paint as directed inline and level. 1230 Rmt
132 400 Renovation and Repairing work in Chainlink fencing
any size and also refixing work incl. febrication work
with all materails to be painted one coat of primer and
twocoats of paint as directed inline and level. 735 Rmt
133 10 Providing and fixing 1.20 Metre high fencing with2.0M
etrelong M.S.Angle posts 40mmx40mmx6mm and
oilpainting 3coats fixedat2.5Mt,C/c.with five
Horizontanlines and two diagonals of galvanised steel
barbed wirew eighting 9.38Kg.per 100Metre, strained
and fixed to posts with G.I,staples including fixing the
postsin round with 0.5x0.5.x 0.5.block in CC 1:5:10
etc. complete. 385.4 Rmt
134 100 Providing and fixing Roller Blind curtain fixed on
window level on wooden batten and curtain lift with
cotton thin rope,make of arolax or equivelent design
and colour as per instruction by engineer in Charge
with necessary hardware fitting, material and labour etc
complete. 2450 smt
135 Box type metal letters forming composite box made
from 1mm thick stainless steel plate of grade
having brush finish of following font size to be fixed at
Main Gate in english and or Gujrati and including
fixing charges approved before fixing by clent /
(a) 2 400mm high 1000 No
(b) 2 300 mm high 750 No
(c.) 2 230 mm high 565 No
136 4980 Applying two coats of Roof Coat water based Exterior
Paint of approved brand and manufacture on Exi. Road
Surface with proper line Rate including thoroughly
brushing the surface free from dust. Rate Includes Rent
for Chota hathi/Tempo for Material Carting/shifting,
Traffic Diversion & Necesary Prection works on road
etc. Comp. as per Instruction of Engg. In Charge. 230 Smt
137 15 Providing & Fixing Door hinge spring include with
necessary all fixtures as dircted by engg.in charge
etc.comp. 1175 Smt
138 20 Labour charges for removing of Alum. Door
/partition/Alum. Window/MS Grill etc. 110 Smt
139 4 P/F 10 mm thick Novapan sheet of approved quality
including fixing on partition with necessary all fixtures
as directed by engg.in charge etc.comp 1400 smt
140 2 Providing & Fixing Floor Spring including fixing
shutter etc. complete as per inst. of engineer in charge. 3300 No
141 1 Providing & Fixing in position Fully Panelled /
Partly Panelled Partly Glazed / Fully Glazed
Alluminium doors with frame using approved
quality anodised extruded alluminium 4583 Sq.M.
section as approved by Engg. In charge.(Jindal
alluminium )(a) Frame sections 101.6x44.45 mm
b) Shutter vertical & top section
© Shutter bottom section at 114.3 x44.45mm at (
1.37 kg/mt ) Shutter middle section at
100x44.3 wt. (1.37 kg/mt ) incl. providing &
installing 5 mm thick Glass of standaed
quality fixed / 12 mm thick Laminated sheet
with glazing chips (wt. 0.13 kg/ Rmt) in
panels etc. comp. as per Detail Given &
direction of engg.in charge.
142 1 Providing & Fixing in position Alluminium
window 2/3/4 track sliding/fix type with frame
using approved anodised extruded
alluminium section as approved by Engg.In
charge. (Jindal alluminium) units equivalent.
including P/F installing 5 mm thick clear/tinted
Glass of standard quality etc.comp. 4518 Smt
143 2000 Providing and fixing Aluminum Composite Panel
signages of various size and in any language. The
mm thick Aluminum composite panel shall be cladded
with retro reflective high intensity grade radium sheets.
The signages shall be of any language 7 Sq.Inch
144 4 Providing & Fixing Alluminium Composite Panel of
approved make of 4 mm thick Exterior Grade PVDF
with coil thickness 0.25 mm & Frame work made out
from Alluminium anodised section of size 50x25 mm
having weight of 2.6 kg. for 15'-0 supported on
Masonary/ R.C.C. with the help of MS bracket fixed
with Brick Fastener / Anchor Fastener & Groove Filled
with 789 weather fillent of Dowl corning corporation
make. (Apr. Rate) 3500 Smt
145 10 Providing & Fixing Stainless steel 304 grade 50mm
outer dia meter 14 guage Railing with 2 nos horizontal
& 1.20 mt. clear vertical pipe 1 mt. c/c with buffing SS
pipe. including cutting, bending fixing in position and
Fixing SS Article cap in bottom of pipe. Rate also
includes Fixing pipe in bottom with flling material of
bombay masala etc. Complete as per the instruction of
engg. in charge 5200 Rmt
146 10 Providing and fixing eco friendly light weight calcium
silicate false ceiling tiles having Tegular edge & 15mm
Thick Densified edges on the Tile Periphery for Extra
Strength The Light weight calcium silicate ceiling tiles
shall have, light reflection 85% non-combustible as per
B.S. 476 part IV, 100% humidi ty resistance and also
having thermal conductivity 0.043° w/mKC. for the
best thermalInsulation. The Light weight calcium
Silicate tile shall be of approved texture Finefissured
/Spintone/ Cosmoshaving NRC value of 0.5 & Globe
having NRC value of 0.75 NR Core quivalent of size
595 X 595 mm to be laid on true horizontal level
suspended interlocking metal grid of hot dipped
galvanized steel sections (galvanizing @ 120 grams per
sq m including both side) consisting of main‘ T’ runner
suitably space dat joint stoget required length and size
of 24X38 mmm ade from 0.30 mm thick (minimum)
sheet, 1200 mm centret ocentre ,andcross ‘T’ of size
24X28 mm made out of 0.33mm (Minimum) sheets
paced 1200 mm along spaced between main ‘T’ at
mm centre to centre to form agrid 1632.63 Smt
147 5 Uncoursed Rubble masonary with hard stone of
approved Quality in foundations and plinth in cement
mortar 1:5 (1 cement: 5 coarse sand including levelling
up etc.complete 2517.13 Cmt
148 5 Extra over item above for super structure above plinth
level up to floor two level 363 Cmt
149 100 Suplying of 65x65x2.5 mm thk Galvanise Chainlink
Jali For existing frame & fixing jali on Comp. wall Etc.
Complete as per the instruction of engg. in charge 490 Smt
150 20 Suplying of 20x20x2mm thickness MS jali For existing
frame & fixing jali on Comp. wall Etc. Complete as per
the instruction of engg. in charge
151 Labour work for fixing any kind of paving with cement
pointing in CM 1:2, including watering, ramming etc
a) 200 I) Laying on Sand bedding as per requirement to fix the
C.C.Block / Nibhada Stone in Line & Level 69.64 Smt
152 4 Filling 3mm Exi. Swimming pool tiles groove with
white cement, Dr. Fixit super latex 302 SBR solution,
& water and cleaning surface after application of
mortar. Rate also includes making the surface smooth
and clean after complete the work. all works done as
per Instruction of engg. In charge. 69 Smt
153 1 Fixing Johnson Endura swimming pool tiles of size
12.2 x 24.70 cm and fixing tiles in Ardex durafix gold
star high bond water resistance chemical mortar with
3mm groove. and labour work for Fixing tiles with
3mm specers and filling joints with white cement and
Dr. Fixit super latex 302 SBR rate includes desmatling
old pool tiles & plaster. Rate also includes removing/
fixing damage scattered tiles in pool area. all works
done as per Instruction of engg. in Charge. 2640 Smt
153- 250 Supplying Ordinary Portland Cement (OPC) (Grade-
A 53) Bags (50 Kg.) in road Store as per Inst of Ebgg
incharge 380 No
153- 40 Supplying Fine Aggregate Sand in road Store as per
B Inst of Ebgg incharge
154 3 Supplying and installation of 10mm thick recycled
rubber flooring havinganti-skid and sound absorbing
properties, square shaped, with different color optns for
create flooring pattern, should be installed with proper
adhesive as per manufactures's guidelines, joints of
surface to be done properly to prevent dirt &
watepenetration inside the surface. etc complete as per
instruction of engineer in charge 1234 Smt
155 3 Providing and applying vinyl paint at approved quality,
including fixing laminate on surface, as per
manufacture's specification, finish etc complete as per
instruction of engineer in charge
Seal and Signature of the Bidder Add.City Engineer
Date: (West Zone)
Tender Fee Rs.2,400.00
Earnest Money Rs.98,245/-
Contractor’s Name & Address :
MEMORANDUM OF WORK IN BRIEF
"Maintenance,Renovation & Civil Work at Different
Municipal Building,Garden ,Municipal School and other
1. Name of Work Require Differant Places in Paldi Ward at West
Zone.(A.R.C. TENDER)"
Rs.98,24,529.15 (exclusive of GST). GST will be paid extra by
2. Tender Estimated Cost
AMC/Authority at prevailing rate to the contractor.
1% of the Tender Cost in the form (Rs.98245 /-)
3. Earnest Money
(D.D./Pay Order / Local Micr Check/B.G.)
4 Tender Fee Rs Demand Draft of Rs..2,400.00
6. Time-Limit 12 months
7. Validity Period 120 Days
8 Eligibility Criteria Register “D” class in PWD in Govt. R&B/CPWD/AMC or equivalent
registration with any other state Govt. or institutions.
(i) Last Date of Submission of the
a) In Sealed cover in duplicate copies by Registered Post
(ii) Mode of Sending
A.D, or by Courier.or hand delivery
b) Tender sent by ordinary post will be rejected out right.
(iii) Description essential to be a) Name of work, Tender Notice No. & Tender No.
made on sealed cover b) Date of receiving tender by Corporations.
(iv) Mode of quoting rates in The Price bid shall be submitted online only.
Schedule of Quantities and Rates It shall not be submitted Physically.
Date and Place of Tender Document
11 Date of Opening Submission of EMD. Tender fee and other Documents during
office hours: On Dt.07-03-2026 &12:00pm West Zone, 2nd
Floor, A.M. Office, Dr. Ramanbhai Patel Bhavan,
Usmanpura.Ahmedabad Municipal Corporation, W.Z. Office,
Ahmedabad-380013.
(1) Rs.1000/- per day (for tenders amounting upto 10 Lakhs), (2)
Rs.2500 per day (for tenders amounting above 10 Lakhs and upto
12 Penalty Due to Delay of Lakhs), (3) Rs.5000 per day (for all tenders amounting
work above 30 Lakhs) but not more then 10% of bill
13 Terms, Condition, & All general condition of contract of Form B1 condition of
Specification contract shall be applicable..
The staff of the contractor shall wear safety jackets, hoes, helmets etc.
while on duty and any violation will attract fine of Rs.5,000/- for each
incident.Failure to erect safety signage or trying to carry out he works
14 Safety without proper precautions/safety measures as equired will attract a fine
of Rs. 5,000/- for each incident.
15 Defect &Liability Period The contractor shall be responsible to make good and remedy at his own
expense any defect which may develop or may be noticed before the
period mentioned hereunder from the certified date of completion, The
within 15 days of receipt of the notice. In the case of failure on the part
of the contractor, the Engineer-in-charge may rectify or remove or re-
execute the work at the risk & cost of the contractor. The Engineer-in-
charge shall be entitled to appropriate the whole or any part of the
amount of security deposit towards the expenses, if any, Incurred by him
in rectification, removal or re-execution. The Defects Liability period
shall be as under(a) for all works costing upto Rs. 50,000 ( amount put to
tender), the period shall be 3 months from the certified date of
(b) for all works costing more than Rs. 50,000 and upto Rs. 1 crore
(amount put tender), the period shall be 6 months from the certified date
of completion or one monsoon, whichever is later.
(c) for major projects costing more than Rs. 1 crore, the period shall be
12 months from the certified date of completion which should include
(d) For building works, the period specified in (a), (b) or (c) above OR
elapse of monsoon period following the certified date of completion,
whichever is later. For the purpose of deciding the monsoon period, the
30th September may be treated as the last date.
16 Time permitted to start parts of work Whenever a work is allotted by Engineering staff, whether minor or
major of part thereof of any amount, the contractor shall be bound to
start the works within 48 hours of intimation of work. Communication
done telephonically via SMS, Via Whatsapp and through letter / E-mail
shall be considered legal and binding for the same. Failure of comply to
start the works in 48 hours of intimation as above by contractor the
contractor shall be levied penalty of (1) Rs.1000/- per day (for tenders
amounting upto 10 Lakhs), (2) Rs.2500 per day (for tenders amounting
above 10 Lakhs and upto 30 Lakhs), (3) Rs.5000 per day (for all
tenders amounting above 30 Lakhs). Three times failures by contractor
shall make contractor responsible to be black listed unless and
otherwise justified properly in writing / binding within 15 days of last
notice of penalty.
17 Compensation for Delay 10% of Remaining work (As per Circular)
18 Addendum/Corrigendum Addendum/Corrigendum If any Shall be Published 48 Hrs. Price To the
Final Submission Time And Date. The Same Shall From a part Of
Tender And The Same As to be Attached Along With The Tender
19 EPF Act As per Acoount Department circular no-37 Date:09/08/2018
20 GST GST will be paid extra by AMC/Authority at prevailing rate to the
Contractor's Sign Add.C.E.(west zone)
AMC Finance dept. circular No – 41, Dt.08/02/2022
(A) Guarantees issued by following banks will be accepted as SD/EMD on permanent basis.
(1) All Nationalized Banks
(B) Guarantees issued by following banks will be accepted as SD/EMD for the period up to March-
2022. The validity cut-off date in the GR is with respect to the date of issue of Bank Guarantee
irrespective of the date of termination of Bank Guarantee. Guarantees issued or Authorized by
Ahmedabad Branch Only.
(1) Commercial Banks:
(3) ICICI Bank.
(5) Kotak Mahindra Bank
(6) IndudInd bank
(8) Tamilnadu Mercantile Bank
(9) Ujjivan Small Finance bank
(10) A U Small Finance Bank
(11) Fedaral Bank Bank
(12) Equitas Small Finance bank
(13) Bandhan Bank
(14) Standard Chartered Bank
(2) Co-Operative & Rural Banks of Gujarat
1. The Mehsana Urban Co-operative Bank Ltd
2. The Ahmedabad Mercantile Co-Operative Bank Ltd
3. Nutan nagrik Sahakari Bank Ltd
4. The Kalupur Commerical Co-operative Bank Ltd
5. Rajkot Nagarik Sahakari Bank Limited
6. The Gujarat State Co-Operative Bank
7. Sarswat Bank
8. Saurashtra Gramin Bank
Seal and Signature of the Bidder Addl City Engineer
TERMS & CONDITIONS
( A ) INSTRUCTIONS TO BIDDERS (ITB)
( B ) GENERAL TERMS & CONDITIONS
( C ) FINACIAL TERMS & CONDITIONS
( D ) MAIN CONDITION / FETURES OF THE WORK
AHMEDABAD MUNICIPAL CORPORATION
TERMS & CONDITION
( A ) INSTRUCTIONS TO BIDDERS (ITB)
1. Procedure for Submission of Tender
a). The Bidder should quote the price bid in tender form before schedule time Tender Document, tender
fee & EMD (Draft /DD) and all other enclosures as asked in tender.
b).The bidder shall submit the following Tender documents physically in hard copy in two separate
envelope (marked as “original” and other marked as “Duplicate”) in schedule time by RPAD/ Speed
Post/ Hand Delivery in duplicate. The Bid envelopes shall be marked as follows:-
Tender Document
Registration certificate of class
c).The envelope shall be addressed to the Employer at the following address:
Asst. Manager (Admin) West Zone,
2nd Floor,Dr. Ramanbhai Patel Bhavan,
Usmanpura, Ahmedabad Municipal Corporation,
W.Z. Office, Ahmedabad-380013
d).Bear the following identification:
“TO BE OPENED ONLY IN PRESENCE OF THE EVALUATION COMMITTEE”
e). Indicate the name and address of the bidder.
If the outer envelope is not sealed and marked as above, the Employer will assume no responsibility
for the misplacement or premature opening of the bid.
f).All information has to be typed or hand written legibly. All pages of the Bid have to be initialed by
g) All The Bid Document Essentially Needs to be Properly binded/steppled
2. Assessment of Submission
2.1 The Employer will open the technical bid of physically submitted document of all the bids received
for the package (except those received late) containing the sealed Tender volume and other
enclosures then announce the names of bidders in the presence of bidders or their representatives
who choose to attend on the date and time mentioned in the NIT In the event of specified date of bid
opening being declared as a holiday for the Employer, the Tender will be opened at the appointed
time and location on the next working day.
2.2 In Physical submission, Bidders detailed and tender fee, E.M.D. shall be opened first. The Employer
at the opening will announce bidder’s names, , the presence/or absence of EMD, the amount and
validity of EMD furnished with each bid, is valid registration and such other details, as the
Employer may consider appropriate.
2.3 The Employer will determine whether the bid is accompanied by the required EMD.
2.4 If the EMD furnished does not conform to the amount and validity period as specified in the
Invitation for Bid and has not been furnished in the form, the bid shall be rejected by the Employer
as non-responsive and the Tender volume will be returned to the bidder.
2.5 Subject to confirmation of the EMD by the issuing bank, the Tender volume accompanied with
valid EMD will be taken up for further evaluation. In case, the Bank does not confirm the EMD, the
bid shall be rejected as non-responsive and no further evaluation carried out.
2.6 The tender volume will further be examined to determine whether the bid has been properly signed,
meets the eligibility and qualification criteria, has the required available bid capacity, is
accompanied by the requisite certificates, undertaking and other relevant information specified in
the bid documents and is substantially responsive to the requirement of the bidding documents and
provides any clarification for ascertaining the correctness of the information/details.
2.7 If the Tender volume is not substantially responsive, it will be rejected by the Employer and will not
subsequently be made responsive by correction or modification or withdrawal of the nonconforming
deviation or reservation.
3. Evaluation and Comparison of Tender volume
The Employer will evaluate and compare only those Tender volumes which are determined to be
substantially responsive in accordance with Clause 2 and qualified for award of Contract in
accordance with Clause 5 (General Terms and Condition).
4. Procedure for Tender Opening
Received copies of tender in physical form with in schedule time, will be open on schedule date and
time. In the event of specified date of bid opening being declared bidders who qualify the criteria
then bidder bid will be considered for opening of price bid.
5.1 The Employer will award the Contract to the bidder whose bid has been determined to be
substantially responsive to the bidding documents and who has offered the lowest Evaluated Bid
Price, provided that such bidder has been determined to be (i) eligible in accordance with the
provisions of Clause 3(General Terms and Condition); and (ii) qualified in accordance with the
provisions of Clause 5(General Terms and Condition).
6. Notification of Award
6.1 Prior to expiration of the period of bid validity prescribed by the Employer, the Employer will
notify the successful bidder by cable/fax and confirmed by registered letter that his bid has been
accepted. This letter shall name the sum which the Employer will pay the Contractor in
consideration of the execution, completion and maintenance of the Works by the Contractor as
prescribed by the Contract.
6.2 The notification of award will constitute the formation of the Contract.
7. A successful Bidder has to deposit security deposit / Bank Guarantee as per Circular after receiving
letter of Indent. Time limit of work will commence from the date of issue of work order.
8. Clarification of Bids
8.1 To assist in the examination, evaluation and comparison of bids, the Employer may, at his
discretion, ask any bidder for authentication the correctness of the information/details furnished by
him in his bid. Such request by the Employer and the response by bidder shall be in writing or by
8.2 Subject to above clause, no bidders shall contact the Employer on any matter relating to his bid from
the time of bid opening to the time contract is awarded.
8.3 Any effort by the bidder to influence the Employer in the Employer’s bid evaluation, bid
comparison or contract award decisions may result in the rejection of his bid.
9.1 Information relating to the examination, clarification, evaluation and comparison of bids and
recommendations for the award of a contract shall not be disclosed to bidders or any other persons
not officially concerned with such process until the award to the successful bidder has been
announced. Any effort by a bidder to influence the Employer's processing of bids or award
decisions may result in the rejection of his bid.
10.1 The bidder is advised to visit and examine the Site of Works and its surroundings and obtain for
itself on its own responsibility all information that may be necessary for preparing the bid and
entering into a contract for construction of the Works. The costs of visiting the Site shall be at the
bidder’s own expense.
10.2 The bidder and any of its personnel or agents will be granted permission by the Employer to enter
its premises and lands for the purpose of such inspection, but only upon the express condition that
the bidder, its personnel and agents, will release and indemnify the Employer and its personnel and
agents from and against all liability in respect thereof and will be responsible for death or personal
injury, loss of or damage to property and any other loss, damage, costs and expenses incurred as a
result of the inspection.
11.0 Cheklist for submition of Technical Bid.
11.2 valid Registration Copy.
11.3 Valid E.M.D
AHMEDABAD MUNICIPAL CORPORATION
TERMS & CONDITION
( B ) GENERAL TERMS & CONDITIONS
1. Scope of Bid
1.1 The Ahmedabad Municipal Corporation hereinafter called "the Employer" invites Tender document
for the construction of works (as defined in these documents, hereinafter referred to as "the Works")
detailed in the table given in the IFB.
1.2 The Works consist of: “as Above "
Source of Funds
1.1 The expenditure on these Works will be met by AHMEDABAD MUNICIPAL
3. Eligible Bidders
3.1 This invitation for bids is open to bidders who has necessary bid capacity and who meet the
following requirements:
A bidder shall not be under a declaration of ineligibility for corrupt or fraudulent practice.
The bidders shall have a registration with State PWD, and/or CPWD for "E1" class and or
equivalent. If contractor is not registered with AMC in the relevant class, on award of contract
he shall be required to register himself with AMC within 3 month's time.
Bidders shall provide such evidence of their continued eligibility satisfactory to the Employer, as the
Employer shall reasonably request.Subject to Submition of Succsesful Submition as per Clause –II of
4. Eligible Material, Equipment and Services
4.1 At the Employer's request, the bidder having offered the lowest evaluated financial bid may be
required to provide evidence of the origin of materials, equipment, and services to the satisfaction of the
4.2 For purposes of Sub Clause 4.1, "origin" means the place where the materials are mined, grown,
produced or manufactured; similarly for equipments and from where the services are provided.
5. Qualification of the Bidder
To be qualified for award of Contract, bidders shall:
a) Submit a written power of attorney authorizing the signatory of the bid to commit the bidder; and
AHMEDABAD MUNICIPAL CORPORATION
T he w or k s h a l l b e c omp l et e d wi t h 1 2 M o n th s aft er t he or der t o sta r t t he w or ks .
T he d et a i ls of r ei nf or c em e nt o f R. C. C . w or k s ha ll be a s p er de si gn a n d i ns tr uc t i ons of Ci t y
E ngi n e er /A d d l . C it y E n g in e er a n d hi s or d er wi l l be c on si d er e d f i nal .
T he c on t rac t or s ha l l ha ve t o m ai n ta i n a cc ou n t of s te el, ce m e nt a nd ot he r m at e r ia l s t hat ma y be
br ou gh t b y h i m on s i te. T h i s acc o u n t s ha l l be r e gu l arl y m a i n ta i ne d a nd ke pt ope n f or i ns pe c ti on b y
M u n ic i pa l St a ff. Wa t eri n g of all t h e i t e m s s ha l l b e a s per i n s tr uc ti ons . M i xi n g of c oncr et e s ha l l be
don e b y c on cr et e m i xer mac h i ne. Arra n g e me nt s of b i n di n g vi br a t or f or R. C. C. w or ks i f re q ui r e d
T he c on t r ac t o r s hal l be r e m ai n re s p on s i bl e f or W or km e n ’ s c omp e nsa t i on i f a n y w he n s uc h cas e
oc c ur s. T h e c on tr act or s ha ll a r ra n ge f or me d a mpe rs a n d i n n i gh t a nd he s ha ll be r e s p ons i bl e f or an y
da m a ge of l if e a n d li m b or pr op e rt y i f a n y h a p p en, d ur i n g t he e xec ut i on of w or k. I n ca se of di s put e
f or u n s e e n or ove rl o o k e d i te m s t he dec i si on of th e c i t y E n gi n ee r / A dd l. Ci t y E ngi neer s ha ll be f ina l.
T he c on tr act or s h al l h a v e t o gi ve s i te c le a n o f a ll r u b bi sh on c om pl e ti on of w or k a nd ha ve over th e
bui l di n g w it h fi n a l f i ni s hi n g of t h e w or k a s di r ect e d . Al l t h e r e j e cte d ma t eri al s s ha l l be r e m ove d
f rom s it e w i t h i n 2 4 h ou r s b y c o n t ra ct or at t hi s r i s k a n d c os t .
For m i xi n g mor tar e i t he r f or m a s on r y or f o r p la s t er or f o r a n y ot her pur p ose c ont rac t or s ha l l ha v e t o
pr e p ar e t h r o u gh of b i g g e r si z e a n d m i x t he mor t ar i n t he r e q u ir e d pr op or ti on. In on ca s e he s ha l l be
all ow e d t o m i x t h e m or t ar ei t her on fl o o r or a n y f i ni s he d s urf ace s .
pa y t he wa t e r c har ge s as p e r w a ter me t er.
If a n y e x t ra i t e m cr op s u p d ur i n g t he pr o gr e s s of w or k t h e sa m e s ha ll be c ar r i e d out b y t he
c on tr a c t or a n d h e s ha l l b e pa i d at t he ra t e f i xe d b y C .E . /A dd l. C i t y E ngi nee r a s pe r t he ra t e
an al ys i s b as e d on c u rre n t mar ke t r a t e s .
If i n t h e i n ter e s t of t he C or p or at i on it i s n e ce s sa r y t o c ha n ge e i t her a n y si te or t he de si gn of t h e
pr op os e w or k t he c on tr a ct or s ha l l car r y ou t t h e sa m e a t h is q u ot e d r a t e s wi t hout c har ge s a n y e xt r a
an d t h e c on t r a c t or w il l ha ve t o c arr y ou t t he w o r ks a n d he w i l l b e pa i d at t he r at e q uot e d b y hi m a n d
T he c u b ic al c on t e nt s of th e c e me n t ba g s ha l l be t a ke n a s 1- 2 0 c f t. Pe r ba g a n d t h e c ontr a c t or s s ha l l
ha ve t o p r e par e t h e me a s ur e s b ox e s ac c or d i n g t o t h i s m ea s ur e.
T he R. C. C. or s pe c i fi e d w or k s hal l n ot be d o n e on S u n d a y a n d hol i d a y e x c e pt i ng e me r ge n c y or
w he n tec hn i c al r e q ui r e me n t s a re s uc h t h at c on t in u i t y of wor k s h oul d b e ma i nta i ne d a nd t ha t t o w i ll
be w i t h pri or per mi s si on of t he c om p e te n t a u t h or it y.
Re te n ti on m on e y a t t h e r ate of 2 % s hal l b e de d uc te d f r om e ve r y r u nni n g bi l l of t he c on t ra c t or an d
w hic h w i ll be pa i d a t t h e ti m e of fi na l bi ll .
C on t r ac t o r wi ll be f u ll y r e s p on s i bl e f or c om p l i a n ce of t h e var i ous p re vi si on un der c ont r act Ac t .
19 7 0 a n d t h e R ule s fr a m ed f or t o u n d er .
T he te n der f or t h e w or k s h al l re m a i n op e n f or a per i od ( 1 2 0) da ys f r om the d a te of ope ni ng of th e
te n der s f or t hi s w or k a n d t he te n de r er s hal l n ot be al l ow e d t o wi t hdr a w on m odi f y t he off e r on hi s
ow n d ur i n g t h e pe ri od . If a n y t e n de re r wi t h dra w or ma ke s a n y m od i f i c at i ons ( s) or a ddi ti on ( s) i n
th e ter m s a n d c on d i t i on s of h i s t e n de r n ot a c ce pt a bl e t o t he M u nici pa l C or por a t i on , t he M un ic ipa l
C or p or a t i on s h a l l wi t h o ut p re ju d i ce t o a n y r i gh t o r r e m e d y b e at l i ber t y t o f or f e i t i n f ull t h e s a i d
ear ne s t m on e y a b s ol u t el y.
As p e r Cir c u la r No. M C R 2 1 7 6 (9 6 ) 2 4 1 8 ( ii ) G HH da te d 3 1- 0 3- 7 7 i ss u ed b y G o ve rn m e nt of G uj ar a t
c on tr a c t ors ar e re q u e s t ed t o pr od u c e t he i r q u ar r y m at e r ia l s f or c on s tr uct i on w or k t hr ou gh l e ga l
s our c e s. i .e. on l y f or m th e q ua rr y l ea s e h ol d e r s, per mit h ol d er or m i d dl e ma n w h o s a ti s fi e s t he
c on tr a c t or as t o t he le ga l i t y of t h e s our c e of p ur ch as e b y h i m on t he se m at er ia ls .
If t he wor k i s n ot c ar ri ed ou t wi t hi n t h e s p ec i f i e d t i me l i mi t p e na lt y w il l be c har ge d a p pli c a bl e a s
per A M C R ul e s .
ii) Al l t e n de rs ar e t o be su b mi tt e d i n d u pl i c ate wi t h ou t w hi c h t he t e nd ers a re l i a bl e t o be
iii ) I n c a se of t e n der d ow n l oa d e d fr om we b si t e, te n de r f ee & E M D s h oul d be s ub mit te d i n f or m
i v) C on d i t i on of f or m B 1 St an da r d S pec if ic a ti o n of ma te ri a l & c o de of pr a c tic e w il l be
a pp l i c abl e. F or m B 1 & B 2 c a n b e i s a v a i l a ble i n we b s i t e. C ond it io n of F or m B- 1 F o r
Def ect l i abil it y C l a u s e is n o t a p p l i c a b l e F or t hi s W o r k.
t hi s W o r k & A s P e r i ns t r uc t i o n o f E n g g .i nc h a g e & a ls o Ge ne r a l T ec h ni c a l S p ec i f i c a t i ons f or
B ui l d i n g Works b ook a va i l a b l e from Gu j a r a t Book Stores (Pvt.) Ltd. Sector-
21,Gandhinagar,DE T A I L E D G E NE R A L T E C H N I C A L SP E C I F I C A T I O N S ca n be a vai l a bl e f r om
A h me da b a d M u n ic i pal C or p or a ti on w e bs it e “ ww w .e g o va m c. c om ” .
C o nt r ac t or’ s S i gn at ur e Ad d. Ci t y E ngi nee r
( W e st Zon e)
General information
All individual firms must complete the information in this form. Nationality information shall be
provided for all owner(s) or applicant(s) that are partnership or individually owned firms.
1 Name of firm:
2 Head office address With Contact no.:
3 Local office address (if any) With Contact no.:
4 Telephone/ Contact With name :
5 E-mail address:
6 Place of incorporation/registration:
7 Year of incorporation/registration:
Additional information regarding litigation, debarment, arbitration, etc.
Authorised Signeture Bidder
5.3 Disqualification
Even though the Bidders may meet the above criteria, they are subject to be disqualified for any of the
following reasons:
a) Misleading or false representation in the forms, statements and attachments submitted and included
b) Record of poor performance such as abandoning the work, rescinding of contract for which the
reasons are attributable to the non-performance of the contractor, consistent history of litigation
awarded against the applicant or financial failure due to bankruptcy.
c) Has been identified by the Employer as poor performer in implementation of ongoing AMC works.
d) The bidder fill (tender) in percentage rate above or below and total amount (both in figures and
d) The bidder fill (tender) in percentage rate above or below and total amount (both in figures and
words) only in E-Tender (Online) Not to fill in hard copy of Tender documents
5.4 Debarment/Black listing
Notwithstanding the above, the Employer may debar or blacklist any of the bidder(s) for their
misleading or false representations in the forms statements etc. for the period to be decided by the
6. One Bid per Bidder
6.1 Each bidder shall submit only one bid per contract package either by himself or as a partner in a
joint venture. A bidder who submits or participates in more than one bid for a contract package will be
7. Bidding Documents
The bidder is expected to examine carefully the contents of all the above bid documents. Failures to
comply with the requirements of bid documents will be at the bidder's own risk. Pursuant to Clause
bids which are not substantially responsive to the requirements of the bidding documents will be
8. Language of Bid
The bid, and all correspondence and documents related to the bid exchanged between the bidder and the
Employer shall be written in the English language. Supporting documents and printed literature
furnished by the bidder may be in another language provided they are accompanied by an accurate
translation of the relevant passages in the English language, in which case, for purposes of
interpretation of the bid, the English translation shall prevail.
9.1. Unless stated otherwise in the bidding documents, the Contract shall be for the whole works as
described in bidding documents, based on the percentage rate amount in the Bill of Quantities
submitted online by the bidder.
9.2. The bidder shall fill (tender) in percentage rate above or below and total amount (both in figures
9.2. The bidder shall fill (tender) in percentage rate above or below and total amount (both in figures
and words) for overall items of the Works provided in the Bill of Quantities
10. Bid Validity
10.1 Bids shall remain valid as per Instruction to Bidders (ITB) after that deadline date for bid
submission specified in Clause. The Employer as non-responsive shall reject a bid valid for a
shorter period.
10.2 In exceptional circumstances, prior to expiry of the original bid validity period, the Employer may
request the bidders to extend the period of validity for a specified additional period. The request
and the responses thereto shall be made in writing or by fax. A bidder may refuse the request
without forfeiting his bidder agreeing to the request will not be required or permitted to modify his
bid but will be required to extend the validity of his Bid Security for the period of the extension,
and in compliance with Clause 2 ( Financial Terms & Conditions) in all respects.
11. Format and Signing of Bid
11.1 The bidder shall prepare two copies of the documents comprising the bid as described in
Instructions to Bidders.
11.2 The bid shall be typed or written in indelible ink and shall be signed by a person or persons duly
authorized to sign on behalf of the bidder.
11.3 The bid shall contain no alterations, omissions or additions, except those to comply with
instructions issued by the Employer, or as necessary to correct errors made by the bidder, in
which case the person or persons signing the bid shall initial all such corrections.
11.4 All witnesses and sureties shall be persons of status and probity and their full names,
Occupations and addresses shall be printed below their signatures.
12. Deadline for Submission of Bids
Bids must be received by the Employer at the address specified above not later than the time and date
specified in the NIT.
Any bid received by the Employer after the deadline for submission of bids will be returned unopened
14. Signing of Agreement
At the same time that the Employer notifies the successful bidder that his bid has been accepted, the
Employer will direct him to submit the Performance Security and attend the Employer's office on a date
determined by the Employer for signing the Form of Agreement.
15. The selection process will lay high emphasis on the ability and competency of contractors to do high
quality work within the given time schedule.
16. The onus of providing, all necessary company / project related information, in appropriate manner
and medium, so as to demonstrate the competency of the bidder and to allow proper evaluation, will rest
entirely on the Bidder.
17. All clause shall be operative from the date of issue of work order and up to the expiry of original
and extended time limit.
18. Legal Condition:-
Corrupt or Fraudulent Practices
The Employer will reject a proposal for award if he determines that the Bidder recommended for
award has engaged in corrupt or fraudulent practices in competing for the contract in question. The
Employer will declare the firm ineligible, either indefinitely or for a stated period of time, to be
awarded a contract by AHMEDABAD MUNICIPAL CORPORATION if it at any time determines
that the firm has engaged in corrupt or fraudulent practices in competing for the contract, or during
“corrupt practice” means behavior on the part of officials in the public or private sectors by
which they improperly and unlawfully enrich themselves and/or those close to them, or induce
others to do so, by misusing the position in which they are placed, and it includes the offering,
giving, receiving, or soliciting of anything of value to influence the action of any such official in
the procurement process or in contract execution; and
“fraudulent practice” means a misrepresentation of facts in order to influence a Procurement
process or the execution of a contract to the detriment of the Borrower, and includes collusive
practice among bidders (prior to or after bid submission) designed to establish bid prices at
artificial non-competitive levels and to deprive the Borrower of the benefits of free and open
Municipal Commissioner reserves the rights to reduce/increase the scope of work and contract
without assigning any reason thereof.
If Ahmedabad Municipal Corporation is convinced that the Bidder has resorted to material
misrepresentation or provided fraudulent information / statement, the said Bidder will be liable for
disqualification / rejection at any stage.
Proof for fulfillment of eligibility criteria should be submitted along with Tender volume. If the
Tender volume is submitted without valid documents and without proof of eligibility criteria it will
Those who do not meet with the eligibility criteria need not submit the Tender document.
Tenders, which do not fulfill all or any of condition or are submitted incomplete in any respect or
are conditional tenders, will be rejected.
Contractor shall be responsible to obey all Labour Laws, Environmental and Safety Laws.(the
existing laws as well as framed from time to time). Any penalties laid due to violation of such laws
shall be directly deducted from the contractor's outstanding.
19. Administrative Conditions:-
Safety and Signage
Contractor has to arrange for the complete safety of the persons working for project, users of the
road i.e. public and vehicles also. All the arrangements of traffic drums, metal / fiber cones, traffic
blinkers, traffic signs as per design, safety tapes etc. to be arranged at site. Necessary florescent
marking on traffic signs to be provided so that it should be visible at night. During night working
hours safety in charge personnel shall be provided with florescent jackets. This shall be Provided
at no extra cost by the bidder under attaché with specified in the tender documents under
Liaison with local authority for electrical connections for the AMC
The contractor is responsible for liaison with local authority for change in supply connection or new
connection on behalf of AMC. It includes filling the necessary application to power Supply
Company, follow up and getting the supply, filling the necessary test reports to the power supply
company. All official fees including security deposits and other expenses shall be of initially paid by
the contractor. AMC may support to get the temporary connection and may at its diseretien get
the same converted to permanent connection at the same of AMC if desired do,and contractor
shall as no extra cost support the same. In this case AMC my be as the remaining cost subject
20 :- CONTINGENT FEE:
The Contractor warrants that he has not employed any person to solicit or secure the contract
upon any agreement for a commission, percentage, brokerage or contingent fee. Breach of this
warranty shall give the Municipal Commissioner the right to cancel the contract or to take any
other measure as the Municipal Commissioner may deem fit. The warranty does not apply to
commissions payable by the contractor to establish commercial or selling agent for the purpose
of securing business.
No officer, employer of the Municipal Corporation be admitted to any share or part of this
contract or to any benefit that may rise there from.
21:- OVERPAYMENT AND UNDERPAYMENT:
Whenever any claim fourths payment of a sum to the Municipal Corporation arises out of or
under this Contract against the contractor the same may be deducted by the Municipal Corporation
from any sum then due or which at any time thereafter may become due to the contractor under
this contract and failing that under any other contract with the Municipal Corporation or from any
sum due to the contractor with the Municipal Corporation (which may be available with Municipal
Corporation), or from his retention money, or he shall pay the claim on demand. The Municipal
Corporation reserves the right to carry out post payment audit and technical examination of the
final bill including all supporting vouchers, abstracts, etc.
The Municipal Corporation further reserves the right to enforce recovery of any over payment
when detected not withstanding the fact that the amount of the final bill may be included by the
If as a result of such audit and technical examination any over payment is discovered in respect of
any work done by the Contractor or alleged to have been done by him under the contract, it shall
be recovered by the Municipal Corporation from the contractor by way of all the means prescribed
above or if any under payment is discovered by the Municipal Corporation, any amount due to the
contractor under this contract or under payment may be adjusted against any amount then due or
which may at any time thereafter become due before payment is made to the contractor from him
to the Municipal Corporation on any other contract account whatsoever.
If, at any time, there should be evidence of any lien or claim for which owner might have become
liable and which is chargeable to the contractor, the owner shall have the right to retain out of any
payment then due or thereafter to become due an amount sufficient to completely indemnify the
owner against such lien or claim or if such lien or claim be valid the owner may be or become due
and payable to the contractor. If any lien or claims remaining, unsettled after all payments are
made, the contractor shall refund or pay to the owner all money that the latter may be compelled to
pay in discharging such lien or claim including all cost and reasonable expenses.
Contractor shall not sub-let the work without permission of the authority.
Joint venture and subcontracting shall not be allowed under this tender
Addendum or corrigendum conveying any change or correction in respect of the work shall form the
part of the contract documents. The full consideration shall be given to such addendum or corrigendum
before submission of tender duly filled in by the contractor. Therefore, the contractors shall have to
kindly refer the tender for such addendum or corrigendum published by AMC through its website
www.amc.nprocure.com & www.nprocure.com 48 hours prior to the deadline of submission of the
tender. Tenderers shall verify the number of addendum issued and enclose the same with the tender
documents , failing which the tenders shall be liable for rejection and no any complaint in respect to this
shall be entertained under any circumstances.
Seal and Signature of the Bidder Addl. City Engineer
Date: (West Zone)
AHMEDABAD MUNICIPAL CORPORATION
TERMS & CONDITION
( C ) FINACIAL CONDITION
1. Cost and Currencies of Bidding
The bidder shall bear all costs associated with the preparation and submission of his bid and the
Employer will in no case be responsible or liable for those costs.
Currencies of Bid and Payment
The rates and the prices shall be quoted by the bidder entirely in Indian Rupees
All payments including advances, if any, shall be made in Indian Rupees.
2. Earnest Money Deposit :-
2.1 Bank guarantees (and other instruments having fixed validity) issued as surety for the bid shall be
valid for 28 days beyond the validity of the bid.
2.2 The EMD of the unsuccessful bidders, except for L1,L2 and L3 bidders, will be returned as
promptly as Early as possible as but not later than 28 days after the expiration of the period of bid
2.3 The EMD of the successful bidder, along with second and third lowest tenders, will be returned
when the bidder has furnished the required performance security and signed the agreement.
2.4 Earnest Money Deposit may be forfeited
a) if the bidder withdraws his bid during the period of bid validity;
b) in the case of a successful bidder, if the bidder fails within the specified time limit to
i) Furnish the required Performance Security or
ii) Sign the Agreement.
3. (A) Security Deposit :-
Within 15 (fifteen) Working days of the date of receipt of the Letter of Intent (LOI) the successful
bidder shall deliver to the Employer, a Initial Security Deposit Shall be submitted as per C.E.
Circular.in the form of a Bank Guarantee/ DD/Locle MICR cheque for an amount equivalent to
5% (five percent) of the Contract Price .
Failure of the same shall make the contractor liable for any penalty as decided by AMC. At present a
policy is framed by Audit department of AMC to charge 4% interest for the balance period and
discontinuity period.
The Security Deposit to be provided by the successful bidder in the form of a bank guarantee as
per format shall be issued as per Memorendum of work.
(E) Retention :-
a). Retention @ 2% of the value of work done will be deducted from each RA bill. It will be released
along with release of payment of Final Bill.
4. Approved Bank: - As per Annexer -I
5. No advance for machinery or materials will be given.
6. Mobilization advance will not be given.
7. Quantities in B.O.Q. may vary up to any extent and contractor shall not claim any extra rate for the
8. Penalty: - 10 percent of the balance work on Date of Completion Date or extended time limit. &
As per AMC Rule
9. Tax, Duties on Materials
All charge on account of Octroi ,excise duties, terminal tax, sales tax. Service tax, VAT (exculding
GST) etc. on material procurement or any other component for the works from any source shall be
borne by the contractors.
Special Clause:
As per construction works welfare cess Act – 1996 non-refundable one percent of tender amount
shall be deducted against works welfare cess.
Seal and Signature of the Bidder Addl. City Engineer
Date: (West Zone)
General terms & conditions
1. Tenderer should be registered in PWD/ in Govt. R&B /CPWD / AMC or equivalent
registration with any other state Govt. or institutions. Copy of registration should be attached
with tender document. Tenderer who was not registred in AMC must be get registred in
panel of approved AMC contractor.
2. A booklet of FORM B-1 of Gujarat State Roads & Building Department / Water Resources
Department with the correction slips made up to 15-08-1999 may be referred. (only English
version) Clause No. -2 liquidated damages for delay shall be overrule by A.M.C.’s
M.C.circular no.- 9 dt. 18/05/2012.
3. In the specification “as directed" / "approved" shall be taken to mean "as directed /
"approved" by the Engineering in charge.
4. Wherever a reference to any Indian standard appears in the specifications, it shall be taken to
mean as reference to the latest edition of the same of force on the date of agreement.
5. In "Mode of measurement" in the specifications wherever a dispute arises in the absence of
specific mention for a particulars point / aspect, the same in the relevant Indian Standards
shall be referred to.
6. All measurement and computations, unless otherwise specified shall be carried out nearest to
the following limits :-
i) Length, width and depth, Height 0.01 Meter
ii) Areas 0.01 Sq.mts.
iii) Cubic contents 0.01 Cu. mts.
In recording dimensions of work, the sequence of length, width and height (Depth) or thickness
shall be followed.
7. Definite particulars covered in the items of work, though not mentioned or elucidate in its
specifications shall be deemed to be included therein.
8. Approval of the samples of various materials given by the Engineer in charge or AMC's
Consultant shall not absolve the contractor from the responsibility of replacing defective
materials brought on site or materials used in the work found defective at a later date. The
contractor shall have no claim to any payment or compensation whatsoever on account of
any such materials being rejected by the Engineer in charge.
9. The contractor’s rate for the item of work shall be for the work completed in all respect.
10. All materials including those of electrical shall be got approved by the Engineer in charge/
Architect before using them in the work.
11. Materials as and when rejected by the Engineer in charge or AMC's Consultant shall be
removed from the site of work within 24 hours.
12. All work shall be carried out in a manner as per standard engineering practice.
13. All tools, templates, machinery and equipment for correct execution of the work as well as
for checking lines, levels, alignment of the works & all precautionary measures during
execution shall have to be kept in sufficient numbers and in good working condition at the
site of the work. All excavated trench shall be kept covered with barricade and caution tap.
14. Special modes of the construction not adopted in general Engineering practice, if proposed
to be adopted by the contractor shall be considered only if the contractor provided
satisfactory evidence that such special mode of construction and completion of work to the
required strength and quality. Acceptance of the same by the Engineer in charge shall not
however, absolve the contractor from the responsibility of any adverse effect and
concordance of adopting the same in the course of exaction or completion of the work.
15. The contractor shall be responsible for observing the rules and regulation imposed under the
"Minor Mineral Act", and such other laws and rules prescribed by the Government from
16. All necessary safety measures and precautions (incl. those laid down in the various relevant
Indian Standard) shall be taken to engrave the safety of men, materials and machinery on the
work and also of the work itself.
17. Quantity measured in the tender is approximate. It may increase or decrease looking to the
quantum of actual work for which no any claim shall be entertained by A.M.C.
18. Contractor shall have to execute extra item if required or as per need of AMC.
19. The work in general shall be carried out as per standard specifications of the relevant items
to be executed & as per the instruction of Engineer in charge & as per the guidance of
AMC's Consultant for this project.
20. The general terms & conditions of the contract shall be applicable & shall be binding on the
contractor. The contract agreement shall have to be executed between AMC & the agency to
which work is awarded for execution.
21. For Tender amounting below 10 lakh LOI shall be issues within 3 days after received of
sanctioned tender and resolution.Within 10 days contractor has to submit SD and after
reciveing SD Work order shall be issue to contractor and the time limit shall be start from
the date of issue of the written work order to the contractor.
For Tender amounting above 10 lakh LOI shall be issues within 3 days after received of
sanctioned tender and resolution .Within 15 days contractor has to submit SD and after
reciveing SD work order shall be issue to contractor and the time limit shall be start from the
date of issue of the written work order to the contractor.
Security Deposit of 5% of sanctioned tender amount shall be deposited by pay order /
demand draft / cheque or Bank Guarntee of nationalized bank/scheduled bank only.
Contractor shall have to sign contract paper with AMC. The contractor shall be fined 4% of
interest per year for delay in submission of S.D and shall be deducted from contractor’s bill.
22. In case of any ambiguity in specifications mentioned in this tender, the interpretation given
by M.C. Or His Designeted Officer will be final and binding to the Contractor.
23. The contractor shall take no advantage of any apparent error or omission in drawing or
specification and the Engineer -in-charge shall make such corrections and interpretations as
necessary to fulfill the intent of the plants and specifications.
24. The quantities of items in BOQ (Bill of Quantities) may vary in case of necessity arises.
25. All prevailing taxes/duties chargeable by State Govt./Central Govt. and the Municipal
Corporation. will be payable by the contractor.
26. No any kind of price rise / price escalation / price variation for cement, steel or labour shall
27. Contractor is requested to see the site physically before tendering. He is also requested to
quote the rates keeping in view of all the points mentioned in relevant pages of tender
28. Water Supply: The contractor shall arrange at his own cost, a suitable supply of piped water
for the construction of the works and provide a satisfactory supply of potable water for
drinking, washing, sanitation and cleaning down. The contractor will be responsible for all
the costs where applicable of connection, meter installation, water consumed, water required
for testing purposes, disconnection and the laying, maintenances and ultimate removal of
any distribution system around the site.
29. Electricity: Electric supply will be made available at the site by the Contractor and the
contractor must make his own arrangements with the Corporation and Electricity Supply
Authorities and with other contractors to connect and to take a supply from such services,
paying all costs in connection therewith.
The Contractor shall be entitled to use supply Electricity as may be available on the site for
purpose of the work and shall pay such charges as is fixed by the appropriate supply
In case there is any delay in supply of power site of any interruption or fault in the power
during the work. No compensation shall be paid for idle labor staff, machineries and for use
of diesel operating sets etc. as the case may be.
30. Tenders shall submit all the valid/certified documents in support of their initial/eligibility
criteria mentioned above along with the bid. They shall have also to submit the income tax
clearance certificate and solvency certificate.
31. No advance such as secured advance machinery advance, mobilization advance or materials
advance will be given.
32. The contractor shall get the electrical works executed through the authorized Government
approved licensed electrical person or firm in appropriate category in accordance to
contractual provisions.
33. The electrical works shall be carried out strictly in accordance with the directives issued by
Engineer in charge.
34. Contractors shall not have any dispute or claim for any kind of compensations
(i) If the quantity stipulated in the tender items varies or the scope of work changes & thereby
total amount of work increases/ decreases.
total amount of work increases/ decreases.
(ii) If the work gets delayed/ postponed for some administrative/ technical decision what so
35. In case of any dispute, decision of Municipal Commissioner shall be final and binding on the
36. Tenders which do not fulfill all or any of conditions or are submitted incomplete in any
respect will be rejected. Municipal Commissioner reserves the right to increase/decrease the
scope of work. No any claim to that effect shall be entertained. The Municipal
Commissioner also reserves the right to reject any or all the tenders without assigning any
reason thereof.
37. The contractors are requested to quote their rates considering above tender conditions.
38. The contractor shall have to execute the contract agreement after received work order.
Even though in special case, If work is not started because of monsoon or any other
special reason (like site is not available and due to unavoidable circumstances arise), after
evaluation of situation the actual date of starting of work will be consider after approval of
Dy.M.C. (West zone)
39. The Contractor shall not claim for increase or decrease in the quantity of the BOQ item or
the scope of work.
40. The R.A bill / final bill payment shall be made as per the latest A.M.C policy / circular for
the work done by the contractor.
41. Conditional tenders will not be accepted.
Signature of contractor with seal Additional City Engineer (W.Z)
Date Ahmadabad Municipal Corporation
AHMEDABAD MUNICIPAL CORPORATION
ENGGNIERING DEPARTMENT
GENERAL SPECIFICATION
Time limit for the work shall be 12 months after the order to start the works. Progress of work should
be in proportion to time limit. The details of reinforcement of R.C.C. work shall be as per design and
instructions of Add. City Engineer and his order will be considered final.
The contractor shall have to maintain account of steel, cement and other materials that may be brought
by him on site. This account shall be regularly maintained and kept open for inspection by Municipal
Staff. Watering of all the items shall be as per instructions otherwise no payment shall be made to
contractors. Mixing of concrete shall be done by concrete mixer machine. Arrangements of binding
vibrator for R.C.C. works if required shall have to be made by the contractor.
The contractor shall be remain responsible for Workmen’s compensation if any accident. The
contractor shall arrange for barricading at night and arrangement of Pagi at night to direct the traffic.
He shall be responsible for any damage to public. If any incident happen, during the execution of work.
In case of dispute for unseen or overlooked items the decision of the Dy. City Engineer shall be final.
The contractor shall have to give site clean of all rubbish during the work and at the time of completion
of work and hand over the site with final finishing of the work as directed. All the rejected materials
shall be removed from site within 24 hours by contractor at this risk and cost. Debris shall have to cart
daily from site.
For mixing mortar either for masonry or for plaster or for any other purpose contractor shall have to
prepare through of bigger size and mix the mortar in the required proportion. In on case he shall be
allowed to mix the mortar either on floor or any finished surfaces. The contractor shall have to make
his own arrangement for water required for the work.
If any extra item crops up during the progress of work the same shall be carried out by the contractor
and he shall be paid at the rate fixed by Add.C.E. as per the rate analysis based on latest SOR or if item
is not available in SOR than based on current market rates. In case of extra item decision of Add. City
Engg. shall remain final regarding rate.
If in the interest of the Corporation it is necessary to change either any site or the design of the propose
work the contractor shall carry out the same at his quoted rates without charges any extra and the
contractor will have to carry out the works and he will be paid at the rate quoted by him. No claim for
extra rate for subsequent changes in site and design is entertained.
The cubical contents of the cement bag shall be taken as 1-20 cft. Per bag and the contractors shall have
to prepare the measures boxes according to this measure.
Octroi exemption passes shall not be given for any materials required for the work. Contractor will be
fully responsible for compliance of the various provisions under contract Act. 1970 and the Rules
framed the to under.
The tender for the work shall remain open for a period (180) days from the date of opening of the
tenders for this work and that the tenderer shall not be allowed to withdraw on modify the offer on his
own during the period. If any tenderer withdraw or makes any modifications or addition in the terms
and conditions of his tender not acceptable to the Municipal Corporation the Municipal Corporation
shall without prejudice to any right or remedy be at liberty to forfeit in full the said earnest money and
black list the contractor.
If work is not started within specified time limit the penalty as per rule & tender condition delay of start
shall be recovered separately from the immediate bills payable to the contractor. Contractor has to
make his own arrangement for procurement of steel and cement.
Contractors should note the following conditions carefully:-
i) Conditional tender shall not be accepted.
ii) All tenders are to be submitted in duplicate without which the tenders are liable to be rejected.
iii) In case of tender downloaded from website, tender fee & EMD should be submitted in form of
iv) Condition of Form - B1 Standard Specification of material & code of practice will be
applicable. Form B1 can be is available in website. Specification shall be as per ' R& B Dept. -
Govt. of Gujarat booklets of Building Works & and Road Works Specifications published by
Gujarat Book Depot, Sector-21. Gandhinagar.
CONTRACTOR'SSIGNATURE ADD.CITY ENGINEER
& STAMP (West Zone)
TECHNICAL SPECIFICATIONS
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT
TECHNICAL SPECIFICATIONS OF WORK
Demolition of Brick work and stone masonry including stacking of serviceable materil as and disposal of
unserviceable materials with all lead and lift.(ii) In Cement Mortar.
1.0 Workmanship :
1.1 The demolition shall consist of demolition of one or more parts of the building as specified or shown in
the drawings. Demolition implies taking up or down or breaking up. This shall consist of demolishing
whole or part of work including all relevant item as specified or shown in the drawings.
1.2 The demolition shall always be planned before hand and shall be done in reverse order of the one in
which the structure was constructed. This scheme shall be got approved from the Engineer-in-charge
before starting the work. This however will not absolve the contractor from the responsibility of proper
and safe demolition.
1.3 Necessary dropping, shoring and under pinning shall be provided for the safety of the adjoining work or
property, which is to be left intact, before dismantling and demolishing is taken up and the work shall be
carried out in such a way that no damages is caused to the adjoining property.
1.4 Wherever required, temporary enclosures or partitions shall also be provide 1. Necessary precautions
shall be taken to keep the dust nuisance down as and where necessary.
1.5 Dismantling shall be commenced in a systematic manner. All materials which are likely to be damaged
by dropping from a height or demolishing roof, masonry etc. shall be carefully dismantled first. The
dismantled articles shall be properly stacked as directed.
1.6 All materials obtained from demolition shall be the property of Government unless otherwise specified
and shall be kept in safe custody until handed over to the Engineer-in-charge.
1.7 Any serviceable materials, obtained during dismantling or demolition shall be separated out and stacked
properly as directed, with all lead and lift. All unserviceable materials, rubbish etc. shall b stacked as
directed by the Engineer-in-charge.
1.8 On completion of work, the site shall be cleared of all debris rubbish and cleaned as directed.
2.0 Mode of measurements & payment :
2.1 Measurements of all work except hidden work shall be taken before demolition dismantling and no
allowance for increase in bulk shall be allowed. The demolition of lime concrete shall be measured under
this item. Specification for deduction for voids, openings etc. shall be on same basis as that employed for
construction of work.
2.2 All work shall be measured in decimal system as fixed in its place subject to the following limits, unless
otherwise stated hereinafter : (a) Dimensions shall be measured to the nearest 0.01 mt. (b) Area shall be
worked out to the nearest 0.01 sq. mt. (c) Cubical connection shall be worked out to the nearest
2.3 the rate shall include cost of all labour involved and tools used in demolishing and dismantling including
scaffolding. The rate shall also include the charges for separating out and stacking the serviceable
materials properly and disposing the unserviceable materials with all lead and lift. The rate also includes
for temporary storing for the safety of the portion not required to be pulled down or of adjoining property
and providing temporary enclosures or partitions where considered necessary.
2.4 In measuring thickness plastered walls, the thickness of plaster shall be included. The unserviceable
materials shall be disposed off with all lead and lift. Ashlar face stones dressed stone etc. if required to
be taken down intact shall be dismantled and measured separately in cubic metres.
2.5 The rate is exclusive of cleaning of bricks or stones. Honey comb works or hollow block walling shall be
measured as solid.
2.6 The rate shall be for a unit of one cubic metre.
Demolition of Brick work and stone masonry including stacking of serviceable materil as and disposal of
unserviceable materials with all lead and lift.(ii) In Cement Mortar.
The rate shall be for a unit of one Cum
Demolition of RCC work includes stacking of serviceable materials and disposal of unserviceable
materials with all leads and lifts.
The rate shall be for a unit of one Cum.The work should be done as specified in above item.
Dismentaling of sheet roofing including ridges, hips, valleys ,gutters etc. stacking of serviceable materil
as and disposal of unserviceable materials with all lead and lift.(i) G.I.sheet roofing.
1.0 Materials :
1.1 The relevant specifications of item No 20.1 (I) shall be followed except that G.I. sheet roofing shall be
dismantled instead work.
2.0 Mode of measurement & payment:
2.1 The area of G.I. sheet roofing shall be measured in sq measured in sq. metre. Ridge hips and valley shall
be girthed and included with roof area. Corrugated and semi-corrugated surfaces shall be measured flat
and not girthed.
2.2 Supporting memorial such as rafter purloins beams joints trusses etc shall be measured separately.
2.3 The rate shall be include disposal of unserviceable materials with all leads and lift and stacking the
serviceable materials as directed.
2.4 The rate shall be for a unit of one sq. meatier.
Dismentling steel work including distempering and stacking the materials with all lead and lift.
The rate shall be for a unit of one Kg.The work should be done as specified in above item.
Removing and scraping of old deteriorated plaster of any thickness from wall / RCC member including
stacking of serviceable material and disposal of unserviceable from site of work with all lead and lift
The rate shall be for a unit of one Sqm
Dismentaling tiled of stone floors laid in mortar including stacking of serviceable materilas and disposal
of unserviceable materials with all lead and lift.
1.0 Workmanship:
1.1 The relevant specifications of item no 20.1 (I) shall be followed except the dismantling of tiled or stone
floors laid on mortars shall be done Dismantling implies carefully taking up or down or these are fixed by
nail screws bolts etc. the shall be taken out with proper tools
2.0 Mode of measurement & Payment :
2.1 The supporting materials such as joints beams if any etc. shall be measured separately the relevant
specification of item no 20.1 (I) shall be followed. The rate shall include stacking the unserviceable
materials as directed will lead and lift.
The rate shall be for a unit of one Sqm
Dismentling doors, windows, ventilators etc. (wood or steel) shutters including chowkhats architraves,
hold fasts and other attachment etc. complete and stacking the material within all lead and lift.(i) Not
exceeding 3 Sq.M. in area.
1.0 Workmanship :
1.1 The relevant specifications of item No 20.1(I) shall be followed the exceeding 3 sq m in are to be
2.0 Mode of measurement & payment
2.1 The relevant specifications of item no 20.1(I) shall be followed
2.2 The door windows ventilators etc. not exceeding 3 sq mt in are each including shutters and chowkhats
architrave's holdfasts and other attachment to grams etc, will be dismantled and measured under this
2.3 The rate includes stacking serviceable material and where directed with all leads and lifts
2.5 The rate shall be for a unit of one number
Dismentling C.I. pipes G.S.W. pipes abd A.C. rain water pipes with fittings and clamps including stacking
the materials with all lead and lift (for any dia, of pipe)
The rate shall be for a unit of Rmt.The work should be done as specified in above item.
Dismantling santtary fittings like wash basin WC pan Indian and European type, flushing tank etc.
including stacking the materials with all lead and lift
The rate shall be for a unit of Each.The work should be done as specified in above item.
Dismentling barbed wire in fencing including making rolls and also including dismentling fencing posts
including all earth work concrete in base and making good the disturbed ground stacking useful
materials as directed and disposing as directed and disposing of the unserviceable materials with all
The rate shall be for a unit of Rmt.The work should be done as specified in above item.
Scraping oil paint from steel and other metal surface and making the surface even (with Hand Scraping.)
1.0 Workmanship :
1.1 The oil paint from steel and other metal surface shall be scraped thoroughly with hand scraper
followed by wire brushing (first with coarse and than with coarse and then with fine brushes) and
finally sand papering with coerce and paper (No 3) steel wood (no 2) or emery paper (NO3) or with
emery cloths . This shall then be wipped finally with mineral turpentine to remove grease and
prospiration of hand marks etc and allowed to dry. The surface shall be made even and smooth.
2.0 Mode of measurements & Payment:
2.1 The work shall be measured in actual area of work done.
2.2 The rate shall be for a unit of one sq. metre.
Excavation for foundation upto 1.5 M depth including sorting out and stacking useful materials disposing
of the excavated stuff upto 50 meter lead in loose or soft soil.
Any soil which generally yields to the application of ackaxes and shoves, phawaras rakes or any such ordinary
excavating implement or organic soil, gravel silt, sand turfloam, clay, peat etc., fall under this category.
Clearing the site :
The site on which the structure is to be built shall be cleared and all obstructions, loose stone, materials and
rubbish of all kind, bush, wood and trees shall be removed as directed. The materials so obtained shall be
property of the Government and be conveyed and stacked as directed. within 50 M. lead. The roots of the trees
coming in the sides shall be cut and coated with a hot asphalt.
The rate of site clearance is deemed to be included in the rate of earth work for which no extra will be paid.
After clearing the site, the center lines will be given by the Engineer-in-charge. The contractor shall assume full
responsibility for alignment, elevation and dimension of each and all parts of the work. Contractor shall supply
laborers, materials, etc. required for setting out the reference marks and bench marks and shall maintain them as
long as required and directed.
The excavation in foundation shall be carried out in true line and level and shall have the width and depth as
shown in the drawings or as directed. The contractor shall do the necessary shoring and shutting or providing
necessary slopes to a safe angle, at his own-cost. The payment for such precautionary measures shall be paid
separately if not specified. The bottom of the excavated area shall be 1 evened both longitudinally and
transversely. as directed by removing and watering as required. No earth filling will be allowed for bringing it to
level, if mistake or any other reason excavation is made. deeper or wider that shown on the plan or directed. The
extra depth or width shall be made up with concrete of same proportion as specified for the foundation concrete
at the cost of the contractor. The excavation up to 1.5 m. depth shall be measured under this item.
Disposal of the excavated stud :
The excavated stuff of the selected type shall be used in filling the trenches and plinth or leveling the ground in
layer including ramming and watering etc.
The balance of the excavated quantity shall be removed by the contractor from the site of work to a place as
directed with lead upped 50 M. and all lift.
Mode of measurement and payment :
The measurement of excavation in trenches for foundation shall be made according to the sections of trenches
shown on the drawing or as per sections given by the Engineer-in-charge. No payment shall be made for surplus
excavation made in excess of above requirements or due to slopping and sloping back as found necessary on
account of conditions of soil , and requirements of safety.
The rate shall be for a unit of one cubic meter.
Providing and laying cement concrete 1:5:10 (1-Cement:5-finesand:10-graded brick bat aggregates
mm nominal size) and curing complete excluding cost of formwork in(A) Foundation and Plinth
The rate shall be for a unit of one cubic meter.
Providing and laying cement concrete1:5:10 (1-Cement: 5-coarses sand and:10-hand broken stone
aggregates 40mm nominal size) and curing complete excluding cost of formworkin (A) Foundation and
Plinth (upto 10 ton)
Water shall conform to M-1. Sand shall conform M-6. Cement shall conform to M-3. Stone aggregate 40 mm.
nominal size shall conform to M-12.
Before starting concrete bed of foundation treaches shall be cleared of all loose materials, leveled, watered, and
rammed as directed.
Proportion of Mix :
The proportion of cement, sand and coarse aggregate shall be one part of cement, 5 parts of sand, 10 parts of
stone aggregates and shall so measured by volume.
The concrete shall be mixed in a mechanical mixer at the site of work. Hand mixing may however be allowed for
smaller quantity of work if approved by the Engineer-in-charge. When hand mixing is permitted by the Engineer-
in-charge incase of break-down of machinery’s and in the interest of the work. it shall be carried out on a water
tight platform and care shall be taken to ensure that mixing is continued until the mass is uniform in colour and
consistency. However in such cases 10% more cement than otherwise required shall have to be used without
any extra cost. The mixing in mechanical mixer shall be done for a period 1 to 2 minutes. The quantity of water
shall be sufficient to produce a dense concrete of required workability for the purpose.
Transporting & Placing the concrete :
The concrete shall be handled from the place of mixing to the final position in not more than 15 minutes by the
method as directed and shall be placed into its final position, compacted and finished within 30 minutes of mixing
with water i.e. before the setting commences.
The concrete shall be rammed with heavy iron rammers and rapidly to get the required compaction and to allow
all the interstriees to be filled with mortar.
After the final set, the concrete shall be kept continuously wet, if required by pounding for a period of not less
than 7 days from the date of placement.
Mode of measurement and payment :
The concrete shall be measured for its length breadth and depth, limiting dimensions to those specified on plan
or as directed.
The rate shall be for a unit of one cubic meter.
Providing and laying cement concrete1:4:8 (1-Cement: 4-coarses and:8-hand broken stone aggregates
40mm nominal size) and curing complete excluding cost of formworkin (A) Foundation and Plinth (upto
Water shall conform to M-1. Sand shall conform M-6. Cement shall conform to M-3. Stone aggregate 40 mm.
nominal size shall conform to M-12.
Before starting concrete bed of foundation treaches shall be cleared of all loose materials, leveled, watered, and
rammed as directed.
Proportion of Mix :
The proportion of cement, sand and coarse aggregate shall be one part of cement, 4 parts of sand, 8 parts of
stone aggregates and shall so measured by volume.
The concrete shall be mixed in a mechanical mixer at the site of work. Hand mixing may however be allowed for
smaller quantity of work if approved by the Engineer-in-charge. When hand mixing is permitted by the Engineer-
in-charge incase of break-down of machinery’s and in the interest of the work. it shall be carried out on a water
tight platform and care shall be taken to ensure that mixing is continued until the mass is uniform in colour and
consistency. However in such cases 10% more cement than otherwise required shall have to be used without
any extra cost. The mixing in mechanical mixer shall be done for a period 1 to 2 minutes. The quantity of water
shall be sufficient to produce a dense concrete of required workability for the purpose.
Transporting & Placing the concrete :
The concrete shall be handled from the place of mixing to the final position in not more than 15 minutes by the
method as directed and shall be placed into its final position, compacted and finished within 30 minutes of mixing
with water i.e. before the setting commences.
The concrete shall be rammed with heavy iron rammers and rapidly to get the required compaction and to allow
all the interstriees to be filled with mortar.
After the final set, the concrete shall be kept continuously wet, if required by pounding for a period of not less
than 7 days from the date of placement.
Mode of measurement and payment :
The concrete shall be measured for its length breadth and depth, limiting dimensions to those specified on plan
or as directed.
The rate shall be for a unit of one cubic meter.
Providing and laying cement concrete1:3:6(1-Cement:3-coarse sand:6-hand broken stone aggregates
40mm nominalsize) and curing complete excluding cost of formworkin(A)Foundation and Plinth (upto
Mode of Measurement shall be on cubic meter basis.
Providing and laying cement concrete work 1:2:4 (1-cement:2- coarse sand:4-graded aggregates 20mm
nominal size) curing complete excluding cost of formwork and reinforcement ( up to {(a) to (c)}
Providing and laying controlled cement concrete / Ready Mix Concrete of M-200 and curing complete,
excluding the cost of form work and reinforcement for reinforced concrete work in
1.0 Materials: Water shall conform to M-1. Cement shall conform to M-3. Sand shall conform to M-6, Grit
shall conform to M-8 Graded stone aggregate 20 mm nominal size shall conform to M-12.
2.1 The concrete mix is not required to be designed by preliminary tests. The proportion of the concrete mix
shall be 1:2:4 (1 cement :2 coarse sand : 4 graded stone aggregate 10 mm nominal size) by volume.
Concrete work shall have exposed concrete surface or as specified in the item.
2.2 The designation ordinary M-100, M-150, M-200, M-250 specified as per I.S Correspond approximately to
1:3:6, 1:2:4, 1 1/2 :3 and 1:1:2 nominal mix of ordinary concrete by volume respectively.
2.3 The ingredients required for ordinary concrete containing one beg of cement of 50 Kg. by weight (0.0342
Cu. M) for different proportions of mix shall be as under:
Grade of Total quantity of dry Proportion of fine Quantity of
concrete aggregate by volume aggregate to coarse water per
per 50 Kgs, of cement aggregate 50 Kgs. of
to be taken as the cement
sum of individual maximum.
volume of fine and
coarse aggregates,
M-100 (1:3:6) 300 Liters Generally 1:2 for fine 34 Liters
M-150 (1:2:4) 220 ” aggregate by volume but 32 “
M-200 (1:1 1/2 :3) 160 “ subject to and upper 30 “
M-250 (1:1:2) 100 “ limit of 1:1/2 and lower 27 “
2.4 The water cement ratios shall not more than those specified in the above table. The cement content of
the mix specified in the Table shall be increased if the quantity of water in a mix has to be increased to
overcome the difficulties of placement and compaction so that the water cement ratio specified in the
Table is not exceeded.
2.5 Work ability of the concrete shall be controlled by maintaining a water cement ratio that is bound to give a
concrete mix which is just sufficiently wet to be placed and compacted without difficulty with the means
2.6 the maximum size of coarse aggregate shall be as large as possible within the limits specified but in no
case greater than surround all reinforcement thoroughly and to fill the corners of the form.
2.7 For reinforced concrete work, coarse aggregates having a nominal size of 20mm are generally
considered satisfactory.
2.8 For heavily reinforced concrete members as in the case of ribs of main beams the nominal maximum
size of coarse aggregate should usually be restricted to 5 mm less than the minimum clear distance
between the main bars, or 5 mm less than the minimum cover to the reinforcement whichever is smaller.
2.9 Where the reinforcement is widely spaced as in solid slabs, limitations of size of the aggregate may not
be important and the nominal maximum size may sometimes be as greater than the minimum cover.
2.10 Admixture may used in concrete only with approval of Engineer-in-charge based upon the evidence that
with the passage of time, neither the compressive strength of concrete is reduced nor are other requisite
qualities of concrete and steel impaired by the use of such admixtures.
3.0 Workmanship:
3.1 Proportioning: Proportioning shall be done by volume, except cement which shall be measured in terms
of bags of 50 Kg. weight. The volume of one such bag being taken as 0.0342 Cu. Meter. Boxes of
suitable sizes shall be used for measuring sand aggregate. The size of the boxes (internal) shall be
cms x 25 cms. and 40 cms deep. White measuring the aggregate and sand, the box shall be filled
without shaking ramming or hammering. The proportioning of sand shall be on the basis of its dry volume
and in case of damp sand, allowances for bulkage shall be made.
3.2.1 For all work, concrete shall be mixed in a mechanical mixer which along with other accessories shall be
kept in first class working condition and so maintained throughout the construction. Measured quantity of
aggregate, sand, cement required for each batch shall be poured into the drum of the mechanical mixer
while it is continuously running. After about half a minute of dry mixing, measured quantity of water
required for each batch of concrete mix shall be added gradually and mixing continued for another one
and half a minute. Mixing shall be continued till materials are uniformly distributed and uniform color of
the entire mass is obtained and each individual particle of the coarse aggregate shows complete coating
of mortar containing its proportionate amount of cement. In no case shall the mixing be done for less than
2 minutes after all ingredients have been put into the mixer.
3.2.2 When hand mixing is permitted by the Engineer-in-charge for small jobs or for certain other reasons, it
shall be done on the smooth watertight platform large enough to allow efficient turning over the
ingredients of concrete before and after adding water. Mixing platform shall be so arranged that no
foreign material gets mixed with concrete nor does the mixing water flow out. Cement in required number
of bags shall be placed in a uniform layer on top of the measured quantity of fine and coarse aggregate,
which shall also be spread in a layer of uniform thickness on the mixing platform. Dry coarse and fine
aggregate and cement shall then be mixed thoroughly by turning over to get a mixture to uniform color.
Specified quantity of water shall then be added gradually through a rose-can and the mass turned over
till a mix of required consistency is obtained. In hand mixing quantity of cement shall be increased by
percent above that specified.
3.2.3 Mixers which have been out of use for more than 30 minutes shall be thoroughly cleaned before putting
in a new batch. Unless otherwise agreed to by the Engineer-in-charge the first batch of concrete from the
mixture shall contain only two thirds of normal quantity of coarse aggregate. Mixing plant shall be
thoroughly cleaned before changing from one type of cement to another.
3.3 Consistency :
3.3.1 The degree of consistency which shall depend upon the nature of the work and methods of vibration of
concrete, shall be determined by regular slump tests in accordance with I.S. 1199-1959. The slump of
10mm to 25mm. shall be adopted when vibrators are used and 80mm when vibrators are not used.
3.4 Inspection:
3.4.1 Contractor shall give the Engineer-in-charge due notice before placing any concrete in the forms to
permit him to inspect and accept the false work and forms as to their strength, alignment, and general
fitness but such inspection shall not relieve the contractor of his responsibility for the safety of men,
machinery, materials and for results obtained. Immediately before concreting, all forms shall be
thoroughly cleaned.
3.4.2 Centering design and its erection shall be got approved from the Engineer-in-charge. One carpenter
with helper shall invariably be kept present throughout the period of concreting. Movement of labour and
other persons shall be totally prohibited for reinforcement laid in position. for access to different parts,
suitable mobile platforms shall be provided so that steel reinforcement in position is not disturbed. For
ensuring proper cover, mortar blocks of suitable size shall be provided so that steel reinforcement in
position is not disturbed. For ensuring proper cover, mortar blocks of suitable size shall be cast and tied
to the reinforcement. Timber kapachi or metal pieces shall not be used for this purpose.
3.5 Transporting and laying:
3.5.1 The method of transporting and placing concrete shall be as approved. Concrete shall be so transported
and placed that no contemination, segregation or loss of its constituent material takes place.
All form wok shall be cleaned and made free from standing water, dust, show or ice immediately before
placing of concrete.
No concrete shall be placed in any part of the structure until the approval of the Engineer-in-charge has
3.5.2 Concreting shall proceed continuously over the area between construction joints. Fresh concrete shall
not be placed against concrete which has been in position for more than 30 minutes unless a proper
construction joint is formed. Concrete shall compacted in its final position within 30 minutes of its
discharge from the mixer. Except where otherwise agreed to by the Engineer-in-charge concrete shall be
deposited n horizontal layers to a compacted depth of not more than 0.45 meter when internal vibrators
are used and not exceeding 0.30 meter in all other cases.
3.5.3 Unless otherwise agreed to by the Engineer-in-charge, concrete shall not be dropped into place from a
height exceeding 2 meters. When trunking or chutes are used they shall be kept close and used in such
a way as to avoid segregation. When concreting has to be resumed on a surface which has hardened, it
shall be roughened, swept clean, thoroughly wetted and covered with a 13 mm thick layer of mortar
composed of cement and sand in the same ratio as in the concrete mix itself. This 13 mm layer of mortar
shall be freshly mixed and placed immediately before placing of new concrete. Where concrete has not
fully hardened, all laitance shall be removed by scrubbing the wet surface with wire or bristle brushes,
care being taken to avoid dislodgment of any particles of coarse aggregate. The surface shall then be
thoroughly wetted, all free water removed and then coated with neat cement grout. The first layer of
concrete to be placed on this surface shall not exceed 150 mm in thickness and shall be well rammed
against old work particular attention being given to corners and close spots.
3.5.4 All concrete shall be compacted to produce a dense homogeneous mass with the assistance of vibrators,
unless, otherwise permitted by the Engineer-in-charge for exceptional cases, such as concreting under
water, where vibrators cannot be used. Sufficient vibrators in serviceable condition shall be kept at site
so that spare equipment is always available in the event of breakdowns.
Concrete shall be judged to be compacted when the mortar fills the spaces between the coarse
aggregate and begins to cream up to form an even surface. Compaction shall be completed before the
initial setting starts i.e. within 30 minutes of addition of water to dry mixture. During compaction, it shall
be observed that needle vibrators are not applied on reinforcement which is likely to destroy the bond
between concrete and reinforcement.
3.6 Curing: Immediately after compaction, concrete shall be protected from weather including rain, running
water, shocks, vibration, traffic, rapid temperature changes, frost and drying out process. It shall be
covered with wet sacking, hassain or other similar absorbant material approved, soon after the initial set
and shall be kept continuously wet for a period of not less than 14 days from the date of placement.
Masonary work over foundation concrete may be started after 48 hours of its laying but curing of
concrete shall be continued for a minimum period of 14 days.
3.7 Sampling and Testing of concrete:
3.7.1 Samples from fresh concrete shall be taken as per I.S. 1199-1959 and cubes shall be made, cured and
tested at 7 days or 28 days as per requirements in accordance with I.S. 516-1959. A random sampling
procedure shall be adopted to ensure that each concrete batch shall have a reasonable chance of being
tested i.e. the sampling should be spread over the entire period of concreting and cover all mixing units.
The minimum frequency of sampling of concrete of each grade shall be in accordance with following:
Quantity of concrete No. of Quantity of concrete in No. of samples
in the work samples the works
51 and above 4+ one additional for each additional 50 M. or part thereof.
NOTE : At least one sample shall be taken from each shift. Ten test specimens shall be made from each
sample, five for testing at 7 days and the remaining five at 28 days. The samples of concrete shall be
taken on each day of the concreting as per above frequency. The number of specimens may be suitably
increased as deemed necessary by the Engineer-in-charge when procedure of tests given above reveals
a poor quality of concrete and in other special cases.
3.7.2 The average strength of the group of cubes cast for each day shall not be less than the specified cube
strength of 150 Kg/Cm at 28 days. 20% of the cubes cast for each day may have value less than the
specified strength provided the lowest value is not less than 85% of the specified strength. If the
concrete made in accordance with the proportions given for a particular grade, does not yield the
specified strength; such concrete shall be classified as belonging to the appropriate lower grade.
Concrete made in accordance with the proportions given for a particular grade shall not, however, be
placed in a higher grade on the ground that the test strength are higher than the minimum specified.
3.8.1 The Engineer-in-charge shall be informed in advance by the contractor of his intention to strike the form
work. While fixing the time for removal of form work, due consideration shall be given to local conditions,
character for the structure, the weather and other condition that influence the setting of concrete and of
the materials used in the mix. In normal circumstances (generally where temperatures are above 20 C)
and where ordinary concrete is used, forms may be struck after expiry of periods specified in item No
9.1(A) for respective item of form work.
3.8.2 All form work shall be removed without causing any shock or vibration as would damage the concrete.
Before the soffit and struts are removed, the concrete surface shall be exposed, where necessary in
order to ascertain that the concrete has sufficiently hardened. Centering shall be gradually and uniformly
lowered in such manner as to permit the concrete to take stresses due to its own weight uniformly and
gradually. Where internal metal ties are permitted, the or their removable parts shall be extracted without
causing any damage to the concrete and remaining holes filled with mortar. No permanently embedded
metal part shall have less than 25 mm cover to the finished concrete surface. Where it is intended to re-
use the form work, it shall be cleaned and made good to the satisfaction of the Engineer-in-charge. After
removal of form work and shuttering, the Executive Engineer shall inspect the work and satisfy by
random checks that concrete produced is of good quality.
3.8.3 Immediately after the removal of forms, all exposed bolts etc., passing through the cement concrete
member and used for shuttering or any other purpose shall be cut inside the cement concrete member to
a depth of at least 25 mm below the surface of the concrete and the resulting holes be filled by cement
mortar. All fine caused by form joints, all cavities produced by the removal of form ties and all other holes
and depressions honeycomb spots, broken edges or corners and other defects shall be thoroughly
cleaned, saturated with water and carefully pointed and rendered true with mortar of cement and fine
aggregate mixed in the proportions used in the grade of concrete that is being finished and of as dry
consistency as is possible to use. Considerable pressure shall be applied in filling and pointing to ensure
thorough filling in all voids. Surfaces which are pointed shall be kept most for a period of 25 hours.
If rock pockets/honeycombs in the opinion of the Engineer-in-charge are of such an extent or character
as to effect the strength of the structure materially or to endanger the life of the steel reinforcement, he
may declare the concrete defective and require the removal and replacement of the portion of the
structure affected.
4.0 Mode of measurement and payment:
4.1 The consolidated cubical contents of concrete work as specified in item shall be measured. The concrete
laid in excess of section shown on drawings or as directed shall not be measured. No deduction shall be
(a) Ends of dis-similar materials such as joints, beams, posts, girders, rafters, purline trusses, corbels and
steps etc. up to 500 Sq. Cm. in section.
(b) Opening up to 0.1 Sq. M.
4.2 The rate includes cost of all materials, labour, tools and plant required for mixing, placing in position,
vibrating and compacting, finishing, as directed, curing and all other incidental expenses for producing
concrete of specified strength. The rate excludes the cost of form work.
4.3 The rate shall be for a unit of one cubic meter.
5.4.1 Providing and laying cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate
mm nominal size) and curing complete excluding cost of form work and reinforcement for reinforced
concrete work in :
(A) Foundation footing, base of columns and mass (B) Slabs, landings, shelves, balconies, internals beams
girders and cantilever up to floor two level (C) Columns, pillars, posts and struts up to floor two level (D)
Staircase up to floor two level (E) Vertical and horizontal fins up to floor two level.
1.0 Materials & Workmanship
1.1 The relevant specification of item No. 5.3.13 shall be followed except that the work shall be carried out
for reinforced concrete work for work as specified in item 1.2. In addition, the following stipulations shall
be followed for :
(a) The bars shall be kept in position by the following methods:
(i) In case of beam and slab construction, sufficient number of precast cover blocks in cement mortar 1:2 (1
cement : 2 coarse sand) about 4 cms x 4 cms section and of thickness equal to the specified cover shall
be placed between the bars and shuttering as to secure and maintain the requisite cover of concrete over
the reinforcement.
In case of cantilevered or doubly reinforce beams of slabs, the main reinforcing bars shall be held in
position by introducing chain spacers or supports bars at 1.0 to 1.2 meters centers.
(ii) In case of columns walls, the vertical bars shall be kept in position by means of timber temphtes with
slotes accurately out in them. The temphtes shall be removed after concreting has been done below it.
The bars may also be suitably tied by means of annealed steel wires to the shuttering to maintain their
position during concreting.
1.2 All bars projecting from pillars, columns beams, slabs etc., to which other bars and concrete are to be
attached or bounced to later on, shall be protected with a coat of thin neat cement grout, if the bars are
not likely to be incorporated with succeeding mass of concrete within the following 10 days. This coat of
thin neat cement shall be removed before concreting.
2.0 Mode of measurement and payment:
2.1 Relevant specifications of item No. 5.3.13 shall be followed.
2.2 The volume occupied by reinforcement shall not be deducted from R.C.C. work.
2.3 The rate shall be for a unit of one cubic meter.
Providing form work of ordinary timber planking so as to give a rough finish including centering
shuttering, strutting and propping etc. height of propping and centering below supporting floor to celling
not exceeding 4 m. and removal of the same for in site reinforced concrete or plain concrete work upto
floor four level ( a to h)
The shuttering to be provided shall be of ordinary timber planks and shall conform to M-26.
The dimensions of scantlings and battens shall conform to the design. The strength of the wood shall not be less
than that assumed in the design.
The form work shall conform to the shape lines and dimension as shown on the plans and be so constructed as
to remain sufficiently rigid during the placing and compacting of the concrete. Adequate arrangements shall be
made by the contractor to safe guard against any settlement of the form work during the course of concreting and
after concreting. The form work of shuttering, centering, scaffolding bracing etc shall be as per design.
Cleaning & Treatment of forms:
All rubbish, particularly chippings shaving and saw dust shall be removed from the interior of the form before the
concrete is placed and the form work in contact with concrete shall be cleaned and thoroughly wetted or treated.
The surface shall be then coated with soap solution applied before concreting is done. Soap solution for the
purpose shall be prepared by dissolving yellow soap in water to get consistency of paint. Alternatively a coat of
raw linseed oil or form oil of approved manufacture may be applied in case steel shuttering is used. Soap solution
or raw linseed oil shall be applied after thoroughly cleaning the surface. Care shall be taken that the coating does
not get on construction joint surface and reinforcement bars.
Stripping time:
In normal circumstances and where ordinary cement is used forms may be struck after expiry of following
Sides of walls columns and vertical faces of beam 24 to 48 hours.
Beams soffits (Props left under) 7 days.
Removal of props slabs
(i) Slabs spanning up to 4.5 m – 7 days (ii) Spanning over 4.5 mm 14 days
Removal of props to beams and arches
(i) Spanning up to 6 m – 14 days (ii) Spanning over 6 m 21 days
Procedure when removing the form work:
All form work shall be removed without such shock or vibration as would damage the reinforced concrete surface.
Before the soffits form work and struts are removed, the soffits and the concrete surface shall be exposed where
necessary in order to ascertain that the concrete has sufficiently hardened.
The centering to be provided shall be got approved. It shall be sufficiently strong to ensure absolute safely of the
form work and concrete work before, during and after pouring concrete. Watch should be kept to see that
behavior of centering and form work is satisfactory during concreting. Erection should also be such that it would
allow removal of forms in proper sequence without damaging either the concrete or the forms to be removed.
The props of centering shall be provided on firm foundation or base of sufficient strength to carry the loads
without any settlement.
The centering and form work shall be inspected and approved by the Engineer-in-charge before concreting. But
this will not relieve the contractor of his responsibility for strength, adequacy and safety of form work and
centering. If there is a failure of form work or centering, contractor shall be responsible for the damages to the
work, injury to life and damage to property.
All scaffolding, hoisting arrangements and ladders etc required for the facilitating of concreting shall be provided
and removed on completion work by contractor at his own expense. The scaffolding, hoisting arrangements and
ladders etc. shall be strong enough to with stand all live, dead and impact loads expected to act and shall be
subject to the approval of the Engineer-in-charge. However, contractor shall be solely responsible for the safety
of the scaffolding, hoisting arrangement, ladders, work and workman etc.
The scaffolding hoisting arrangements and ladders shall allow easy approach to the work spot and afford easy
The rate is applicable to all conditions of working and height up to 4 mts. The rate shall include the cost of
materials and labour for various operations involved such as:
Splayed edges, notching, allowance for overlaps and passing at angles, battens centering, shuttering propping,
bolting, nailing, wedging, easing, striking and removal.
Filleting to form stop chamfered edges or splayed external angles not exceeding 20 mm width to beams, columns
Temporary openings in the forms for pouring concrete, if required, removing rubbish etc.
Dressing with oil to prevent adhesion of concrete with shuttering, and
Raking or circular cutting.
Rate shall be paid in Sq.m
Providing thermo Mechanically treated bars (TMT BARS) confirming IS 1786/Fe 415 for R.C.C. wroks
including cutting , bending, binding and placing in position complete upto floor two level.
The scope of work consists of providing and laying mild steel reinforcement and TMT CRS Fe-500
reinforcement for RCC works of various components of the structure. This may be Tisco or any other approved
manufacturer branch and corrosion resistant steel bars approved by the Engineer Incharge. This includes
cuttings, bending, binding, placing, with all equipments and labour required for the work as directed by the City
Engineer, Ahmedabad and all operations covered within the intent and purpose of the specification.
Being of Reinforcement
Reinforcing steel shall conform accurately to the dimensions shown on relevant drawings and conforming
to the relevant IS codes (latest revision).
Bars shall be bent cold to the specified shape and dimensions or as directed by the City Engineer, AMC,
Ahmedabad using a proper bar bender, operated by hand or power to attain proper radii of bends.
Bars shall not be bent or straightened in a manner that will cause injury to the material.
Bars bent during transport or handling shall be straightened before being used on work; they shall not be
heated to facilitate bending.
The bending of the TMT bars shall be carried out as per the following:
S.No Operation Size TMT CRS-Fe-500
1 Bend Upto 22 mm dia 3d
Over 22 mm dia 4d
2 Rebend Upto 10mm dia 4d
Over 10 mm dia 5d
Placing of Reinforcement:
All reinforcing bars shall be accurately placed in the exact position shown on the drawings, and shall be
securely held in position during placing of concrete by annealed binding wire not less than 1 mm in size and
conforming to IS:280 and by using stays blocks or metal chairs, spacer, metal hangers, supporting wires or other
approved devices at sufficiently close intervals. Bars will not be allowed to sag between supports nor displaced
during concreting or any other operation over the work. All devices used for positioning shall be of non-corrodible
material. Wooden and metal supports will not extend to the surface of concrete, except where shown on the
drawings, placing bars on layers of freshly laid concrete as the work progresses for adjusting bar spacing will not
be allowed. Pieces of broken stone, brick or wooden blocks shall not be used. Layers of bars shall be separated
by spacer bars, precast mortar blocks or other approved devices.
Reinforcement after being placed in position shall be maintained in a clean condition until completely
embedded in concrete. Special care shall be exercised to prevent any displacement of reinforcement in concrete
already placed.
To protect reinforcement from corrosion, concrete cover shall be provided as indicated on the drawings.
All bars protruding from concrete to which other bars are to be spliced and which are likely to be exposed for an
indefinite period shall be protected by a thick coat of neat cement grout.
In the case of columns and walls, vertical bars shall be kept in normal position with timber templates
having slots accurately cut in for bar position. Such templates shall be removed after the concreting has
progressed upto a level just below them.
Bars crossing each other, where required, shall be secured by binding wire (annealed) of size not less
than 1 mm and conforming to IS;280 in such a manner that they do not slip over each other at the time of fixing
and concreting. As far as possible, bars of full length shall be used. In case this is not possible, overlapping of
bars shall be done as directed by the City Engineer, AMC, Ahmedabad. When practicable, overlapping bars shall
not touch each other, but be kept apart by 25 mm or 1 ¼ times the maximum size of the coarse aggregates
whichever is greater, by concrete between them. Where this is not feasible, overlapping bars shall be bound with
annealed steel wire, not less than [1 mm thickness twisted tight in eight shape around the lapped bars. The
overlaps shall be staggered for different bars and located at fixed locations only along the span where neither
shear nor being moment is maximum.
Welding of Bars
Welding of TMT bars can be permitted if specified on the drawings, joints of reinforcement bars shall be
butt welded so as to transit their full strength. Welded joints shall preferably be located at points where steel will
not be subject to more than 75 percent of the maximum permissible stresses and welds so staggered that at any
one section, not more than 33 per cent of the rods are welded. No –pre-warning or post heat treatment is
necessary. Interpass temperature should be limited to 200º C with low heat input and equivalent strength low
hydrogen type electrode. Suitable means shall be provided for holding the bars securely in position during
welding. It must be ensured that no voids are left in welding and when welding is done in 2 or 3 stages, previous
surface shall be cleaned property. Ends of the bars shall be cleaned of all loose scale, rust, grease, paint and
other foreign matter before welding. Only competent welders shall be employed on the work.
Welded pieces of reinforcement shall be tested. Specimens shall be taken from the actual site and their
number and frequency of tests shall be as directed by the City Engineer, AMC, Ahmedabad.
The TMT bars shall be tested for any or all of the following tests as directed by the Engineer Incharge
Alternate immersion test
Salt spray test
Atmospheric exposure test
Sulphur dioxide test
Potentio dynamic test
Filling available excavated earth in trenches, plinth, sides of foundation etc. incl. watering and ramming :
The earth obtained from excavation shall be filled in layers not exceeding 20 cms. in depth and water thoroughly
after each layer and shall be properly consolidated with rammers so that no hollow voids remain there. In
general the work shall be carried out in the best manner so that no hollow voids remain after work. Workmanship
in general confirm to C –2.
Mode of Measurement shall be on cubic meter basis.
filling in plinth with sand under floors including watering, ramming consolidated and dressing etc.
Sand shall conform to M.
The sand to be used for filling shall be free from salts, organic or other foreign matter, All clods of earth shall be
As soon as the work in foundation has been completed and measured, the site of foundation shall be cleared of
all debris, brick bats, mortar dropping etc; and filled with sand in layers not exceeding 20 Cms. Each layer shall
be adequately watered rammed and consolidated before the succeeding layer is laid. The sand shall be rammed
with iron rammers where feasible and with the butt ends of crow-bars, where rammer cannot be used.
The plinth shall be similarly filled with sand in layers not exceeding 20 Cms adequately watered and consolidated
by ramming with iron or wooden rammers. When nfilling reaches finished level, the surface shall be flooded with
water for at least 24 hours and allowed to dry and then rammed and consolidated.
The finished level of filling shall be kept to shape intended to be given to floor.
In case of large heavy duty flooring like factory flooring, the consolidation may be done by power rollers, where
so specified. The extent of consolidation required shall also be as specified.
Mode of measurement and payment :
The payment shall be made for filling in plinth and trenches, No deduction shall be made for shrinkage
or voids if consolidated as instructed above
The rate includes cost of collecting carting sand with all lead and labour for filling the same in plinth under floors.
The rate shall be for a unit of one cubic meter.
Filling in foundation and plinth with murrum or selected soil in layers of 20 cm. thickness including
watering, ramming and consolidating etc. Complete
Filling in foundation and plinth with murrum or selected soil shall be filled in layers not exceeding 20 cms.
in depth and water thoroughly after each layer and shall be properly consolidated with rammers so that no hollow
voids remain there. In general the work shall be carried out in the best manner so that no hollow voids remain
after work. Workmanship in general confirm to C –2.
Mode of Measurement shall be on cubic meter basis.
Brick work using common burnt clay building bricks having crushing strength not less than
35kg./Sq.Cm.in foundation and plinth in Cement Mortar1:6 (1- Cement :6 - fine sand) (A) Conventional
(upto 10 ton) (B) Modular
Extra Rate for brickwork in Above Item for super structure above plinth level upto floor two level
Materials: Water shall conform to M-1 Cement shall conform to M-3 Sand shall conform to M-6. Brick shall
conform to M-15 Cement mortar shall conform to M-11.
The proportion of the cement mortar shall be 1:6 (1 cement : 5 fine sand) by volume.
Wetting of bricks:
The bricks required for masonry shall be thoroughly wetted with clean water for about two hours before use or as
directed. The cessation of bubbles, when the bricks are wetted with water is an indication of through wetting of
Bricks shall be laid in English bond unless directed otherwise. Half or cut bricks shall not be used except when
necessary to complete to bond; closer in such case shall be cut to required size and used near the ends of walls.
A layer of mortar shall be spread on full width for suitable length of the lower course. Each brick shall first be
properly bedded and set home by gently tapping with handle of trowel or wooden mallet. It side face shall be
flushed with mortar before the next brick is laid and pressed against it. On copletion of course, the vertical joints
shall be fully filled form the top with mortar.
The walls shall be taken up truly in plumb. All courses shall be laid truly horizontal and all vertical joint shall be
truly vertical. Vertical joints in alternate course shall generally be directly one over the other. The thickness of
brick course shall be kept uniform.
The brick shall be laid with frog upwards. A set of tools comprising of wooden straight edges, mason’s sprit level,
square half meter rub, and pins, string and plumb shall be kept on the site of work for frequent checking during
the progress of work.
Both the faces of walls of thickness greater than 23 cms shall be kept in proper place. All the connected brick
work shall be kept not more than one meter over the rest of the work. Where this is not possible, the work shall
be raked back according to bond (and not left toothed) at an angle not steeper than 45 degrees.
All fixtures, pipes, outlets of water, hold fasts of doors and windows etc. which are required to be built in wall shall
be embedded in cement mortar.
Bricks shall be so laid that all joints are quite flush with mortar. Thickness of joins shall not exceed 12 mm. The
face joints shall be raked out as directed by taking tools daily during the progress of work, when the mortar is still
green so as to provide key for plaster or pointing to done.
The face of brick shall be cleaned the very day on which the brick work is laid and all mortar dropping removed.
Green work shall be protected from rain suitably. Masonry work shall be kept moist on all the faces for a period
seven days. The top of masonry work shall be kept well wetted at the close of the day
Preparation of foundation bed:
If the foundation is to be laid directly on the excavated bed, the bed shall be leveled, cleared of all loose
materials, cleaned and wetted before starting masonry. If masonry is to be laid on concrete footing, the top of
concrete shall be cleaned and moistened. The contractor shall obtain the engineer'’ approval for the foundation
bed, before foundation masonry is started. When puccas flooring is to be provided flush with the top to plinth, the
inside plinth offset shall be kept lower than the outside plinth top by the thickness of the flooring.
Mode of measurements and payment:
The measurements of this item shall be taken for the brick masonry fully completed in foundation up to plinth.
The limiting dimensions not exceeding those shown on the plans or as directed shall be final. Battered, tapered
and curved portions shall be measured net.
No deduction shall be made from the quantity of brick work nor any extra payment made for embedding in
masonry or making holes in respect of following items:
Ends of joints, beams, posts, girders, rafters, purlins, trusses, corbel steps etc. where cross sectional area does
not exceed 500 Sq. cm.
Opening not exceeding 1000 Sq. cm.
Wall plates and bed plates, bearing of slabs, chhajas an the like whose thickness does not exceed 10 Cms. and
the bearing does not extend to the full thickness of wall.
Drainage holes, and recesses for cement concrete blocks to embed hold fasts for doors, windows etc.
Iron fixtures, pipes up to 300 mm dia hold fasts and doors and windows built into masonry and pipes etc. for
concealed wiring.
Forming chases of section not exceeding 350 Sq. Cm. in masonry.
Apertures for fire places shall not be deducted nor shall extra labour required to make splaying of jambs,
throating and making Arches over the aperture be paid for separately.
The rate shall be for a unit of one cubic meter.
Half brick masonry in common brunt clay building bricks having crushing strength not less than
Kg/Sq.Cm. in Cement mortar 1:5 ( 1-Cement : 5 coarse sand ) in foundation and Plinth
conventional brickwork (up to 10 ton)
The rate shall be for a unit of Sq. Mt.
Extra for half brick masonry in super structure above plinth level upto floor two level (B) conventional
Materials: Brick shall conform to M-15. Water shall conform to M-1. Cement shall conform to M-3. Sand shall
conform to M-6. Cement mortar shall conform to M-11.
Relevant specifications of bricks, wetting and laying of bricks, joints, curing etc. shall conform to item No.
except the brick work of half bricks shall be carried out.
Cement mortar used in masonry work shall be in proportion of 1 part of cement and 5 part of sand by volume.
All bricks shall be laid strecher wise, breaking joints with those in the upper and lower courses. The wall shall be
taken truly plumb. All courses shall be laid truly horizontal and all vertical joints shall be truly vertical. The bricks
shall be laid with frogs upwards. A set of masons tools shall be maintained on work as required for frequent
Mode of measurement and payment:
The half brick masonry work in foundation and plinth shall be measured under this item, the limiting dimensions
shall not exceed those shown in the plan or as directed. Any work done extra over the specified dimensions shall
The relevant specifications of item No. 7 shall be followed. The length shall be measured nearest to one Cm.
The rate shall be for a unit of Sq. Mt.
Providing and laying polished Kota stone slab flooring over 20 mm (Average) thick base of cement
mortar 1:6 (1-cement:6-coarses and) or L.M.1.1.5 (1-Lime putty:1.5-coarses and) laid over and jointed with
grey cement slurry mixed with pigment to match the shade of slab including rubbing and polishing etc.
complete. (A) 25 mm thick (upto 10 ton)
Water shall conform to M-1. Lime mortar shall conform to M-10. Cement mortar shall conform to M-11. Marble
stone slab 20 mm. thick.
Dressing of slab : Every stone shall be cur to required size and fine chisel dressed to give a smooth and even
surface on all sides to the full depth. A straight edge laid along the sides of the stone shall be fully in contact with
it. Chisel dressing shall also be done on top surface to remove any waviness. The sides and top surface to
granite slabs shall be machine polished and molding etc. complete before using. All angles and edges of slabs
shall be true square and free form chippings.
The thickness of stone shall be 18 mm. The allowable tolerance shall be 1 mm. allowable. The tolerance shall be
15 mm. in length and breath.
Bedding : Bedding of granite slabs shall be lime mortar 1:1.5 (1 Lime putty : 1.5 coarse sand) or cement mortar
1:6 (1 cement : 6 coarse sand) of average thickness 20 mm. thick as given in description of item. Minimum
thickness at any place shall not be less than 10 mm.
Laying : The surface of sub grade shall be cleared wetted and mopped. Mortar of specified mix and thickness
shall then be spread on an are sufficient to receive one granite slab, The slab shall be washed clean before
laying. It shall be laid on top pressed and tapped gently to bring it in level with other slabs. It shall then be lifted
and laid a side. The top surface of the mortar shall then be corrected by adding fresh mortar at hollows, or
depressions. The mortar shall then be allowed to harden it over this surface cement slurry of honey like
consistency at 4.4 Kg. Of cement per sq. metre. The edges of slabs already paved shall be buttered with grey
cement. The slab shall then be gently placed in position and tapped with wooden mallet till it is properly bedded
in level with and close to the adjoining slab. The joints shall be as fine as possible : Surplus cement on the
surface of the slabs shall be removed. The slab fixed in the floor adjoining the walls shall enter not less 10 mm.
under the plaster skirting or dado. The junction between the walls and floors shall be finished neatly. The finished
surface shall be true to level and slopes as directed.
Curing : The floor shall be cured for minimum period of seven days.
Mode measurements & payment :
marble stone flooring with various kinds of marble shall measured in sq. metre. The length and breadth shall be
measured between the finished face of skirting or dado or wall plaster. No deduction shall be made not extra
shall be paid for any openings in the floor or area upto 0.05 sq. mt. Nothing extra shall be paid for laying stone at
different levels in the same room. Treads and steps of stairs paved with granite stone slabs shall also be
measured under flooring.
The rate shall be for a unit of one sq. metre.
Providing and laying polished kota stone slab 25mm thick in risers of steps,skirting Dedo and pillars
laidon 10mm thick cement mortar 1:3 (1-Cement : 3coarse sand) and jointed with gray cement slurymixed
with pigment to match the shade of slabincluding rubbing and polishing etc. complete.
Water shall conform to M-1. Lime mortar shall conform to M-10. Cement mortar shall conform to M-11. Marble
stone slab 20 mm. thick.
Dressing of slab : Every stone shall be cur to required size and fine chisel dressed to give a smooth and even
surface on all sides to the full depth. A straight edge laid along the sides of the stone shall be fully in contact with
it. Chisel dressing shall also be done on top surface to remove any waviness. The sides and top surface to
granite slabs shall be machine polished and molding etc. complete before using. All angles and edges of slabs
shall be true square and free form chippings.
The thickness of stone shall be 18 mm. The allowable tolerance shall be 1 mm. allowable. The tolerance shall be
15 mm. in length and breath.
Bedding : Bedding of granite slabs shall be lime mortar 1:1.5 (1 Lime putty : 1.5 coarse sand) or cement mortar
1:6 (1 cement : 6 coarse sand) of average thickness 20 mm. thick as given in description of item. Minimum
thickness at any place shall not be less than 10 mm.
Laying : The surface of sub grade shall be cleared wetted and mopped. Mortar of specified mix and thickness
shall then be spread on an are sufficient to receive one granite slab, The slab shall be washed clean before
laying. It shall be laid on top pressed and tapped gently to bring it in level with other slabs. It shall then be lifted
and laid a side. The top surface of the mortar shall then be corrected by adding fresh mortar at hollows, or
depressions. The mortar shall then be allowed to harden it over this surface cement slurry of honey like
consistency at 4.4 Kg. Of cement per sq. metre. The edges of slabs already paved shall be buttered with grey
cement. The slab shall then be gently placed in position and tapped with wooden mallet till it is properly bedded
in level with and close to the adjoining slab. The joints shall be as fine as possible : Surplus cement on the
surface of the slabs shall be removed. The slab fixed in the floor adjoining the walls shall enter not less 10 mm.
under the plaster skirting or dado. The junction between the walls and floors shall be finished neatly. The finished
surface shall be true to level and slopes as directed.
Curing : The floor shall be cured for minimum period of seven days.
Mode measurements & payment :
marble stone flooring with various kinds of marble shall measured in sq. metre. The length and breadth shall be
measured between the finished face of skirting or dado or wall plaster. No deduction shall be made not extra
shall be paid for any openings in the floor or area upto 0.05 sq. mt. Nothing extra shall be paid for laying stone at
different levels in the same room. Treads and steps of stairs paved with granite stone slabs shall also be
measured under flooring.
The rate shall be for a unit of one sq. metre.
Labour Work for moulding the polish kota stone surface rate also including provding cutting and grinder
machine for molding work etc.complete as directed.
The rate shall be for a unit of one sq. metre.
Labour work for Polish kota stone surface rate also including providing cutting and grinder machine for
molding work etc comlete as directed
The rate shall be for a unit of one sq. metre.
Providing and laying white glazed tiles 6mm thick in flooring tread sofstep sand landing laid on abed of
12mm thick cement mortar 1:3 (1-cement:3-coarse sand) finishing with flush pointing in white cement.
Providing and laying White / Colour glazed tiles 6 mm. thick in skirting, risers of steps and dedo on
mm. thick cement plaster 1:3 (1 cement : 3 coarse sand) and jointed with white cement slurry.
Providing and laying coloured glazed tiles of the size 300mm x 200 mmx 8mm/ 300mm x 450mm x 8mm in
skirting, riser sof steps and dedo on 10mm. thick cement plaster 1:3 (1cement :3coarse sand) & jointed
with white cement slurry.
Providing and laying Ceramic tiles 6mm thick in flooring treads of steps and landing laid on a bed of
10mm thick cement mortar 1:3 (1-cement : 3- coarse sand ) finishing with flush pointing in white cement
Workmanship : The work shall be carried out for skirting as dedo. Before fixing glazed tiles of shade and size as
specified, the surface shall be prepared by heavy scarping, making joints etc. to the required line, level and
plumb. The surface shall be thoroughly wetted before commencing the laying work. Thereafter about 10 mm.
thick backing of cement mortar in specified proportion shall be applied on the surface in true like and level
generally as per specifications of plaster item.
Fixing : The black of each tile to be fixed shall be smeared with cement paste of matching colour and the glazed
tiles shall then be gently tapped against the surface, with a wooden mallet. The skirting shall be done only after
the flooring is competed. Any pipes coming out of the wall through the dedo or skirting shall only beat at the
intersections of the horizontal and vertical joints. The tiles shall not have staggered joints. The joints shall be true
to entire line both ways and vertical joints shall be in line with joints of flooring. Tiles shall be fixed as close as
possible to the adjoining tiles and any difference in the thickness of the glazed tiles shall be evened out in the
cement paste so that all the tiles faces are set in conformly with one another. The skirting shall project uniformly
and not more than 6 mm. thickness beyond the finished surface above. Top of skirting of dedo shall be truly
horizontal. The rises of steps, skirting or dedo shall rest on top of treads of flooring wherever required. The tiles
shall be cut (sawn) and thin edges smoothened before use.
Curing : Curing shall be done for 7 days continuously.
Finishing : Skirting and dedo shall be hand polished to have an even smooth and shining surface. In
case of skirting only 10 mm. x 10 mm. grove shall be provided at the junction of cement plaster and cement
tilesThe white glazed tiles shall be laid on cement mortar bedding of 12 mm thick in C.M. 1 :3 . The mortar shall
have sufficient plasticity for laying and there shall be no hard lumps that would interfere with the evenness of
bedding the base shall be cleared with well wetted. The mortar shall then be spread in thickness not less than
mm at any place and average 12 mm thickness. The proportion of the cement mortar shall be as specified in the
The tiles before laying shall be soaked in water for atleast two hours Neat Gracie cement grout at
Kg/Cement /Sq. mt. Of honey like consistency shall be separated over the mortar bedding as directed. The
edges of the tiles be smeared with neat cement slurry. The tiles shall be well pressed and gently tapped with a
wooden mallet till they are properly bedded and in level with the adjoining tiles. There shall be no hollows in bed
or joints. The joints between the tiles shall be as thin as possible in straight line or as per pattern.
The tiles shall not have staggered joints. The joints shall be true to centre line both ways. The Nehni trap
coming in the flooring shall be so positioned that its grating shall replace only one tile as far as possible. Where
full size tiles cannot be fixed, they shall be cut (swan0 to be required size and the edges rubbed smooth to
ensure straight and true joints. The joints shall be filled with grey cement grout with wire brush of trowel to a
depth of 5 mm. and loose material removed. White cement shall be used for pointing the joints., After fixing the
tile finally in an even the flooring shall be kept wet and allowed to nature undisturbed for 7 days.
The surplus cement grout that may have come out of the joints shall be cleared off before it sets. Once
the floor has set, it shall be carefully washed, cleared by dilute acid and dried. Proper precaution and measures
shall be taken to ensure that the tiles are not damaged inany way till the completion of the construction.
Mode of measurement & payment
The work done shall be measured in sq. mt. For visible area of work done, The length and width of the
flooring shall be measured not between the faces of skirting or dedos or plastered face of wall as the case may
be. The paving under dedo or skirting shall not be measured. No deduction shall be made not extra paid for any
opening in the floor of area upto 0.1 sq. mt. Nothing extra shall be paid for laying the floors at different levels in
the same rooms.
The rate shall be for a unit of one sq. metre.
Providing and laying marble stone slab flooring over 20 mm. (Average) base of cement mortar 1:6 (1
cement: 6 coarse sand) or L.M. 1:1.5 laid and jointed with grey cement slurry including rubbing and
polishing complete: (A) Marble slab 20 mm. thick.
Water shall conform to M-1. Lime mortar shall conform to M-10. Cement mortar shall conform to M-11. Marble
stone slab 20 mm. thick.
Dressing of slab : Every stone shall be cur to required size and fine chisel dressed to give a smooth and even
surface on all sides to the full depth. A straight edge laid along the sides of the stone shall be fully in contact with
it. Chisel dressing shall also be done on top surface to remove any waviness. The sides and top surface to
granite slabs shall be machine polished and molding etc. complete before using. All angles and edges of slabs
shall be true square and free form chippings.
The thickness of stone shall be 18 mm. The allowable tolerance shall be 1 mm. allowable. The tolerance shall be
15 mm. in length and breath.
Bedding : Bedding of granite slabs shall be lime mortar 1:1.5 (1 Lime putty : 1.5 coarse sand) or cement mortar
1:6 (1 cement : 6 coarse sand) of average thickness 20 mm. thick as given in description of item. Minimum
thickness at any place shall not be less than 10 mm.
Laying : The surface of sub grade shall be cleared wetted and mopped. Mortar of specified mix and thickness
shall then be spread on an are sufficient to receive one granite slab, The slab shall be washed clean before
laying. It shall be laid on top pressed and tapped gently to bring it in level with other slabs. It shall then be lifted
and laid a side. The top surface of the mortar shall then be corrected by adding fresh mortar at hollows, or
depressions. The mortar shall then be allowed to harden it over this surface cement slurry of honey like
consistency at 4.4 Kg. Of cement per sq. metre. The edges of slabs already paved shall be buttered with grey
cement. The slab shall then be gently placed in position and tapped with wooden mallet till it is properly bedded
in level with and close to the adjoining slab. The joints shall be as fine as possible : Surplus cement on the
surface of the slabs shall be removed. The slab fixed in the floor adjoining the walls shall enter not less 10 mm.
under the plaster skirting or dado. The junction between the walls and floors shall be finished neatly. The finished
surface shall be true to level and slopes as directed.
Curing : The floor shall be cured for minimum period of seven days.
Mode measurements & payment :
marble stone flooring with various kinds of marble shall measured in sq. metre. The length and breadth shall be
measured between the finished face of skirting or dado or wall plaster. No deduction shall be made not extra
shall be paid for any openings in the floor or area upto 0.05 sq. mt. Nothing extra shall be paid for laying stone at
different levels in the same room. Treads and steps of stairs paved with granite stone slabs shall also be
measured under flooring.
The rate shall be for a unit of one sq. metre.
Providing and laying Vitrified tiles 8 to 10 mm thick , 24'' x 24'' in flooring treads of steps and landing laid
on a bed of 12mm thick cement mortar 1:3 (1- cement : 3-coarse sand ) finishing with flush pointing in
Providing and laying Vitrified tiles 8 to 10mm thick,in skrting risers of steps and dedo on 10mm thick
cement plaster1:3(1-cement:3-coarsesand)and jointed with white cement slurry
Providing and Laying 36" x 36" vitrified 8 mm th.anti skid tiles of "RAK","Bell" or equivalent make as approved by
consultants flooring/skirting over 20 mm thick cement mortar 1:6 (1 cement : 6 coarse sand) on new surface &
jointed with colour cement slurry incl.with flush pointing & cleaning the surface etc.comp
Water shall conform to M-1. Lime mortar shall conform to M-10. Cement mortar shall conform to M-11. vetrified
tiles of 24" x 24" , 8 mm th.anti skid tiles. "RAK","Bell" or equivalent make
Bedding : Bedding of granite slabs shall be lime mortar 1:1.5 (1 Lime putty : 1.5 coarse sand) or cement mortar
1:6 (1 cement : 6 coarse sand) of average thickness 20 mm. thick as given in description of item. Minimum
thickness at any place shall not be less than 10 mm.
Laying : The surface of sub grade shall be cleared wetted and mopped. Mortar of specified mix and thickness
shall then be spread on an are sufficient to receive one granite slab, The slab shall be washed clean before
laying. It shall be laid on top pressed and tapped gently to bring it in level with other slabs. It shall then be lifted
and laid a side. The top surface of the mortar shall then be corrected by adding fresh mortar at hollows, or
depressions. The mortar shall then be allowed to harden it over this surface cement slurry of honey like
consistency at 4.4 Kg. Of cement per sq. metre. The edges of slabs already paved shall be buttered with grey
cement. The slab shall then be gently placed in position and tapped with wooden mallet till it is properly bedded
in level with and close to the adjoining slab. The joints shall be as fine as possible : Surplus cement on the
surface of the slabs shall be removed. The slab fixed in the floor adjoining the walls shall enter not less 10 mm.
under the plaster skirting or dado. The junction between the walls and floors shall be finished neatly. The finished
surface shall be true to level and slopes as directed.
Curing : The floor shall be cured for minimum period of seven days.
Mode measurements & payment :
flooring with various kinds of floors shall measured in sq. metre. The length and breadth shall be measured
between the finished face of skirting or dado or wall plaster. No deduction shall be made not extra shall be paid
for any openings in the floor or area upto 0.05 sq. mt. Nothing extra shall be paid for laying stone at different
levels in the same room. Treads and steps of stairs paved with granite stone slabs shall also be measured under
The rate shall be for a unit of one sq. metre
Providing & Laying 18 mm thick Mirror polish granite flooring for counter , stair -riser , tread , skirting
dedo etc. machine cut or chiselled on bed of cement mortar 1:1 pointing with neat cement slurry incl.
moulding etc. comp. as per instruction of engineer in charge.
Providing & Laying 18 mm thick Mirror polish granite flooring for counter , stair -riser , tread , skirting , dedo etc.
machine cut or chiselled on bed of cement mortar 1:1 pointing with neat cement slurry incl. moulding etc. comp.
as per instruction of engineer in charge.
Mode measurements & payment :
flooring with various kinds of floors shall measured in sq. metre. The length and breadth shall be measured
between the finished face of skirting or dado or wall plaster. No deduction shall be made not extra shall be paid
for any openings in the floor or area upto 0.05 sq. mt. Nothing extra shall be paid for laying stone at different
levels in the same room. Treads and steps of stairs paved with granite stone slabs shall also be measured under
The rate shall be for a unit of one sq. metre
P/F grouting with epoxy branded material filling with groove cutting of 2 to 3 mm in tiles flooring and
cladding work etc. comp. by as per engineer incharg.
The rate shall be for a unit of one sq. metre
Providing and laying broken china mosaic flooring for terrace using 12 mm to 20 mm broken pieces of
glazed tiles to be laid over cement mortar 1:3 to plain or slope and to be tempered to bring mortar creme
out upto surface using white cement including rounding off junctions and extending them upto 15 cm
along the wall,clearing with water and oxalic acid etc. as directed.
Providing and laying China Mosaic finishing over flat or curved surface, including laying to approved patterns,
with precies leveling and setting curvatures with necessary tools and templates, using white/coloured broken
ceramic tile chips, set in pigmented cement mortar 1:4, as directed, finishing in line, level and to required slope,
flushing with appropriate pigimented cement grout, curing and finishing with mild acid wash etc. complete.
(1) China Chips in required colours specially broken from full tiles in required size
(2) Cement (3) Sand (4) White Cement (5) Steiner
Before laying a final layer of China Chips prepare the surface to the required slope and level with a
backing coat in C.M (1:3). While laying a backing coat, spread a layer of thick cement slurry and scrub the same
vigorously to seal all pores in concrete below.
For the required designs prepare templates for different patterns from steel flats or plywood and mark out total
design on the designated area. Estimate the quantity of Chips of different colous and ensure its uninterrupted
supply before starting the work. Lay the chips flat on the bedding coat and fix tightly be light hammering. Remove
grey cement from the joints by scrapping before final set of cement.
Finish the joints neatly with white cement and harmonious colour Steiner. All design and pattern shall be finished
with first class workmanship. The surface should finally cleaned, given a mild acid wash for gain the luster of
Cost of China Chips, White cement, OPC, Sand, Steiner and all labour for leveling, laying by specialist artisan,
preparing templates, testing etc are included.
MODE OF MEASUREMENT :
Dimensions of total finished area as laid are recorded and area is computed in sq.m., rounded to two places of
Providing 10mm thick cement plaster in single coat on brick/concrete walls for interior plastering upto
floor two level and finished even and smooth in (i)Cement mortar 1:3 (1-cement:3-sand)
Providing 15mm thick cement plaster in single coat on Rough (Similar)side of single or half brick walls
for interior plastering upto floor two level and finished even and smooth in (i) Cement mortar 1:3 (1-
cement:3-sand) and smooth / Mala Plaster/ neat cement slurry in C.M.1:3
Water M-1. The Cement mortar of proportion 1:3 shall conform to M-13.
Scaffolding : Wooden ballies, bamboos, planks, treatles and other scaffolding shall be sound. These shall be
properly examined before erection and use Stage scaffolding shall be provided for ceiling plaster, which shall be
independent of the walls.
Preparation of back-ground :
The surface shall be cleaned of all dust, loose mortar droppings, traces of algae, afflorescence and other foreign
matter by water or by brushing. Smooth surface shall be roughened by wire brushing if it is not hard and by
racking if it is hard. In case of concrete surface, if a chemical retarder has been applied to the form work, the
surface shall be roughened by wire brushing and all the resulting dust and loose particles cleaned off and care
shall be taken that none of the retarder is left on the surface. Trimming of projections on brick/concrete surface
where necessary shall be carried out to get an even surface.
Raking of joints in case of masonry where necessary shall be allowed to dry out for sufficient period
before carrying out the plaster work.
The work shall not be soaked but only damped evenly before applying the plaster. If the surface
becomes dry such area shall be moistened again.
For external plaster, the plastering operation shall be started from top floor and carried downwards. For
internal plaster, the plastering operations may be started wherever the building frame and cladding work are
ready and the temporary supporting ceiling resting on the wall of the floor have been removed, Ceiling plaster
shall be completed before starting plaster to walls.
Applications of Plaster :
The plaster about 15 x 15 cms. Shall be first applied horizontally and vertically at not more than 2 metre intervals
over the entire surface to serve as gauge. The surfaces of these gauges shall be truly inplane of the finished
plastered surface. The mortar shall then be applied in uniform surface slightly more than the specified thickness,
then brought to a true surface by working a wooden straight edge reaching across the gauges with small upward
and sideways movement at a time. Finally, the surface shall be finished off true with a trowel or wooden float
according as a smooth or a sandy granular texture is required. Excessive trowelling or overworking the float shall
be avoided. All corners, arrises, angles and junctions be truly vertical or horizontal as the case may be and shall
be carefully finished. Rounding or chamfering corners, arrises junctions etc. shall be carried out with proper
templates to the size required.
Cement plaster shall be used within half an hour after addition of water. Any mortar or plaster which is partially
set shall be rejected and removed forthwith from the site :
In suspending the work at the end of the day, the plaster shall be left out clean to the line both horizontally and
vertically. When recommending the plaster, the edges of the old work shall be scraped clean and wetted with
cement putty before plaster is applied to the adjacent area to enable the two to properly joint together. Plastering
work shall be closed at the end of the day on the body of the wall and nearer than 15 cm. To any corners or
arrises. Horizontal joints in plasterwork shall not also occur on parapet tops and copings as these invariably lead
to leakage. No portion of the surface shall be left out initially to be packed up later on.
Each coat shall be kept dam continuously till the next coat is applied or for a minimum period of 7 days.
Moistening shall commence as soon as plaster is hardened sufficiently. Soaking of walls shall be avoided and
only as much water as can be readily absorbed shall be used excessive evaporation on the sunny or windward
side of building in hot air or dry weather shall be prevented by handling mattings or gunny bags on the outside of
the plaster and keeping them wet.
Mode of measurement & payment :
The rate shall include the cost of all materials, labour and scaffolding etc, involved in the operations described
under workmanship.
All plastering shall be measured in square metres unless, otherwise specified length, breadth or height shall be
measured correct to a centimeter.
Thickness of the plaster shall be exclusive of the thickness of the key i.e. grooves or open joints in brick
work, stone work etc. or space between laths. Thickness of plaster shall be average thickness with minimum
mm. at any point on this surface.
This item includes plastering upto floor two level.
The measurement of wall plastering shall be taken between the walls or partition (dimensions before plastering
being taken) for length and from the top of floor or skirting to ceiling for height. Depth of cover of cornices if any
shall be deducted.
Soffits of stairs shall be measured as plastering on ceilings, Flowing soffits shall be measured separately.
For jambs, soffits, sills etc. for openings not exceeding 0.5 sq. mt. each in area for ends of joints, beams,
posts, girders, steps etc. not exceeding 0.5 sq. mt. each in area and for openings exceeding 0.5 sq.mt. and not
exceeding 3.0 sq. mt. in each area deductions and additions shall be made in the following manner :
(a) No deductions shall be made for ends joints, beams posts etc. and openings not exceeding 0.5 sq. mt. each and
no addition shall be made for reveals, jambs, soffits, sills etc. of these opening for finish to plaster around ends
of joints, beams, posts etc.
(b) Deduction for openings exceeding 0.5 sq. mt. but not exceeding 3 sq. mt. each shall be made as follows and no
addition shall be made for reveals, jambs, soffits etc. sills etc. of these openings.
When both faces of all wall are plastered with same plaster, deduction shall be made for one face only.
(i) When two faces of wall are plastered with different types of plasters or if one faces is
plastered and the other pointed, deductions shall be made from the plaster or pointing on the side of frame for
door, window etc. on which width or reveals is less than that on the other side but no deductions shall be made
on the other side. Where width of reveals on both faces of all are equal, deductions of 50% of area of opening on
each face shall be made from area of plaster and/or pointing as the case may be.
For openings having door frames equal to projecting beyond the thickness of wall, full deduction for opening shall
be made from each plastered face of the wall.
In case of openings of area above 3 sq. mt. each, deduction shall be made for opening but jambs, soffits and sills
shall be measured.
The rate shall be for a unit of one sq. metre.
finishing with a floating coat of net cement slurry.
Materials & Workmanship :
This work is only of providing smooth cement finish with floating coat of neat cement slurry.
The coat of cement and fine sand mortar of proportion 1:1 (1.5 mm. thick about) shall be applied to the plastered
surface with a trowel to provide uniform texture while the base coast is still plastic.
In any continuous face of wall the finishing treatment should be carried out continuously and day to day braked
made to coincide with architectural breaks in order to avoid unsightly junctions.
Curing : All the plaster work shall be kept damp continuously for a period of 7 days.
Mode of measurements & payment :
The payment shall be made for a unit of 1.0 sq. mt. of work done over and above the finishing of work of base
The relevant specifications of item of base coat shall be followed for measurements and payment.
The rate shall be for a unit of one sq. metre.
Providing & Fixing 15 Cm Wide Chicken Mesh Jali With Nails & Then Application Of 15 Mm Plaster On
R.C.C.& Masonary Joints As Per Dir.Of Engg.In Charge
Mode of measurement
The rate shall be for a unit of one number basis.
20mm thick sand faced cement plaster on walls upto height 10 metres above ground level consisting of
12mm thick backing coat of C.M. 1:3 (1-cement : 3-sand) and 8mm thick finishingcoat of C.M. 1:1 (1-
cement : 1-sand) etc. complete.
Providing & laying Stone chips Plaster with / without grooves for making panels incl. backing coat of
plaster in C.M. (1:3) in grey cement as per dir. Of consultants.
Water shall conform to M-12. Cement mortar shall conform to M-11.
The work shall be carried out in the coats. The backing coat (base coat) shall be 12 mm. thick in C.M. 1:3.
Scaffolding : Wooden ballies, bamboos, planks, treatles and other scaffolding shall be sound. These shall be
properly examined before erection and use Stage scaffolding shall be provided for ceiling plaster, which shall be
independent of the walls.
Preparation of back-ground :
The surface shall be cleaned of all dust, loose mortar droppings, traces of algae,afflorescence and other
foreign matter by water or by brushing. Smooth surface shall be roughened by wire brushing if it is not hard and
by racking if it is hard. In case of concrete surface, if a chemical retarder has been applied to the form work, the
surface shall be roughened by wire brushing and all the resulting dust and loose particles cleaned off and care
shall be taken that none of the retarder is left on the surface. Trimming of projections on brick/concrete surface
where necessary shall be carried out to get an even surface.
Raking of joints in case of masonry where necessary shall be allowed to dry out for sufficient period
before carrying out the plaster work.
The work shall not be soaked but only damped evenly before applying the plaster. If the surface
becomes dry such area shall be moistened again.
For external plaster, the plastering operation shall be started from top floor and carried downwards. For
internal plaster, the plastering operations may be started wherever the building frame and cladding work are
ready and the temporary supporting ceiling resting on the wall of the floor have been removed, Ceiling plaster
shall be completed before starting plaster to walls.
Applications of Plaster :
The plaster about 15 x 15 cms. Shall be first applied horizontally and vertically at not more than 2 metre
intervals over the entire surface to serve as gauge. The surfaces of these gauges shall be truly inplane of the
finished plastered surface. The mortar shall then be applied in uniform surface slightly more than the specified
thickness, then brought to a true surface by working a wooden straight edge reaching across the gauges with
small upward and sideways movement at a time. Finally, the surface shall be finished off true with a trowel or
wooden float according as a smooth or a sandy granular texture is required. Excessive trowelling or overworking
the float shall be avoided. All corners, arrises, angles and junctions be truly vertical or horizontal as the case may
be and shall be carefully finished. Rounding or chamfering corners, arrises junctions etc. shall be carried out with
proper templates to the size required.
Cement plaster shall be used within half an hour after addition of water. Any mortar or plaster which is
partially set shall be rejected and removed forthwith from the site :
In suspending the work at the end of the day, the plaster shall be left out clean to the line both
horizontally and vertically. When recommending the plaster, the edges of the old work shall be scraped clean and
wetted with cement putty before plaster is applied to the adjacent area to enable the two to properly joint
together. Plastering work shall be closed at the end of the day on the body of the wall and nearer than 15 cm. To
any corners or arrises. Horizontal joints in plasterwork shall not also occur on parapet tops and copings as these
invariably lead to leakage. No portion of the surface shall be left out initially to be packed up later on.
Each coat shall be kept dam continuously till the next coat is applied or for a minimum period of 7 days.
Moistening shall commence as soon as plaster is hardened sufficiently. Soaking of walls shall be avoided and
only as much water as can be readily absorbed shall be used excessive evaporation on the sunny or windward
side of building in hot air or dry weather shall be prevented by handling mattings or gunny bags on the outside of
the plaster and keeping them wet.
The subsequent coat shall be applied after this coat has been allowed to set for 3 to 5 days depending
upto the weather conditions. The surface shall not be allowed to dry during this period.
The second coat shall be completed to 8 mm. thickness in C.M. 1:1 as described above, including raising
sand facing by bushing. The sample of sand face shall be got approved before the work is started. The whole
work shall be carried out uniformly as per sample approved.
Curing : The curing shall be started overnight after finishing of plaster. The plaster shall be kept for a period of
days. During this period, it shall be protected from all damages.
Mode measurements & payment :
The rate shall include the cost of all materials, labour and scaffolding etc, involved in the operations
described under workmanship.
All plastering shall be measured in square metres unless, otherwise specified length, breadth or height
shall be measured correct to a centimeter.
Thickness of the plaster shall be exclusive of the thickness of the key i.e. grooves or open joints in brick
work, stone work etc. or space between laths. Thickness of plaster shall be average thickness with minimum
mm. at any point on this surface.
This item includes plastering upto floor two level.
The measurement of wall plastering shall be taken between the walls or partition (dimensions before
plastering being taken) for length and from the top of floor or skirting to ceiling for height. Depth of cover of
cornices if any shall be deducted.
Soffits of stairs shall be measured as plastering on ceilings, Flowing soffits shall be measured separately.
For jambs, soffits, sills etc. for openings not exceeding 0.5 sq. mt. each in area for ends of joints, beams,
posts, girders, steps etc. not exceeding 0.5 sq. mt. each in area and for openings exceeding 0.5 sq.mt. and not
exceeding 3.0 sq. mt. in each area deductions and additions shall be made in the following manner :
(c) No deductions shall be made for ends joints, beams posts etc. and openings not exceeding 0.5 sq. mt.
each and no addition shall be made for reveals, jambs, soffits, sills etc. of these opening for finish to
plaster around ends of joints, beams, posts etc.
(d) Deduction for openings exceeding 0.5 sq. mt. but not exceeding 3 sq. mt. each shall be made as follows
and no addition shall be made for reveals, jambs, soffits etc. sills etc. of these openings.
(ii) When both faces of all wall are plastered with same plaster, deduction shall be made for one face only.
(iii) When two faces of wall are plastered with different types of plasters or if one faces is plastered and the
other pointed, deductions shall be made from the plaster or pointing on the side of frame for door,
window etc. on which width or reveals is less than that on the other side but no deductions shall be made
on the other side. Where width of reveals on both faces of all are equal, deductions of 50% of area of
opening on each face shall be made from area of plaster and/or pointing as the case may be.
For openings having door frames equal to projecting beyond the thickness of wall, full deduction for opening shall
be made from each plastered face of the wall.
In case of openings of area above 3 sq. mt. each, deduction shall be made for opening but jambs, soffits and sills
shall be measured.
The rate shall be for a unit of one sq. metre.
Providing and fixing sheet glass, selected quality (Type-C) bedded in putty and fixed with wooden
beading including the cost of wooden beadings of first class teakwood and necessary cutting of glass.
(1) 5 mm thick.
Materials: The glass shall conform to M-18. The wood beading shall conform to M-29. Putty shall conform to I. S.
2.0 Workmanship:
2.1 Size of glass for glazing shall allow a clearness of 2.5 mm between the edges of glass and the wood or
metal surrounds. The clearness may be increased, provided the depth of the rebate of groove is
sufficient to provide not less than 1.5 cm. Cover to the glass. The detailed process or glazing shall be as
specified in I. S. 3548-1966
2.2 All stains from the surface of glass shall be removed and cleaned with thinner or spirit without any extra
2.3 Wooden beading:
2.3.1 The size of the wood beads for glass panes shall be 1.5 cms x 3 cms unless otherwise specified. Bead
shall be secured to wooden frames with either panels pains or screws and to metal frames in the way
provided for in the frame.
2.3.2 Sufficient putty compound shall be applied to the rebate so that when the glass has been pressed into
the rebate, a bed of compound not less that 1.5 mm thick will remain between the glass and the rebate.
There should also be surplus of compound squeezed out above the rebate, which should be stripped aqt,
an angle not undercut to prevent water accumulating. Beads should be bedded with compound against
the glass and wood beads should also be bedded against the rebate.
Care should be taken to see that no voids are left between the glass and the bead.
3.0 Mode of measurements and payment:
3.1 All measurements of cutting shall, unless otherwise stated, be held to include the consequent waste.
3.2 Each pane of glass shall be measured to the nearest 0.5 cms both in width and height/length.
3.3 Irregular shaped or circular panes shall be measured as the smallest rectangular area from which the
irregular or circular pane can be cut.
3.4 The rate includes cost of materials labour, required for complete of the item including hoisting, carriage,
temporary erections like scaffolding etc.
3.5 The rate also includes:
(i) The wastages and breakage involved in the process
(ii) Straight cutting on glass and glazing putty, teak wood beading glass, pins, etc. complete
The rate shall be for a unit of sq. meter.
Providing and fixing suncontrol film of approved shade and quality. Approved brand Garware and
Providing and fixing Lock at drawer of counter type Table including fixing any one of the materials like
wooden patti, favicol, khilli, screws, nut-bolts, clamping, or any kind of other similar required work as
directed by engineer incharge etc. comp.
White washing with lime on wall surface (two coats ) over and including a primary coat of white washing
to give an even shade after through brooming the surface to remove all dirt, dust, mortar drops and other
foreigh matter.
Mode of measurement
The rate shall be for a unit of Smt basis.
Item No. : 50 (a)
Extra over above item for every subsequent coat of colour wash with lime on wall surface
Mode of measurement
The rate shall be for a unit of one Smt basis.
Colour washing with lime on wall surface (two coats ) over and including a primary coat of white
washing to give an even shade after through brooming the surface to remove all dirt, dust, mortar drops
and other foreigh matter.
Mode of measurement
The rate shall be for a unit of Smt basis.
Item No. : 51 (a)
Extra over above item for every subsequent coat of colour wash with lime on wall surface
Mode of measurement
The rate shall be for a unit of one Smt basis.
Removing dry or oil bound distemper by a washing and scraping and sand papering the wall surface
smooth including necessary repairs to scratches complete.
1.0 Materials & Workmanship :
1.1 All loose pieces and scales shall be removed by sand papering and surface shall be cleared of all
greasy, dust, dirt, etc. on decorated wall surface. Where heavy scaling has taken place the entire surface
shall be scrapped by means of steel scrappers so as to remove all accumulated distemper, leaving clean
surfaces. Necessary repairs to the scratches shall be made as directed.
2.0 Mode of measurements & payment :
The rate shall be for a unit of one sq. metre.
Extra over item for removing dry oil bound distemper on ceilings and sloping roofs.
3.0 Materials & Workmanship :
1.1 All loose pieces and scales shall be removed by sand papering and surface shall be cleared of all
greasy, dust, dirt, etc. on decorated wall surface. Where heavy scaling has taken place the entire surface
shall be scrapped by means of steel scrappers so as to remove all accumulated distemper, leaving clean
surfaces. Necessary repairs to the scratches shall be made as directed.
4.0 Mode of measurements & payment :
The rate shall be for a unit of one sq. metre.
Distempeing (Two coats) with oil bound distemper of approved brand and manufacture and of required
shade on wall surfaces to give an even shade, over and including a priming coat with distemper primer of
approved brand and manufacture after thoroughly brushing the surface free from mortar dropping and
other foreign matter and also including preparing the surface even and sand papered smooth.
1.0 Materials :
1.1 Oil bound washable distemper and primer shall be of approved brand and manufacture. The distemper
shall be of required colour and shade and the same shall conform to I.S. 428-1969.
2.0 Workmanship :
2.1 Scaffolding : Where scaffolding is required, it shall be erected in such a way that as far as possible no
part of scaffolding shall rest against the surface to be distempered. A properly secured strong and well
tied suspended platform (Jools) may be used for distempering. Where ladders are used, pieces of old
gunny bags shall be tied at top and bottom to prevent scratches to the walls and floors. For distempering
to ceiling, proper stage scaffolding shall be erected where necessary.
2.2 Preparation of surface :
2.2.1 The undecorated surface to be distempered shall be thoroughly brushed off from dust, dirt, grease,
mortar dropping and other foreign matter and sand papered smooth. New plaster surface shall be
allowed to dry for atleast 2 months before applications of distemper.
2.2.2 All unnecessary nails shall be removed. pitting in plaster shall be made good with plaster of paris mixed
with dry distemper of colour to be used. The surface shall then be rubbed down again with a fine grade
sand paper and made smooth. A coat of distemper shall be applied over the patches. The surface shall
be allowed to dry thoroughly before the regular coat of distemper is allowed. The surface affected by
moulds, moss, fungi algae lichens, efflorescence etc. shall be treated in accordance with I. S.
(Part-I) 1966. Before applying distempering, any unevenness shall be made good by applying putty made
of plaster of paris mixed with water on entire surface including filling up the undulation and then sand
papering the same after it is dry.
2.3 Priming coat :
2.3.1 A priming coat or distemper prime of approved manufacture and shade shall be applied over the papered
surface in case of new work on undecorated surface. If the distemper priming is done after the wall
surface dries completely, the distemper primer shall be applied.
2.3.2 Application of Primer shall be done as under :
The primer shall be applied with a brush on the clean dry and smooth surface. Horizontal strokes shall be
given first and vertical strokes shall be applied immediately afterwards. This entire operation will
constitute one coat. The surface shall be finished as uniformly as possible leaving no brush marks. It
shall be allowed to dry for atleast 48 hours before oil bound distemper or Paint is applied.
2.3.3 Oil bound distemper is not recommended to be applied within six months of the completion of wall
2.4 Preparation of oil bound distemper :
2.4.1 The distemper shall be diluted with water or any other prescribed thinner in a manner recommended by
the manner recommended by the manufacture only. Sufficient quantity of distemper required for a day's
work shall be prepared.
2.5 Application of Distemper coat :
2.5.1 For undecorated surfaces, after the primer coat is dried for atleast 48 hours, the surface shall be lightly
sand papered to make it smooth for receiving the distemper, taking care not to rub out the priming coat.
All loose particles shall be dusted off after rubbing. Minimum two coats of distemper shall be applied with
brushes in horizontal strokes followed immediately by vertical strokes which together shall constitute one
coat. The subsequent coats shall be applied after a time interval of atleast 24 hours between consecutive
coats to permit proper drying of the preceding coat. The finished surface shall be even and uniform
without patches, brush marks, distemper drops etc.
2.5.2 sufficient quantity of distemper shall be mixed to finish one room at a time. The application of a coat in
each room shall be finished in one operation and no work shall be started in any room which cannot be
completed on the same day.
2.5.3 15 cm. double bristled distemper brush shall be used. After day's work brushes shall be thoroughly
washed in hot water soap solution and hung down to dry. Old brushes which are dirty and caked with
distemper shall not be used on the work.
2.6 Protective measurements : The surfaces of doors, windows, floors, articles of furniture etc. and such
other parts of the buildings as are not to be distempered shall be protected from being splashed upon.
Such surfaces shall be cleaned of distemper splashes if any.
3.0 Mode of measurements & payment :
3.1 Priming coat of distemper primer, scraping of surface spoiled by stunk soots removal of oil and grease
spots, treatment for infection of effloresces mould moss, fungi, algae and litchen and patch repairs to
plaster shall be included in this item for which nothing extra shall be paid.
3.2 All the work shall be measured net in the decimal system as in place subject tot he following limits unless
otherwise stated hereinafter :
(a) Dimensions shall be measured to the nearest 0.01 m.
(b) Area in individual items shall be worked out to the nearest 0.01 sq. m. all work shall be measured in sq.
metre. No deductions shall be made for ends of joints, beams, posts etc., and openings, not exceeding
0.5 sq.m. each and no addition shall be made for reveals, jambs, soffits, sills etc. of these openings nor
for finish around ends of joints, beams, posts etc.
3.3 Deductions of opening exceeding 0.5 sq.m. but not exceeding 3 m. in each shall be made as follows and
net addition shall be made for reveals, jambs, soffits etc. of these openings :
(a) When both the faces of walls are provided with same finish : deductions shall be made or one face only.
(b) When each face of wall is provided with different finish, deduction shall be made for that side of frame for
doors, windows etc. on which width of reveal is less than that of the other side but no deduction shall be
made on the other side. Where the width of reveals on the both the faces of wall are equal, deduction of
50% of area of opening of each face shall be made from area of finish.
(c) When only one face of wall is treated and the other face is not treated, full deduction shall be made if the
width of the reveal on treated side is less than that on untreated sides but if the width of the reveal is
equal or more than that on untreated side neither deductions not addition to be made for reveals, jambs,
soffits, sills etc.
3.4 In case opening of area exceeding 3 sq. m. each, deduction shall be made for openings but jambs, sills
and soffits shall be measured.
3.5 No deductions shall be made for attachments such as casings, conduits, pipes, electric wiring and the
3.6 Item includes removing nails, making good holes, cracks, patches with material similar in composition of
3.7 The rate includes cost of all materials, labour, scaffolding, protective measures etc. involved in all the
operations described above. This shall also include conveyance, delivery, handling, unloading, storing
The rate shall be for a unit of one sq. metre.
Item No. : 55-56
Extra over Item 44,45 for distempering with oil bound washable distemper on celling and sloping
4.0 Materials :
1.1 Oil bound washable distemper and primer shall be of approved brand and manufacture. The distemper
shall be of required colour and shade and the same shall conform to I.S. 428-1969.
5.0 Workmanship :
5.1 Scaffolding : Where scaffolding is required, it shall be erected in such a way that as far as possible no
part of scaffolding shall rest against the surface to be distempered. A properly secured strong and well
tied suspended platform (Jools) may be used for distempering. Where ladders are used, pieces of old
gunny bags shall be tied at top and bottom to prevent scratches to the walls and floors. For distempering
to ceiling, proper stage scaffolding shall be erected where necessary.
5.2 Preparation of surface :
5.2.1 The undecorated surface to be distempered shall be thoroughly brushed off from dust, dirt, grease,
mortar dropping and other foreign matter and sand papered smooth. New plaster surface shall be
allowed to dry for atleast 2 months before applications of distemper.
5.2.2 All unnecessary nails shall be removed. pitting in plaster shall be made good with plaster of paris mixed
with dry distemper of colour to be used. The surface shall then be rubbed down again with a fine grade
sand paper and made smooth. A coat of distemper shall be applied over the patches. The surface shall
be allowed to dry thoroughly before the regular coat of distemper is allowed. The surface affected by
moulds, moss, fungi algae lichens, efflorescence etc. shall be treated in accordance with I. S.
(Part-I) 1966. Before applying distempering, any unevenness shall be made good by applying putty made
of plaster of paris mixed with water on entire surface including filling up the undulation and then sand
papering the same after it is dry.
5.3 Priming coat :
5.3.1 A priming coat or distemper prime of approved manufacture and shade shall be applied over the papered
surface in case of new work on undecorated surface. If the distemper priming is done after the wall
surface dries completely, the distemper primer shall be applied.
5.3.2 Application of Primer shall be done as under :
The primer shall be applied with a brush on the clean dry and smooth surface. Horizontal strokes shall be
given first and vertical strokes shall be applied immediately afterwards. This entire operation will
constitute one coat. The surface shall be finished as uniformly as possible leaving no brush marks. It
shall be allowed to dry for atleast 48 hours before oil bound distemper or Paint is applied.
5.3.3 Oil bound distemper is not recommended to be applied within six months of the completion of wall
5.4 Preparation of oil bound distemper :
2.4.1 The distemper shall be diluted with water or any other prescribed thinner in a manner recommended by
the manner recommended by the manufacture only. Sufficient quantity of distemper required for a day's
work shall be prepared.
2.5 Application of Distemper coat :
2.6.1 For undecorated surfaces, after the primer coat is dried for atleast 48 hours, the surface shall be lightly
sand papered to make it smooth for receiving the distemper, taking care not to rub out the priming coat.
All loose particles shall be dusted off after rubbing. Minimum two coats of distemper shall be applied with
brushes in horizontal strokes followed immediately by vertical strokes which together shall constitute one
coat. The subsequent coats shall be applied after a time interval of atleast 24 hours between consecutive
coats to permit proper drying of the preceding coat. The finished surface shall be even and uniform
without patches, brush marks, distemper drops etc.
2.6.2 sufficient quantity of distemper shall be mixed to finish one room at a time. The application of a coat in
each room shall be finished in one operation and no work shall be started in any room which cannot be
completed on the same day.
2.6.3 15 cm. double bristled distemper brush shall be used. After day's work brushes shall be thoroughly
washed in hot water soap solution and hung down to dry. Old brushes which are dirty and caked with
distemper shall not be used on the work.
2.7 Protective measurements : The surfaces of doors, windows, floors, articles of furniture etc. and such
other parts of the buildings as are not to be distempered shall be protected from being splashed upon.
Such surfaces shall be cleaned of distemper splashes if any.
6.0 Mode of measurements & payment :
6.1 Priming coat of distemper primer, scraping of surface spoiled by stunk soots removal of oil and grease
spots, treatment for infection of effloresces mould moss, fungi, algae and litchen and patch repairs to
plaster shall be included in this item for which nothing extra shall be paid.
6.2 All the work shall be measured net in the decimal system as in place subject tot he following limits unless
otherwise stated hereinafter :
(c) Dimensions shall be measured to the nearest 0.01 m.
(d) Area in individual items shall be worked out to the nearest 0.01 sq. m. all work shall be measured in sq.
metre. No deductions shall be made for ends of joints, beams, posts etc., and openings, not exceeding
0.5 sq.m. each and no addition shall be made for reveals, jambs, soffits, sills etc. of these openings nor
for finish around ends of joints, beams, posts etc.
6.3 Deductions of opening exceeding 0.5 sq.m. but not exceeding 3 m. in each shall be made as follows and
net addition shall be made for reveals, jambs, soffits etc. of these openings :
(d) When both the faces of walls are provided with same finish : deductions shall be made or one face only.
(e) When each face of wall is provided with different finish, deduction shall be made for that side of frame for
doors, windows etc. on which width of reveal is less than that of the other side but no deduction shall be
made on the other side. Where the width of reveals on the both the faces of wall are equal, deduction of
50% of area of opening of each face shall be made from area of finish.
(f) When only one face of wall is treated and the other face is not treated, full deduction shall be made if the
width of the reveal on treated side is less than that on untreated sides but if the width of the reveal is
equal or more than that on untreated side neither deductions not addition to be made for reveals, jambs,
soffits, sills etc.
6.4 In case opening of area exceeding 3 sq. m. each, deduction shall be made for openings but jambs, sills
and soffits shall be measured.
6.5 No deductions shall be made for attachments such as casings, conduits, pipes, electric wiring and the
6.6 Item includes removing nails, making good holes, cracks, patches with material similar in composition of
6.7 The rate includes cost of all materials, labour, scaffolding, protective measures etc. involved in all the
operations described above. This shall also include conveyance, delivery, handling, unloading, storing
The rate shall be for a unit of one sq. metre
Wall painting (two coats) with plastic emulsion paint of approved brand and manufacture on undecorated
wall surface to give an even shade including throughly brushing the surface free from mortar droppings
and other foreign matter and sand papered smooth.
1.0 Materials : Water shall be conform to M-1. The plastic emulsion shall conform to I.S. 5411-1969 (part-I)
2.0 Workmanship :
2.1 Scaffolding : The relevant specifications of item No. 18.11 para 2.1. shall be followed.
2.2 Preparation of Surface : The relevant specifications of item No. 18.44 para 2.2 shall be followed.
2.3 Preparation of Mix : This shall be done as per manufacturers instructions. The thinning of emulsion is to
be done with water and not with turpentine. The quantity of thinner to be added shall be as per
manufacturer instructions.
2.4 Applications :
2.4.1 Before pouring into small containers for use, the paint shall be stirred thoroughly in its container. When
applying also, the paint shall be continuously stirred in the smaller container, so that its consistency is
2.4.2 The paint shall be laid on evenly and smoothly by meant of crossing and laying off the crossing and
laying off consist of covering the area over with paint, brushing the surface hard for the first time over
and then brushing alternately in opposite direction two or three times and then finally brushing lightly in a
direction at right angles to the same. In this process, no brush marks shall be left after the laying off is
finished. No hair marks from the brush or clogging of paint puddles in the corners of panels, angles of
mouldings, etc. shall be left on the work. The full process of crossing and laying off will constitute one
2.4.3 The paint shall be applied with brush or rollers. For undecorated surfaces, the surface shall be treated
with minimum two coats of cement water proofing paint. The second or subsequent coat shall not be
started until the preceding coat has become sufficiently hard to resist marking by brush being used.
2.4.4 The surface on finishing shall present a flat velvety smooth finish. It shall be even and uniform in shade
without patches, brush marks, paint drops etc.
2.5 Precautions :
(a) Old brushes if they are to be used with emulsion paints, shall be completely dried of turpentine oil paint
by washing in warm soap water.
Brushes shall be quickly washed in water immediately after use and kept immersed in water during break
periods to prevent the paint from hardening on the brush.
(b) In the preparation of wall for plastic emulsion painting, no oil base putties shall be used in filling cracks,
(c) Splashes on floors etc. shall be cleaned out without delay as they will be difficult to remove after
(d) Washing of surfaces treated with emulsion paint shall not be done within 3 to 4 weeks of application.
2.6 Protective measures :
2.1.1 The relevant specifications of item No. 18.17 para 2.3 shall be followed.
3.0 Mode of measurements & payment :
3.1 The relevant specifications of item No. 18.11 shall be followed.
The rate shall be for a unit of one sq. metre.
Extra over item 57 for every subsequent coat of wall painting with plastic emulsion pain of
approved brand.
Mode of measurement
The rate shall be for a unit of one number basis.
Extra over item 57 for painting with plastic emulsion paint of approved brand on ceilings and sloping
Mode of measurement
The rate shall be for a unit of one number basis.
Applying two coats of Birla (white cement based) or Asian (acrylic lapy- putty) or equivalent & two coats
of primer of approved brand and manufacture on new wall surface to give an even shade including
thoroughly brushing the surface free from mortar dropping and other foreign matter and sand papered
Mode of measurement
The rate shall be for a unit of one number basis.
Finishing wall with weather proof exterior emulsion paint on wall surface (two coats) to give an required
shape even shade after thoroughly brushing the surface to remove all dirt, and remains of loose
powdered materials.etc complete
1.0 Materials :
1.1 The water shall conform to M-1. Premium Acrylic Exterior Paint (Apex) shall conform to relevant I.S.
2.0 Workmanship :
2.2 Scaffolding: Wherever scaffolding is necessary it shall be erected in such a way that as far as possible
on part of scaffolding shall rest against the surface to be white or coloured washed. A properly secured
strong and well tied suspended platform (Zoola) may be used for Premium Acrylic Exterior Paint (Apex).
Where ladders are sued, pieces of old gunny bags shall be tied at top and bottom to prevent scratches to
the floors and walls. For white washing of ceilings proper stage scaffolding shall be erected where
18.11 Premium Acrylic Exterior Paint (Apex) on undecorated wall surfaces (two coats) to give an even
shade including thoroughly brooming the surface to remove all dirt, dust mortar drops and other
foreign matter.
2.2 Preparation of surface :
2.2.1 The surface shall be thoroughly cleaned of all dust, dirt, mortar cropping and other foreign matters before
white wash is to be applied.
2.2.2 The surface spoiled by smoke soot shall be scraped with steel wire brushes or steel scrappers or shall be
rubbed with over burnt surkhi or brick bats. The surface shall be then broomed to remove all dust, dirt
and shall be washed with clean water.
2.2.3 Oil or grease spots shall be removed by suitable chemical and smooth surface shall be rubbed wire
2.2.4 All unsound portion of the surface plaster shall be removed to full depth of plaster in rectangular patches
and plastered again after raking the masonry joints properly. Such portion shall be wetted and allowed to
dry. They shall then be given one coat of white wash.
2.2.5 All unnecessary nails shall be removed, the holes cracks patches etc. shall be made good with materials
similar in composition to the surface to be prepared.
3.0 Application of Paint :
3.1.1 No painting shall be done when the paint is likely to be exposed to a temperature of below 7°C within
hours after application.
3.1.2 When weather conditions are such as to cause damage the work shall be carried out "in the shadow" as
far as possible. This helps the proper hardening of the paint film by keeping the surface moist for a longer
3.1.3 To maintain the uniform mixture and to prevent segregation, the paint shall be stirred frequently in the
3.1.4 For undercoated surfaces, the surfaces shall be treated with minimum two coats of water proof cement
paint. Not less than 24 hours shall be allowed between two coats. Next coat shall not be started until the
preceding coat has become sufficiently hard to resist marking by the brush being used. In hot dry
weather, the preceding coat shall be allowed between two coats. Next coat shall not be started until the
preceding coat has become sufficiently hard to resist marking by the brush being used. In hot dry
weather, the preceding coat shall be slightly moistened before applying the subsequent coat.
3.1.5 The finished surface shall be even and uniform in shade, without patches, brush masks, paint drops etc.
3.1.6 The cement paint shall be applied with a brush with relatively short stiff hog or fibre bristles. The paint
shall be brushed in uniform thickness and shall be free from excessive heavy brush marks. The lamps
shall be well brushed out.
3.1.7 Water proof cement paint shall not be applied on surfaces already treated with white wash colour wash,
distemper dry or oil bound varnishes, paint etc. It shall not be applied on gypsum, wood and metal
3.2 Curing : Painted surfaces shall be sprinkled with water two or three times a day.
3.3 This shall be done between coats and for atleast two days following the final coat. The curing shall be
started as soon as the paint has hardened so as not to be damaged by the sprinkling of water say about
hours after the application.
3.4 Protection measures shall be taken as per item No. 18.11 para 2.6.
4.00 Mode of measurements & payment :
4.1 All the work shall be measured in the decimal system as under :
(a) Dimensions shall be measured to the nearest 0.01 M.
(b) Area in individual items shall be worked out to the nearest 0.01 Sq. M.
All the work shall be measured in sq. mt. Deductions for jambs, soffits, stills etc. for opening not exceeding
0.5 sq. mt. each in area for ends of joints, posts, beams, girders, steps etc. not exceeding 0.5 sq. mt.
each in area and for opening exceeding 0.3 sq. mt. and not exceeding 3.0 sq. mt. each in area
deductions and additions shall be made as under :
4.2.1 No deductions shall be made for ends of joints beams, posts etc. and openings not exceeding 0.5 sq. mt.
each. No addition shall be made for reveals, jambs, soffits, sills etc. of these openings nor for finish
around ends of joints, beams, posts etc.
4.3 Deductions for openings exceeding 0.5 sq. mt. but not exceeding 3 sq. mt. each
shall be made as follows and no addition shall be made for reveals, jambs, soffits etc.
of these openings :
(a) When both the faces or walls are provided with finish, deduction shall be made for one face only.
(b) When each face of wall is provided with different finish deduction shall be made for that side of frame for
door, windows etc. on which width of reveals is less than that of the other side, where width of reveals on
both faces of wall are equal, deduction of 50% of area of opening on each face shall be made from total
area of finish.
(c) When only one face of wall is treated and the other face is not treated, full deduction shall be made if the
width of reveal on the treated side is less than that on the untreated side, but if the width of the reveal is
equal or more than on the untreated side neither deductions nor additions be made for reveals, jambs,
soffits, sills etc.
4.4 In case of area of opening exceeding 3 sq. mt. each, deduction shall be made for openings but jambs, soffits,
shall be measured.
4.5 No deduction shall be made for attachment such as casing, conducts, pipe, electric wiring and the like.
4.6 corrugated surfaces shall be measured flat as fixed and not girth. The quantities so measured shall be
increased by the following percentage and the resultant shall be included with the general areas.
(a) Corrugated steel sheets 4%
(b) Corrugated A. C. Sheets 20%
(c) Semi corrugated A. C. Sheets 10%
(d) Nainital pattern roof (Plain sheeting with rolls) 10%
(e) Nainital pattern roof (with corrugated sheets) 25%
4.7 Cornices and other wall features, when they are not picked out in a different finish/colour shall be girthed and
included in the general area.
4.8 The rate shall include the cost of all materials, labour, scaffolding, protective measures etc. involved in all the
operations described above.
4.9 The rate shall be for a unit of one sq. metre.
3.1 List of approve. Brands:-
1) Asian paint.
6) Nippon Paint.
Or equivalent Brand with I.S.I. Mark.
Painting two coats (excl. priming coat) on new steel & other Metal surfacer with enamel paint, brushing,
interior to give an even shade incl. cleaning the surface of all dirt, dust and other foreign matter
1.0 Materials : The enamel paint shall conform to M-44 B.
2.0 Workmanship :
2.1.1 The materials required for work of painting work shall be obtained directly from approved manufacturers
or approved dealer and brought to the site in maker's drums, kege etc. with seal unbroken.
2.1.2 All materials not in actual use shall be kept properly protected, lids of containers shall be kept closed and
surface of paint in open or partially open containers covered with a thin layer of turpentine to prevent
formation of skin. The materials which have become stale or flat due to improper and long storage shall
not be used. The paint shall be stirred thoroughly in its container before pouring into small containers.
While applying also the paint shall be continuously stirred in smaller container. No left over paint shall be
put back into stock tins. When not in use, the containers shall be kept properly closed.
2.1.3 If for any seasons, thinning is necessary, the brand of thinner recommended by the manufacturer shall
2.1.4 The surface to be painted shall be thoroughly cleaned and dusted. All rust, dirt and grease shall be
thoroughly removed before painting is started. No painting on exterior or other exposed parts of the work
shall be carried out in wet, damp of otherwise unfavourable weather and all the surfaces shall be
thoroughly dry before painting work is started.
2.2 Application :
1.1.1 Brushing operations are to be adjusted to the spreading capacity advised by the manufacture of
particular paint. The paint shall be applied evenly and smoothly by means of crossing and laying off. The
crossing and laying off consists of covering the area over with paint, brushing the surface hard for the
first time over and then brushing alternately in opposite directions two or three times and then finally
brushing lightly in direction at right angles to the same. In this process, no brush marks shall be left after
the laying off is finished. The full process of crossing and laying off will constitute one coat.
1.1.2 Each coat shall be allowed to dry completely and lightly rubbed with very fine grade of sand paper and
loose particles brushed off before next coat is applied. Each coat shall vary slightly in shade and shall be
got approved from Engineer-in-charge before next coat is started.
1.1.3 Each coat except the last cost shall be lightly rubbed down with sand-paper of fine pumice stone and
cleaned of dust before the next coat is applied. No hair marks from the brush or clogging of paint puddles
in the corners of panels angles of mouldings etc. shall be left on the work.
1.1.4 special care shall be taken while painting over bolts, nuts, rivets, overlaps etc. Approved best quality
brushes shall be used.
2.0 Mode of measurements & payment :
2.1 The relevant specifications of item No. 19.12 shall be followed for mode of measurements and payment.
The rate is excluding priming coat.
2.2 The rate shall be for a unit of one sq. metre.
19.15 Extra over item No. 19.7 and 19.11 for every subsequent coat of paint.
1.0 Materials & Workmanship :
1.1 The relevant specifications of item No. 19.7 shall be followed except that the work of painting shall be
carried out for subsequent coat.
2.0 Mode of measurements & payment :
2.1 The relevant specifications of item No. 19.7 shall be followed except that the extra rate shall be paid for
every subsequent coat of paints applied over and above the rate of item No. 19.7 and 19.11.
The rate shall be for a unit of one sq. metre.
Painting two coats (excl. priming coat) on peviously painted steel & other Metal surfacer with enamel
paint, brushing, interior to give an even shade incl. cleaning the surface of all dirt, dust and other foreign
3.0 Materials : The enamel paint shall conform to M-44 B.
4.0 Workmanship :
4.1.1 The materials required for work of painting work shall be obtained directly from approved manufacturers
or approved dealer and brought to the site in maker's drums, kege etc. with seal unbroken.
4.1.2 All materials not in actual use shall be kept properly protected, lids of containers shall be kept closed and
surface of paint in open or partially open containers covered with a thin layer of turpentine to prevent
formation of skin. The materials which have become stale or flat due to improper and long storage shall
not be used. The paint shall be stirred thoroughly in its container before pouring into small containers.
While applying also the paint shall be continuously stirred in smaller container. No left over paint shall be
put back into stock tins. When not in use, the containers shall be kept properly closed.
4.1.3 If for any seasons, thinning is necessary, the brand of thinner recommended by the manufacturer shall
4.1.4 The surface to be painted shall be thoroughly cleaned and dusted. All rust, dirt and grease shall be
thoroughly removed before painting is started. No painting on exterior or other exposed parts of the work
shall be carried out in wet, damp of otherwise unfavourable weather and all the surfaces shall be
thoroughly dry before painting work is started.
2.2 Application :
2.2.1 Brushing operations are to be adjusted to the spreading capacity advised by the manufacture of
particular paint. The paint shall be applied evenly and smoothly by means of crossing and laying off. The
crossing and laying off consists of covering the area over with paint, brushing the surface hard for the
first time over and then brushing alternately in opposite directions two or three times and then finally
brushing lightly in direction at right angles to the same. In this process, no brush marks shall be left after
the laying off is finished. The full process of crossing and laying off will constitute one coat.
2.2.2 Each coat shall be allowed to dry completely and lightly rubbed with very fine grade of sand paper and
loose particles brushed off before next coat is applied. Each coat shall vary slightly in shade and shall be
got approved from Engineer-in-charge before next coat is started.
2.2.3 Each coat except the last cost shall be lightly rubbed down with sand-paper of fine pumice stone and
cleaned of dust before the next coat is applied. No hair marks from the brush or clogging of paint puddles
in the corners of panels angles of mouldings etc. shall be left on the work.
2.2.4 special care shall be taken while painting over bolts, nuts, rivets, overlaps etc. Approved best quality
brushes shall be used.
3.0 Mode of measurements & payment :
3.1 The relevant specifications of item No. 19.12 shall be followed for mode of measurements and payment.
The rate is excluding priming coat.
3.2 The rate shall be for a unit of one sq. metre.
19.16 Extra over item No. 19.7 and 19.11 for every subsequent coat of paint.
3.0 Materials & Workmanship :
1.1 The relevant specifications of item No. 19.7 shall be followed except that the work of painting shall be
carried out for subsequent coat.
4.0 Mode of measurements & payment :
4.1 The relevant specifications of item No. 19.7 shall be followed except that the extra rate shall be paid for
every subsequent coat of paints applied over and above the rate of item No. 19.7 and 19.11.
The rate shall be for a unit of one sq. metre.
Painting two coat (excluding priming coat) on previously painted wood and wood based surfaces with
enamel paint to give even shade including cleaning of all dirt, dust and other foreign matter.
1.0 Materials :
1.1 The enamel paint shall conform to I.S. 133-1975.
2.0 Workmanship :
2.1 The relevant specifications of item No. 19.7 shall be followed for general and applications of paint, except
that the enamel paint shall be used for painting on new wood/wood based surfaces.
2.2 In painting doors and windows the putty, round the glass panes also be painted but care shall be taken to
see that no paint, stain etc. are left on the glass. Top of shutters and surfaces in similar hidden locations
hall not be left out in painting.
3.0 Mode of measurements & payment :
3.1 The relevant specifications of item No. 19.12 shall be followed, for mode of measurements and
payments. The rate excludes cost of priming coat.
The rate shall be for a unit of one sq. metre.
Arrangement of zula with two or nece. skilled labour for repairing & maintenance work out side building
work etc.complete as per insructer incharge(At any floor level)
Wherever scaffolding is necessary it shall be erected in such a way that as far as possible on part of
scaffolding shall rest against the surface to be white or coloured washed. A properly secured strong and well tied
suspended platform (Zoola) may be used for Premium Acrylic Exterior Paint (Apex). Where ladders are sued,
pieces of old gunny bags shall be tied at top and bottom to prevent scratches to the floors and walls.
Mode of measurements and payment :
The rate shall be for a unit of No.
Providing and laying Texture paint of 1.00 mm thick and of approved shade, pattern on wall / ceiling of
plastered or wooden panel / ceiling. Rate include necessary back coat laapi, texture grout, and finishing
coat of plastic emulsion paint
Mode of measurements and payment :
The rate shall be for a unit of Smt.
Providing & Fixing Angle Cock Of "Ess Ess" Trend Series Or Equivalent Standard Make As
Approved By Engg.In Charge All Complete.
Mode of measurement
The rate shall be for a unit of one number basis
Provdg. & laying S.W. Gully trap with C.I. garting brick masonry chamber & water tight C.I. cover with
frame of 300 mm x 300 mm size ( inside) with standard weight.sqare mouth trap size 150 x100 mm P or R
Providing erecting and fixing double coated Syntex or equivalent PVC. (ISI) water tank of required
capacity each with all necessary fittings and connection etc. complete on terrace
Providing and fixing PVC SWR Nahni trap IS 14735 for drain - 75mm diameter with jali of the following
nominal diameter of self cleansing design with C.I scread down or hinged grating including the cost of
cutting and making good the walls.
Providing laying and jointing in true line and level.U.P.V.C. Pipe(SCH-40) for cold water including fittings
make PRINCE/ SUPREME/ASTRAL/FINOLEX or equivalent as approved by EngineerInCharge.Pipes shall
be fixed on the wall with the help of clamp at every two metre C/C or shall be concelled as directed
including necessary fittings etc. including testing of pipe and joints and fixing the same with adhesive
solvent, including cost of all materials.
Provdg. & fixing UPVC handle valve of Prince,Supreme , Astral, finolex or equivalent make as per dir. Of
engg. In charge.
Provdg. And fixing to wall ceiling and floor 10.00 kg. F/Sq.Cm working pressure polythelene pipes of the
following outside diameter, low, density, complete with special flange compression type fittings, wall
clips etc. making good wall ceiling and floor.
1.0 Materials :
1.1 The low density polythene pipe of specified diameter with 6 Kg/Sq.cm. working pressure shall conform to
I.S. 3076/1968. The specials and fitting required shall be of best quality.
2.0 Workmanship :
2.1 The P.V.C. Pipes of specified diameter shall be fixed as directed. Due to thermal expansion of rigid
P.V.C. Pipes, due allowance shall be made particularly in over ground pipe lines for any change in length
of pipe line which may occur during installation or when pipe line is in service.
2.2 Above ground installation of rigid P.V.C. pipe should be undertaken after preparations are observed for
their protection against direct sun rays and mechanical damage.
2.3 The rigid P.V.C. pipe lines should not be kept exposed above ground when if passes through public
places, railway lines, road side and foot paths.
2.4 P.V.C. pipes shall be supported at the following intervals :
20 mm dia. 500 mm. 32 mm. dia. 900 mm.
25 mm. dia. 750 mm.
2.5 Closer support spacing shall be provided if recommended by the manufacture.
2.6 The guide lines indicated by the manufacturer regarding, handling, transportation, storing laying and
jointing of pipes shall be kept in view during execution.
2.7 P.V.C. pipes shall be fixed on wall with wooden plugs and suitable plastic clamps.
2.8 Jointing the pipes :
2.8.1 The pipes and sockets shall be accurately cut. The ends of the pipes and fittings should be absolutely
free from dirt and dust. The outside surface of the pipes and the inside of the fittings shall then be
roughened with emery paper, and then solvent cement joint. Since solvent cement is aggressive to
P.V.C., care must be taken to avoid applying excessive cement to the inside of pipe sockets as any
surplus cement cannot be wiped off after jointing. Empty solvent cement tins, brushes rags, or paper
unpregnated with cement should not be buried in the trenches. They should be gathered, not left
scattered about, as they can prove to be a hazard to animals, which may chew them.
2.8.2 If manufacture recommends its own methods of jointing, the same shall be adopted after necessary
approval from the Engineer-in-charge.
2.9 Laying pipes in Trenches :
2.9.1 The pipe shall be laid over uniform relatively soft fine grained soil found to be free of presence of hard
objects such as large flints, rocky projections, large tree roots etc. The width of the trenches shall be
minimum width required for working.
2.9.2 The pipes laid underground shall not be less than one metre from the ground level. The pipe shall be
positioned in the trenches so as to avoid any induced stresses due to deflection. Any deviation required
shall be obtained by using proper type of rubber ring joints.
3.0 Mode of measurements & payment :
3.1 The relevant specifications of item 23.2 (A) shall be followed except that the P.V.C. pipes of specified dia.
shall be paid under this item.
The unit rate shall be for a unit of one running metre
Providing and fixing water closet s quatting P an (IndiantypeW.C.Pan) size580mm (Earthwork, bed
concrete, footresteandtraptobemeasured and paid for separately)(A)VitreousChina.(I)Long pattern =
White colour (Bldg.Sor 15-16) page no-263,it no-23.111,23009
1.0 Materials : Wash down water closet (IndiantypeW.C.Pan) shall conform to M-60. Cement mortar shall
conform to M-11.
2.0 Workmanship : Closet shall be fixed to the floor by means of 75 mm. long
mm. diameter counter sunk bolts and nuts embedded in the floor concrete using
rubber or fibre washers so as not to allow any lateral displacement. The joint
between the trap of W.C. and soil pipe shall be made with C.M. 1 : 1 (1 cement :
3.0 Mode of measurements & payment :
1.1 The rate shall include the cost of all labour for fixing pans and seat and cover,
inlet, connections etc. complete including testing the same.
1.2 The payment of seat and cover shall be made separately.
1.3 The rate shall be for a unit of one number.
Providing and fixing wsh down water closet (Europeantype,W.C.Pan) with integral P or S trap including
jointing the trap with soil pipe in Cement Mortar1:1(1-Cement:1-finesand) (Sea land cover to be measured
and paid for separately) (A)vitreous China Pattern :(i) in white colour (Bldg.Sor 15-16) page no-263,it no-
2.0 Materials : Wash down water closet (European type W.C. Pan) shall conform to M-60. Cement mortar shall
conform to M-11.
3.0 Workmanship : Closet shall be fixed to the floor by means of 75 mm. long
mm. diameter counter sunk bolts and nuts embedded in the floor concrete using
rubber or fibre washers so as not to allow any lateral displacement. The joint
between the trap of W.C. and soil pipe shall be made with C.M. 1 : 1 (1 cement :
4.0 Mode of measurements & payment :
1.4 The rate shall include the cost of all labour for fixing pans and seat and cover,
inlet, connections etc. complete including testing the same.
1.5 The payment of seat and cover shall be made separately.
1.6 The rate shall be for a unit of one number.
Providing and fixing C.P. brass waste for washbasin or sink. (A) 32mmdia.
Providing & Fixing 0.45 to 0.60 long Lead Connection for Urinal/Wash basin etc. comp. as per Inst. of
engg. In charge
Providing and fixing 12.5 Litres low level flushing cistern with a pair, of C.I. or Mild brackets, complete
with fittings such as lead valve less syphon, 15mm nom.nal size brass ball valve with polythene float, C.P
brass handle unions and couplings for connections, with inlet, outlet and overflow pipes, 40mm dia.
porcelain enamelled flush bend including cutting holes in walls and making good the same connecting
the flush bendwith cistern and closet (overflow pipe to be measured and paid for separately)(A) Vitreous
China (I) In white colour
Providing and fixing plastic seat and cover for wash down water closer with C.P. brass hinges and
rubber buffers. (B) Black plastic seal and cover
Providing and fixing Urinal of approved quality including connection with trap and with integral
longitudinal flush pipe.(A) Squating plate pattern white earthenware 550mm x 300mm.
Providing and fixing chromium plated brass half run flush cock of approved quality including fixing in
pipe line etc. complete.
Providing & Fixing PVC Body Chromium Finish Hand Faucet with Flexible Pipe of Approved Brand &
Manufacturers with holder etc. complete as per direction of E.I.C.
Providing and fixing wash basin with single hole for pillar tap with C.I. or M.S. brackets painted with
including cutting holes and making good the same but excluding the fittings. (A) vitreousChina (II) Flat
back wash basin 550mm x 400mm size (I) in white colour
Providing and fixing Kitchen sink with C.I. or M.S. brackets, painted white including cutting holes in walls
and making good the same but excluding fittings. (C) Vitreous China Sink.(i) 600mm x 450mm x 150mm
Providing and fixing C.P. brass shower rose with 15mm or 20mm inlet.(A) 100mm dia.
Provdg. & fixing 600mm x 450 mm Bevelled edge mirror of superior glass mounted of .6 mm th. A.C.
sheet or plywood sheet and fixed to wooden pluge with C.P. brass screws and washers.Bldg.s.o.r.2015-
Mode of measurement
The rate shall be for a unit of one smt basis.
Provdg. & fixing C.P.Brass towal rail complete with C.P. brass brackets fixed to wooden plugs with CP
Brass screws.(600 mmx 20 mm size)
Mode of measurement
The rate shall be for a unit of one smt basis.
Provdg. & fixing CP Brass screw down bib taps of following size
Provdg. & fixing C.P.brass pillar tap capstan head, screw down high pressure with screws shanks and
back nuts. (A) 15 mm dia
Item No. : 89-A
Providing and fixing 15mm Doctor Bib cock of Approved brand including fixing in exi. line & rate
includes removing old cock etc. as per inst of eng in charge.
Supplying necesary PVC/UPVC/Other hardware,G.I. Fittngs etc.comp.
Conseal cock (PVC)
15mm bib tap (PVC)
25mm Flush cock
UPVC Tee,Bend,Couplin
Lead Connection
15mm Handle Valve (UPVC)
25mm Handle Valve (UPVC)
Nahni Trap (PVC)
15mm dia UPVC Pipe
25mm dia UPVC Pipe
Water closet squatting pan (Indian type WC Pan)
Wash down water closet (European type WC Pan)
Plastic seat and cover for WC
Hand Faucet with Flexible Pipe (PVC)
Mode of measurement
The rate shall be for a unit of one No basis.
Providing and supplying of labour for necessary excavation, cleaning, Shifting of Material Or any other,
or for any other work as directed by Engineer In charge.
Plumber (Fitter)
Mazdoor at Day Male
Mode of measurement
The rate shall be for a unit of one No basis.
Supplting of welding machine / gas cutter including cost of welding rods/gas, Transportation, including
carting from site to work place.
Hiring of Three wheeler carrier (Chakado/Rixa) considering 10 Hrs. as working day hours incl.Driver
Providing and laying Cement concrete flooring for I.P.S. 1:2:4 (for Indian Patent Stones) (1 cement:
coarse sand: 4 graded stone aggregate 20 mm. nominal size) lain in layer finished with a floating coat of
net cement.(40 mm th)
Water shall conform to M-1. Cement shall conform to M-3. Sand shall conform to M-6. Stone aggregate 20 mm.
nominal size shall conform to M-12.Cement concrete 1:2:4 proportion measured by volume shall conform to
relevant specification or ordinary grade 1:2:4 concrete.
The cement concrete flooring of 40 mm. thick (average) is to be laid as per the site condition. The concrete shall
be mixed in a mechanical mixer at the work. Hand mixer may however be allowed for smaller quantities of
work and in case of failure of machines or as permitted by the engineer-in-charge. It shall carried out on a
water tight platform and care shall be taken to ensure that mixing is continued until the mass is uniform in
colour and consistency. However in such cases 10% more cement than otherwise required shall have to be
used without any cost. The mechanical mixing shall be done for a period of /2 to 2 minutes. The quantity of
water shall be thus sufficient of produce a dense concrete required workability for the purpose. Flooring of
specified thickness shall be laid in accordance with approved pattern or as directed. Finishing operation shall
start shortly after the cessation of beating and shall be spread over a period of one to six hours depending
upon the temperature and atmospheric conditions. The surface shall be left for some time till moisture
disappears from it. Fresh quantity of cement shall be mixed with water to form a thick slurry and spread over
the surface while the concrete is still green. Use of dry cement or cement and sand mixture sprinkled on this
surface to stiffen the concrete or absorb excessive moisture shall not be permitted. The cement slurry shall
than be properly paste twice by means of iron flats, once, when the slurry is applied and the second time
when cement starts setting and finished smooth. The surface shall be marked with string or B.R.C. fabric jali
to make the surface non slippery as and when directed. The junction of floors with wall plaster dado or
skirting shall be rounded where so required upto 25 mm. radius. Flooring in lavatories and bath rooms shall
be laid after fixing of water closet and squatting pans and floor traps, which shall be plugged while laying the
floors and opened after the floors, are completed. Any damage, done to water supply sanitary fittings during
the execution of work shall be mage good.
After the final set, the concrete shall be kept continuously wet, if required ponding for a period of not less than
days from the date of placement.
The form work shall be provided if necessary as directed by the engineer in charge. Concreting shall be done as
per alternate bay method with necessary centering wither by mastic or cement mortar as directed.
Mode of measurement & payment :
The rate shall include the cost of all material and labour involved in all the operations described above. No
deduction shall be made or extra paid for any opening upto 0.1 sq. meter in area in the floor, nothing extra
shall be paid for laying the floor at different levels in the same room or the court yard.
The rate shall be for unit of one sq. meter.
Providing and fixing M.S. grills of required pattern to wooden frames of windows etc. with M.S. flats at
required spacings and frame alround, square or round bars with round headed bolts and nuts or by
screws (A) Plain Grill. (upto 10 ton)
Providing and fixing M.S. grills of required pattern to wooden frames of windows etc. with M.S. flats
at required spacings and frame alround, square or round bars with round headed bolts and nuts or by
screws (A) Ornamental Grill. (upto 10 ton)
Materials: Red lead paint primer shall conform to I. S. : 102-1962.
The steel sections as specified or required shall be cut, square and to correct lengths, as per drawings and
design. The cut ends exposed to view shall be finished smooth. No. two pieces shall be welded or other wise
jointed to make up the required length of member, except as indicated in the drawings or as directed. All
straightening and shaping to form shall be done by application of pressure and not by hammering. Any bending
or cutting shall be carried out in such a meaner as not to impair the strength of the metal. All operations shall be
done in cold state unless otherwise directed/permitted.Steel riveted or bolted in built up sections, frame work.
The steel structure as shown in the drawings or as per direction of the Engineerin-charge shall be laid out one
level platform to full scale and to full size or in parts. A steel tape shall be used for measurements to ensure
maximum accuracy.
Wooden templates 12 mm to 19 mm thick or metal sheet template shall be made to correspond to each
connecting gussets plate and rivet holes shall be accurately marked on them and drilled.he template shall be laid
on the steel members, and holes of the steel members shall also be marked for cutting. The base of steel
columns and the position of Anchor bolts shall be carefully set out.
All stiffeners shall be formed by pressure and where practicable, the metal shall not be cut and welded in making
these. In major works or where so specified shop drawings giving complete details and information for the
fabrication of the component parts of the structure, including location type size, length and details of rivets, bolts,
or weld shall be prepared in advance of the actual fabrication and as approved. The drawings shall indicate the
shop and field rivets and bolts. The steel member shall be distinctly marked or stenciled with paint with the
identification mark as given in the shop drawings. The bars shall be thickened at the ends, so as to provide for
screwed threads and gradually tapered off to meet their normal section. Great accuracy shall be observed in
fabrication of various member, so that these can be assembled without being unduly packed, strained or forced
into position and when built up, shall be true and free form twist, bniks, buckles, or open joints. Before making
holes individual members for fabrication, the steel work intended to be riveted or bolted together shall be
assembled or clamped properly and tightly so as to ensure close abutting or lapping of the different members. All
stiffeners shall bear tightly both at top and bottom without being drawn or caulked. The abutting joints shall be cut
or dressed true and straight and fitted close together. Web splice plates and filters under stiffeners shall be cut to
fit within 3 mm or flange angles, web plates of girders shall have not cover plates, shall have their ends flush with
the top of angles forming the flanges unless otherwise required. The web plates when spiced shall have
clearance of more than 6 mm. The erection, clearance for cleared ends of members connecting steel to steel
shall preferably be not greater than 1.5 mm. The erection clearance at the ends of beams without web cleats
shall to be more that 3 mm at each end but where for a practical reason greater clearance is necessary, suitably
designed seating shall be provided. Pins and rollers shall be accurately turned to gauge. These shall be straight
and smooth and free from flows. The roller bearing shall be provided with adequate arrangement for holding the
girders or truss resting on it. In columns caps and bases, the ends of shafts together with the attached gussets
angles, channels etc., after riveting together shall be accurately mechanized so that the parts connected butt
against each other over the entire surfaces of contract connecting angles or channels shall be fabricated and
placed in position with greater accuracy so that they are not unduly reduced in thickness by machining. The ends
of bearing stiffeners shall be machanised or ground to fit tightly both at the top and bottom. All holes shall
generally be drilled to the required size and at the required size and at required position. Sub punching shall be
permitted, provided it is done 3 mm or less in diameter and remade thereafter to the required size. The holes for
rivets and bolts shall be larger by 0.4 to 6 mm than the nominal diameter of rivets or black bolts depending up on
the diameter of rivets.Holes shall have their axis perpendicular to the surface bored through. The drilling or
reamering shall be free form butts, and the holes should be clean and accurate. Holes for counter shunk bolts
shall be made in such a manner that their heads fit flush with the surface after fixing. The fabrication work shall
be completed in workshop as far as it is practicable to do so. Site joints shall be done with rivets and fitted bolts
or black bolts, as shown in the drawings or as directed.
Generally the following principles shall govern the use of rivets turned and fitted bolts, and black bolts.
(i) Rivets and turned and fitted bolts shall be used where the connection is such that slip
under load has to be avoided.
(ii) Black bolts may be used very sparingly where a force is carried through a connection without impact, vibration
or reversal of stresses.
Riveting: The parts assembled for riveting shall be in close contact with each other and the bearing stiffeners
shall bear tightly both at top and bottom without being drawn or caulked.Members to be riveted shall be properly
pinned or bolted and rigidly held together while riveting.Drifting of holes shall not be permitted except to draw the
parts together and the drifting tools so used shall have maximum diameter not exceeding the nominal diameter of
rivets or bolts. Drifting done during assembling shall not distort the metal or enlarge the holes.The shanks of
rivets shall project beyond the plate surface sufficiently so as to fill the hole thoroughly and from the required
head after riveting.
The riveting shall be done by hydraulic or pneumatic process. However where such facilities are not available,
hand riveting may be permitted. The rivet shall be heated red -hot, care being taken
to control the temperature of heating so as not to burn the steel. Riveting of diameter less than
mm may be fitted cold. Rivets shall be of heat finish with heads full and of equal size. All loose, burnt or badly
formed rivets with concentric or deficient heads shall be cut out and replaced. The heads of rivets shall be central
to shanks and shall grip the assembled members firmly. In cutting out rivets, care shall be taken so as not be
injure the assembled, members, caulking or recouping
shall not be permitted.For testing rivets, hammer weighing approximately 0.25 kg. shall be used of the rivets shall
be tapped, slack rivets will give a hollow sound and a jar. All rivet heads shall be painted with red lead paint
within a week of their fixing. Bolting all bolt heads and nuts shall be hexagonal and of equal size unless specified
otherwise. The screwed heads shall conform to I.S. : 1363:1960 and the threaded surface shall not be tapered.
The bolts shall be of such length so as to project two clear threads the nuts, when fixed in position and these
shall fit in the holes without any shakes. The nut shall be fit in the threaded ends of bolts properly. Where turned
and fitted bolts are required to be used in place of rivets they shall be provided with washers not less that 6 mm
thick so that the nut when tightened shall not bear on the unthreaded body of the bolt. Tapered washers shall be
provided for all heads and nuts bearing on leveled surfaces. The threaded portion of the bolts shall not be within
the thickness of the parts bolted together. The faces of the bolt and nuts abutting against steel members shall be
machine finished. Where there is a risk of the nut being removed or becoming loose due to vibrations or reversal
of stresses, these shall be secured from slackening by the use of locknuts, spring washers,cross cutting or
hammering down of threads as directed.Bolts, nuts and washers shall be thoroughly cleaned and dipped in
double boiled linseed oil before use. The whole steelwork shall be painted with a coat of priming coat of red lead,
as per relevant specifications of painting.
Mode of measurement and payment:
The steelwork shall be measured in general as under.
(a) All work shall be measured on the basis of finished dimensions as fixed at site and
measured net unless specified otherwise.
(b) The weight of steel sections, steel strips in finished work shall be calculated from standard weight on the
same basis on which steel is supplied to the contractor by department or those given in relevant I. S. if steel is
arranged by the contractor.
(c) The weight of steel plates and strips shall be taken from relevant I. S. based on 7.85 kg/sq. meter for every
millimeter sheet thickness if steel is supplied by the contractor, otherwise the eight shall be calculated on the
basis on which steel is supplied to the contractor by department.
(d) Unless otherwise specified weight of clearest, brackets, packing pieces, bolts, nuts, washers, distance pieces,
separators, diaphragm gusset (taking over all square dimensions) fish plates etc. shall be added to the weight of
respective items.
(e) In riveted work allowance to be made of weight of rivet hands. No deductions shall be made for rivet or bolt
holes excluding holes for anchor or holding down bolts.
(f) For forged steel and steel casting weight shall be calculated on the basis of 850 kg/cum.
(g) Unless otherwise specified an additional of 2.5 percent of the weight of structure shall be made for shop and
site rivet heads in riveted steel structure.
(h) Unless otherwise specified no allowance shall be made for the weld metal in case of welded steel structure.
(i) Dimensions other than cross sections and thickness of plates shall be measured to nearest 0.001 m
(j) Mill tolerance shall be ignored when weight is determined by calculation.
The rate includes cost of all material, labour, erection, hoisting, scaffolding protective measure, required
for proper completion of the item of work. This shall also included conveyance and delivery handling, loading,
unloading and storing etc. required for completing the item described above including necessary wastage
involved.The rate shall be for a unit of one kg.
Providing and fixing in position collapsible shutters with vertical channels 20 x 10 x 2 mm braced with
flat iron diagonal 20 x 6 mm size with top and bottom rails T iron 40 x 40 x 6 mm with 38 mm dia steel
pulleys complete with bolts, units, locking arrangements, stoppers, handles, including a priming coat of
Providing & Fixing in position Alluminium doors with frame using approved quality anodised extruded
alluminium section as approved by Engg.in charge(Jindal alluminium)(a) Frame sections 101.6x44.45 mm
(b) Shutter bottom vertical & top section 83.5x44.45 (wt.1.31 kg/mt.)(at 1.31 kg/mt) (c) Shutter bottom
section at 114.3x44.45 mm at (1.37 kg/mt) Shutter middle section at 100x44.3 wt.(1.37 kg/mt)
incl.providing & installing 5 mm thick approved color Acrylic sheet of standard quality fixed with glazing
chips on upper pannel & Laminated sheet on lower pannel (wtt.0.13 kg/Rmt) etc.comp.as direction of
engg.in charge.
Providing & Fixing in position External quality high grade anodized (preferably M-6), Aluminum Door
,Ventilations, window Fix /sliding type - 2/3/4 Track with frame & shutter using approved quality Metalic
color anodised aluminum section of standard weight of "Jindal" or equivalent make, including P/F
installing 5 mm thick approved Clear or Frosted Glass of Modiguard or equivalent make with Necessary
Fixtures & Fittings of standard quality as approved by engg.in charge etc. complete as directed and
approved. Rate includes all necessary hardware, fixtures, locks, handles, door-stop, door-magnets, etc.
as required upto the fullest satisfaction of consultants. The ventilations shall be of movable type.
Providing and fixing window having extruded aluminum Colour anodized section frame main outer size
127mm x 38.10mm x 1.35mm @wt. 1.384kg/m, horizontal Four track member size 122.20mm x 31.75mm x
1.10mm@ wt 1.205 kg/m, vertical member of size 122.20mm x 31.75mm x 1.50mm @1.398 kg/mt with
sliding shutters of horizontal member size 40mm x 18mm x 1.29mm@ 0.456kg/mt ,vertical member of size
40mm x 18mm x 1.29mm @ 0.456 kg/mt with 5 mm thick transparent bronze colour tinted float glass with
powder coated aluminum fittings and fixtures and transparent silicon sealant glass fixing to frame as per
details etc complete for window.
Metalic Color Anodized Aluminum alloy used in the manufacture of extruded sections for the fabrication
of doors, windows, ventilators shall confirm to designation HE9-WP of IS:733.
Transparent sheet glass shall confirm to the requirements of IS:2835. Wired and figured glass shall be as
per IS:5437. Builder's hardware of fittings & fixtures shall be of the best quality from approved manufacturers.
All aluminum doors, windows, ventilators and partitions shall be of the type and size as specified. The
doors, windows, ventilators shall confirm to the requirements of IS: 1948. Aluminum windows, shall confirm to IS:
1949, if so specified. All aluminum units shall be supplied with Metallic color anodized finish. The minimum
anodic film thickness shall be 0.015 mm. Doors, windows and ventilators shall be of an approved manufacture.
Fabrication of the units shall be with the extruded sections, cut to correct lengths, mitred and welded at the
corners to a true right angle conforming to the requirements of IS: 1948. Tolerance in overall dimensions shall be
within ± 1.5mm. The frames and shutters shall be free from warp or buckle and shall be square and truly plane.
Punching of holes, slots and other provisions to install fittings or fixtures later shall be made at the correct
locations, as per the requirements.
Aluminium swing type doors, aluminum sliding windows, partitions shall be as specified. IS: 1948 and IS:
shall be referred to incorporates the sizes, shapes, thickness and weight per running meter of extruded sections
for the various components of the units. However, new sizes, shapes, thickness with modifications to suit snap-
fit glazing clips etc. are being continuously being added by various leading manufacturers of extruded sections,
which are available in the market. As such, the sections of the various components of the unit proposed by the
Contractor, will be reviewed by the GSDWICL and will be accepted only if they are equal to or marginally more
than that given in the codes/as specified.
Specific provisions as stipulated for steel doors, windows, and ventilators under related clause shall also be
applicable for this item work. Glazing beads shall be of the snap-fit type suitable for the thickness of glazing
proposed as indicated in the items of works prepared by the Contractor. A layer of clear transparent lacquer
shall be applied on Aluminium sections to protect them from damage during installation. This lacquer coating
shall be removed after the installation is completed.
Mode of measurement
Measurement will be given on the Square meter basis of actual area of the Aluminum section.
Providing and fixing 35mm thick shutters for Doors, windows and clear story windows including
anodised alluminium butt hinges with necessary screws.
Wood for shutter shall conform to M-29 (2) Anodised aluminium butt hinges shall conform to M-43.
Workmanship: The item covers the requirement of preparation of shutters for doors, windows, clerestory
windows, their supply and fixing.
Panelled shutters shall be constructed in the form of timber frame work of styles and rails with panel, inserted of
type as specified in the detailed drawings. Panel shall be fixed by providing grooves in the style and rails. The
styles and rails shall be joined to each other by mortise and tenon joints at right angles.
All members of the shutters shall be straight without any warp or how and shall have smooth, well planed faces
at right angles to angles to each other.
The size of styles and rails shall be as per drawing or as directed. Styles and rails of shutters shall be made of
one piece only.
Timber paneling:
Thickness of the panel shall be as specified in the item as shown in the drawing or as directed. If the
panel is made from more than one piece, the pieces shall be finished as shown in the detailed drawings and shall
be joined with continuous groove with specified size. The end pieces of the panel and the top and bottom of the
panel shall be provided with continuous tongue to frame into groove of the frame shutter. An air space of 1.5 mm
shall be left in the groove of frame shutter while fixing the panels in it.
The faces of the panel as well as various pieces of the panel shall be closely fitted to the size of the grooves.
Finishing of the corners of raised panel edges shall be done as shown in drawings or as directed.
Fixtures & Fastenings:
The rate shall include anodised aluminium butt hinges including fixing with iron screws. The size and number of
hinges shall b as per table given in annexure-1.
Mode of measurements and payment:
The rate for shutter includes cost of providing block and clear for keeping the shutter in open position as
The dimension of the shutter shall be measured clear size of the shutter in close position between the
grooves of the frame.
The rate shall be for a unit of one sq. meter.
Provoding and fixing flush door shutters, solid core construction with frame of first class hardwood with
cross board and face veneer or plywood face panels, including anodised alluminium butt hinges with
necessary screws. (B) Non-decorative type and block board core anodised alluminium butt hinges in
flush door shutters (2) 35 mm thick.
Mode of measurements and payment:
The rate for shutter includes cost of providing block and clear for keeping the shutter in open position as
Providing and Fixing 1 H.P. Electrical monoblock or submarcible water pumps withmotor and required
cable and switch board of approved brand and make etc.comp.as directed.
Providing cement vata (10cm. x 10 cm. size) quarter round in cement mortar 1:1 including neat cement
finishing, watering etc. complete.
Carring out plinth treatment to post construction /existing structure by spraying chemical solution for
termite control treatment including labour and material consistment with I.S.Ispecification. Using
Chlordene and Chiorpur files 20EC. AsPer 6131_paret Consentration Weight one percentisre
commendedi. eonelitre 20ECchemical emulsion with 19 liter give1% concrent ration inclusive of one litre
chemical emulsion appication at the rate of 5Litre chemical /Sqm of surface is recommended as per I.S.
Conveyance charges of earth lime, murrum, building rubbish, manure, garbage, sludge, excavated rock,
fly ash, aggregate of any kind etc. comp. upto 5 km lead.
All the surplus earth etc. shall be carried away immediately from the site of work to a place within 5km.
distance or as directed and ordered by the Engineer, so as not to cause any inconvenience to the public traffic
finding which in view of public safety and traffic convenience. The corporation shall carry out the work by any
other agency at the contractor’s risk and cost. If the instructions are not completed within 7 days from the date of
order to cart the surplus materials and clear the site, the said work shall be carried out by the Municipal
Corporation at the risk and cost of the contractor and no claim or dispute shall be entertained in this respect.
If the filling in trenches after settlement of the earth filling in trenches is to be done and the same shall be
carried out by the contractor without asking any extra rate. The contractor shall have to cart the surplus earth
after the trenches we will watered and refilled with the sand. The rate of carting including carting of brickbats,
metal, rubble vegetable and garbage, if necessary to clear the road surface.
The rate shall be for a unit of cubic meter.
Consruction of under ground tank with 23 cm th. Masnory wall in c.m. 1:6 incl. Excavation, necessary
cm B.B.C.C.1:5:10 for foundation and providing R.C.C. 1:2:4 for top & bottom slab of 12 mm. th. And
mm. th R.C.C.paradi on face of internal side of periphary of the tank incl. formwork T.M.T. steel
reinforcement as per given design, vibrating,curing, & mixing of approved water proofing material with
every 50 Kg.bag of cement ,inside plaster in C.M. 1:3 and vatta in C.M.1:1 inside tank .P & F F.R.C. frame
cover of size 600 x 450 mm , fiber steps etc. comp as dire.
The rate shall be for a unit of Lit.
Providing and Laying of Rubber Moulded Paver Block Grey/Coloured 60 mm thick, M-35 Grade of any
size shape (Usually Uni-Paver Blocks) using black trap good quality aggragate of 20 mm nominal size for
footpath, parking areas, service lanes and other areas as mentioned in the drawing / instruction of
engineer in charge. Cost includes formworks using rubber mould, Rate providing and laying paver
blocks as per required grading and specification. The paver block shall be mechanically compacted. The
work of paving blocks shall be executed in line and level by skill mason of flooring work only. It should
be laid in such a way that the no cutting of the paver block to be necessary. if cutting of paver block
necessary then it should be cut by machine only and carting. The finished surface of the paver block
shall have resonably good, plain finished. Paver blocks shall be compacted and shall be relaid if
necessary. Gravel or such type of materials shall not be allowed for production. Laying on 5 cms thick
Paver Block Manufacturing Facilities :
The Paver Block shall be made in factory with following minimum facilities :
1.1 Concrete Block making Machines :
The machine should be capable of producing high quality Paver Blocks by obtaining high level of
compaction by application of hydraulic compaction and also by high intensity vibration to the moulds. The
machine should have automatic control panel for uniformity in strength.
1.2 Concrete Batching & Mixing Plant : (Not essential)
The concrete Mix Design should be followed for each batch of materials. The concrete ingredient should
be mixed in concrete Batching & Mixing plant with minimum capacity of 30 cum/hour. The plant should equipped
with automatic control panel for maintaining water cement ratio from batch to batch to obtain concrete of uniform
quality and strength. The plant should be equipped with adequate mechanism for mechanized loading of raw
materials into mixer and conveyor belt for transportation of concrete from mixer to concrete block making
machine to maintain quality of wet cement.
1.3. Curing:- The factory should have well designed curing area to ensure adequate curing of paver blocks.
Laboratory (Desirable but not essential) :
The factory should have the following:
Compression testing machine of adequate capacity.
Other tools and equipment for testing raw materials and paver blocks.
(1).Systematic record of test results of various paver blocks manufactured in the factory.
(2).Concrete Mix Design for various grade of concrete used for making of paver blocks.
II) SPECIFICATIONS FOR COLOURED PAVER BLOCKS :
Coloured concrete paver blocks shall be manufactured as per attached specifications using approved colour
Pigment of “BAYER” Make “BAYFERROX IRONOXIDE PIGMENTS” with minimum colour pigment of 3% by
weight of cement. The colour shade shall be “RED” as selected by HPCL before commencement of the work.
White cement shall be used for colored pavers to obtain the desired colour shade. The job also includes
providing 50 mm thick sand bedding to match the shade of the paver block.
The colour of the paver block shall be guaranteed against fading of colour for period of 12 months from the date
of laying of the same at site.
All other technical specifications & Procedure for testing, laying & sampling of coloured pavers will be as per
III) PAVERS BLOCK CHARACTERISTICS :
The concrete pavers should have perpendicularities after release from the mould and the same should be
retained until the laying.
The surface should be reasonably smoothe and of anti skid and anti glare type.
The paver should have uniform chamfers to facilitate easy drainage surface run off.
The pavers should have uniform interlocking space of 2mm to 3mm to ensure compacted sand filling after
vibration on the paver Surface.
The concrete mix design should be followed for each batch of materials separately and automatic batching plant
is to be used to achieve uniformity in strength and quality.
The pavers shall be manufactured in single layer only.
Skilled labour should be employed for laying blocks to ensure line and level of laying, desired shape of the
surface and adequate compaction of the sand in the joints.
The pavers shall be of cement gray colour without any pigment & for coloured pavers refer “specifications for
coloured pavers.”
The pavers are to be skirted all round with kerbing using solid concrete blocks of size 150mm X 250mm X
380mm. The kerbing should be embedded for 100mm depth. The concrete used for kerbing shall be cured
properly for 7 days minimum.
IV) Paver Block Dimensions :
Thickness 60mm or 80mm
Shape Uniregular (Uniform Shape with no
Hollow Or Creacks)
Chamfer 4mm to 6mm along top edges
Colour Natural cement grey colour without use
of any pigment.
For coloured pavers refer
“specifications for coloured pavers”
Dimensional Tolerance (+/-) 2mm for length & width,
(+/-) 3mm for Height (Thickness)
V) Testing of Paver Blocks :
SR. Average Values
NO. (Average of Minimum
Five Samples/Site)
1. Compressive Strength Min. 45 N/Sqmm for 80mm
thick OR Min. 30 N/Sqmm
2. Flexural Strength Minimum 4.5 N/Sqmm
3. Abrasion Resistance Maximum
4. Water Absorption Maximum 5.80%
380 Kg/Cum (Not
5. Minimum Cement Contact
* Sampling and Testing procedure as per enclosed specifications
SAMPLING AND TESTING PROCEDURES FOR PAVER BLOCKS.
INTERNAL – Average of minimum 3 samples per 5000 Blocks.
Essential – Minimum 2 Blocks per 10000 bocks. Average of minimum 8 blocks per site.
1. Sampling For Testing
Sampling for testing of paver blocks shall be done in accordance with Appendix-A.
Compressive Strength
Testing for compressive strength shall be undertaken in accordance with Appendix-B.
The average compressive strength of the bocks tested shall be 40 N/Sqmm.
Abrasion Resistance
Testing for abrasion shall be in accordance with IS 1237 (Specifications for Cement Concrete Floor Tiles) –
Flexural Strength
Testing for flexural shall be n accordance with IS 1237 (Specifications for Cement Concrete Floor Tiles) –
Water Absorption
Testing for water absorption shall be in accordance with IS 2185:1979 : Part I (Specifications for Concrete
Masonry Units) – Appendix E.
Providing Kerbing of size 300x300x75 mm of M-25 with good finishing rate incl.pointing in C.M. (1:1) &
fixing in good line , level & plumb etc. comp.
Supplying and fixing of 300 mm-L x 150 mm-B x 380 mm-H Kerb block for Footpath in M-20 grade using
Trenches of specified width and depth shall first be made along the edges of the wearing course of the road or
along the line of pave block flooring to receive the restraint blocks. The bed of the trenches shall be compacted
manually with steel rammers to a firm and even surface and then stones shall be set in P.C.C.
The edge restraint blocks shall be laid with their length running parallet to the paving edge, true in line
and gradient. The joints of blocks shall be not more than 10 mm and filled with the CM 1:3 ( 1 cement : 3 fine
sand ) which shall be cured for 7 days.
Finishing The edges shall be restored and all surplus earth including rubbish etc. disposed off as directed by
the Engineer-in Charge.
Measurements Length of the finished work shall be measured in running metre along the edge of the paving
correct to a cm.
Rate The rate shall include the cost of the materials and labour including stone of specified material involved in
all the operation described above. The rate shall be for a unit of one meter basis.
Providing & Fixing Door closer - complete of Approved make to wooden / Aluminium Doors as per
direction of engg. In charge.
Providing & fixing Approved Make Glass Mosaic on Plastered surface. Glass mosaic shall be of 25 mm x
25 mm size & 4 mm thickness pasted on a net / paper sheet.Glass mosaic pieces are mounted uniformly
on the net / paper sheet. colour shade combinations & Pattern as approved by consultants. Rate
includes all material, Labour , Scaffolding etc. complete.
Providing & Fixing 2 mm thick F.R.P.sheet of Approved Quality & Color / Pattern as per Consultant's
design also includes required fabrication structure in the grid of 2'-0x2'-0 size using hollow pipe of
gauge & size 2"x1" & 1"x1" , G.I. & Bitumen Washers, Silicon paste application for fixing the sheet . Rate
also includesnecessary bending, cutting , labor charges , Zinc Primer coat & Two coats of oil painting of
color as approved by consultants & making good the wall.
Providing 2 mm thick F.R.P. Gutter with necessary M.S. Supporting Brackets)
Providing and fixing 30mm thick solid both side prelam PVC door shutter (sintex door-equivalent) with
necessary alluminium fitting with EL-7 section frame
Item No : 116-117
Providing and jointing stoneware pipes incl. excavation upto 2 mt. refilling, transporting pipes to work
site, unloading lowering in trnch such as cementsand, hemp bitumen as directed, incl. watering the
trenches spreading and cartingaway of surplus.
Lowering, laying and jointing stone ware pipes of following diameters with cement joints in C.M.1:1
proportion in proper position , grade and alignment at all level as directed by Engineer-in- charge
including conveyance from stone to site of work, Jointing material etc.comp.
A)…………do…….(b)10 cm dia line
B)………do……….(c)15 cm dia line, 20cm line
C)……………do….(c)23 cm dia line
The pipe shall be of best quality stoneware pipes. The pipes shall be of approved quality make and shall
be brought on site after approval. (The pipes shall be laid in grade as per instruction.)Contractor shall have to
procure bills for standard pipes.
The joints shall be done in cement proportion 1:1 (1 part cement: 1 part sand) using spun yarn dipped in hot
asphalt and caulking tools. The hydraulic pressure test shall be given to the contractor for testing pipes and
jointing. No trenches shall be filled without the approval of the engineer in charge.
The rate of the pipe work are including of excavation and refilling. The excavation etc. shall be done as
Excavation: The sewer trench shall be excavated to the alignment and gradient shown on the plan and section.
In all sorts of soil including old masonary, asphalt roads and wet excavation. The sewer excavation shall be
commenced at the down stream end of the sewer and be continued up to the gradient as directed. The trench
shall not open more than 60 mts. in advance of the completed sewer only when directed by the engineer in
charge looking to the progress of the work in obtaining the formation of the bottom of the trenches the usual
methods of using sign rails and boning roads shall be adopted during the whole of the process. The centre line of
uniform height shall be carried clearly on each rail. The depth of the excavation and invert of the sewer shall be
checked by means of boning road of approved length and also by straight edge. The bed of the trench shall be
well rammed before starting laying of sewer lines and cement concrete and masonary work.
Where trenches are deep in bad grounds the sides shall be supported by suitable timbering of shorting
work looking to the nature of the soil near big or important structure, the sides of the trenches shall be closely
and securely timbered, if any settlement of the buildings in anticipated the timbering shall be left in the ground.
The various materials excavated shall be separately stacked so that in refilling that may be relayed on the same
order as before and least possible damage shall be done carpet on the public roads and private properties.
Surface covering consisting of asphalt carpet shall be kept on side and preserved for reinstatement. The
excavated earth shall not be heaped near the trenches so as to caused unnecessary obstruction along the
trenches during inspection trenches etc. shall be tunneled under only as necessary. The side of the trenches
shall be nearly vertical and plumb and red light shall be placed at each end at intervals and instructions and
further protected by rope fence. Necessary caution boards shall also be created and as directed by the engineer
Wherever possible material excavated from the trenches of whatever kind shall not be placed nearer
than three meters from the outer edge of the excavated trenches. The utmost shall have to be taken in refilling
the trenches so that no damage may be done no sewer, no lump shall be allowed to be put around the sewer.
The ramming of the filling shall be done and well watered.
The surplus earth shall be removed directed within 30 meters lead. The measurements of the work shall
be exact length and width of the trenches as specified or as per City Engineer instruction and depth shall be
measured vertical as per section up to invert or the pipeline. The City Engineer reserves the right of extra
excavation on either side if considers necessary for the safety of the work.
The bottom and sides of the trench shall be dressed in level and plumb in all directed before any
concrete is in dia. In case the excavation is done deeper than required no filling shall be allowed to bring the
formation to proper level but contractor shall have to lay cement or lime concrete of filing or other acceptable
materials as directed by the City Engineer at contractor own cost so as to come to proper formation. In case bad
formations are met with the work shall have to be done as per instruction of City Engineer. Necessary
arrangements for watering trenches must be provided by contractor and without proper watering trenches will not
be allowed to be filed to further Contractor shall have to make arrangement for access to invert of the sewer and
for inspection of the work as ordered by the engineer. If it is required to shift or after the alignment section of
diameter of the pipe the contractor shall carry out the altered work at the rates quoted by him for the original work
for items and contractor shall not claim any expenses due to the changes made.
In no case work shall be done at night or no Sundays & other holidays and during the recess time except
in and other holiday the case of bad grounds such as running sand where the work must be executed vigorous
day night without interruption when so ordered by the engineer. All existing water pipe storm drains sewer line
railway track, electric cables etc. which do not in the opinion of engineer required to be changed in location shall
be supported and protected from injury by the contractor. The contractor shall be liable to pay all damages to
water-pipe, drains electric and telephone cable and to private property during the execution of this contract and
the same will be recovered from the running bills or the deposit of work change location of any existing sewers
drains etc. not otherwise from in these specification the contractor shall do the work of making such change and
the work shall be paid for as extra work. All places utility etc. shall be kept accessible for use.
No extra payment shall be made for land sides and side stops done without prior approval of the engineer in
The excavation of trenches shall be done foot wider on each side of the pipe than the inside diameter of
the sewer in case of depth excavation exceeding 3 meters above invert, one feet wider excavated on either side
for the upper depth above 3 meters shall be allowed and paid for. Wherever natural soil demands winder
excavation the mentioned above the same shall be given after approval of City Engineer. The rate for excavation
for easy jointing and caulking nothing extra shall be paid for this. Refilling of trenches shall be done only after the
grade of line and hydraulic test practicable of the lines are checked and approved of and order given by the
Engineer in charge. The refilling shall be accompanied by through watering for layers of 0.50 mtrs. Further
refilling shall be done thereafter and process should be repeated till trenches are completely refilled. Temping
and ramming with rammers shall have to be done at all place of important work where ordered by Engineer in
charge. After order to refill the trench is give the trenches shall have to be refilled within 4 days with complete
watering. If the contractor fails to do watering satisfactory corporation shall get it done at the risk and cost of the
contractor with or without giving any notice and the expenses incurred in doing so recovered from the contractor
either in cost or from his payment through bills.
The rate shall be per meter basis.
The rate per Cmt. in this item shall be paid extra addition to the rate for excavation
Constructing Chamber of following size including excavation, refilling, BBCC (1:5:10) for foundation,
C.C.Channel (1:2:4), finished 15 mm thick cement plaster inside in CM 1:3, finishing with cement slurry,
Brick masonary in CM 1:5 & excluding the cost of chamber seat cover etc..completed.
(A) 0.60 X 0.45 mt. size Inside Clear, Depth from 0.0 to 0.90meter for pipe dia <=150mm.
(B) 0.60 X 0.75 mt. size Inside Clear, Depth from 0.0 to 0.90meter for pipe dia <=20 mm.
(C) 0.75 x 0.75 mt. size Inside Clear, Depth from 0.0 to1.20 meter for pipe dia <=150mm.
(a)Excavation : This be done as specification in Item No.
(b)Brick bats Cement Concrete:-
: Cement used shall be got approved by the enginre in charge be fore starting the work this shall comply with
specification in general.
Sand to be used should comply with specification of P.W.D. hand book in general.
Brickbats to be used for concrete must be thoroughly well burnt and free fromany impurities and
size from 20 to 25 m.m.
The preparation of concrete shall be one part of cement 5 part of sand & 10 part broken brickbats.
Brickbats must be perfectly clean from inprutes and shall be throughly wetered be for mixing and mixed
properly on wooden or specially propared platform until every part of the brockbats is sufficently coated with
Concrete must always be used fresh it shall be laid in layers as directed never exceeding 20 kms. in
thickness and be well and quickly rammend with heavy rammers, until mortar creams up to surface. The
surface must be kept damp during and after consolidation & in laying consecutive layer the lower coars
should be well watered & mode lough be for the next is placed.
(c)Brick work with cement mortar .
Brick shall be table bricks of approved clean conforming with the specification as laid down in P.W.D. hand
book No.2 The brick shall be wellburnt and free from any defects shall be got approved by the Enginur in charge
be fore the work is started.
Cement to be used for mortar shall comply with I.S.S. & P.W.D. hand book specifications cement mortar for
the brick work shall be one parts of cement to six part of sand every brick well soaked in water is required to be
ladi in joints of cement mortar the thickness of which shall not exceed paints of 1.25 cm If after removal of
centering any open joints are founed these shall be pointed immedately.
Special care shall be taken to make the faces of brick work smooth brick work mar be toothed or shall be
racked back in course.
All intrados of curse be worked from compete strickly made to dimensions and grade.
Brick work in general shall be of first class workmanship and shall be excuted according to plan working to
the proper dimension & as directing by the officer in charge from the time to time bricks should be throughly in
water be fore use. All bricks shall Ihave to be cleaned water be fore laying cement mortar shall be prepared in
special iron pans and mixed in quantites as required using measurs boxes for sand and cement bag of 1.25 cft.
or 1 cft. as measured the case may be all materials shall be stacked on the site as not to obstruct tra fic in any
way the masonary should be constructed in proper workmanship like manner with joints plunb etc. to conform
with general specification No.45 P.W.D hand book. The face work should be neatly finished. The work shall be
keptwaterd for work at least after date of completion.
(d)C.C. channels.
Cement concrete for the inverts and channels of manholes shall consist of one parts of cement 2 parts of
sand 4 part of aggregates of black trap metalof other approved material of sizes from 0.6 to 2.5 cm. well graded
as per instructions.
The work shall be as per P.W.D hand book specification No.20 as per general instructions. The rate includes
all necessary materuals mixing laying and remain and watering the exposed faces tobe finished with neat cement
as per instruction the channel shall be half round and as per drawing & instruction of Engineer in charge. proper
bunching shall be provided at both of the channel.
(e)Cement plaster.
Cement plaster 15 M.M. shall be done using cement mortar of 1 part cement and 3 parts of sand in uniform
thickness with surfaces truely in plumb. The work in general shall comply with general specifi cations for )plaster
no.64.P.W.D. hand book plastered surface shall kept damp at least for fortnight.
All internal surfaces of the manholes including soft to arch shall be provided with cement plaster.
Manhole shall be provided at every change of alignment, gradient or diameter of sewer/storm water drains,
Bends and junctions in the sewer/drain shall be grouped together in manhole as far as possoble. The maximum
distance between inspection chambers shall be about 25 meters. Where the diameter of sewer/drain is
increased, the soffit of the pipe shall be fixed at the same level and necessary slope given to the channel of
manhole/inspection chamber. The minimum internal sizes of manhole/inspection chamber shall be as per the
respective item of work. The manhole/inspection chamber shall be constructed as per the detailed drawings and
as directed by Engineer. The bed concrete and the brick masonry shall be constructed of such thickness as
shown on drawing. The brick masonry shall be constructed in C.M. (1:5), plastered on both faces inside and out
side with 15 mm cement plaster in C.M. (1:3). The channel shall be semicircular in the bottom half and of
diameter equal to the sewer/drain. Above the horizontal diameter, the sides shall be extended vertically to the
same level as the crown of the outgoing pipe and the top edge shall be suitable rounded off. The branch
channels shall also be similarly constructed with respect to the benching out at their junction with the main
channel as appropriate fall suitable rounded off in the direction of flow in the main channel shall be given. The
channel at the bottom of manhole / inspection chamber shall be plastered with C.M. (1:3) and finished smooth.
Rungs shall be provided in all manholes/inspection chambers over 0.6 mtr in depth and shall be of cast iron
conforming to IS:5455. These rungs shall be fixed staggered in two vertical runs, 300 mm apart horizontally and
300 mm c/c vertically. The top rung shall be 450 mm below the manhole/ inspection chamber cover and the
lowest not more than 300 mm above the benching. The manhole/inspection chamber frame and cover shall be of
cast iron of specified weight and shall conform to the requirements given in IS:1726. The covers and frames shall
be cleanly cast and they shall be free from air and sand holes and from clod shuts. They shall be neatly dressed
and carefully trimmed. All castings shall be free from voids whether due to shrinkage, gas inclusion or other
causes. Covers shall have a raised chequered design on the top surface to provide an adequered nonslip grip.
Cover shall be capable of easy opening and closing and it shall be fitted in the frame in workmanship like
manner. The cover shall be gas tight and water tight. The size of covers specified shall be considered as the
clear internal dimensions of the frame. Covers and frames shall be coated with a black bituminous composition.
The coating shall be smooth and tenaceous. The frame of manhole/inspection chamber cover shall be firmly
embeded to correct alignment and level in cement concrete on the top of the masonry. The item shall be
executed as per the detailed drawing and as directed by Engineer.
Design and Details of Reinforcement for the slab shall be approved before casting work or as directed by
engineer in charge or Additional City Engineer (zone)
Mode of measurement:
The rate shall be for a unit of one number basis
Constructing Slab Type M.H. Chamber Of The Following Size Including Excavation, Refilling, Brick Bats
Cement Concrete (1:5:10) of thickness 15 C.M., CC Channel (1:2:4) of thickness 10 C.M., finished 15 mm
thick cement plaster inside & outside (Only for shaft) In Cm 1:3, Finishing With Cement Slurry, P/F 4 Mm
Dia M.S.Steel Hdpe Coated Steps 35 Cm C/C At 35 Cm Staggered Masonary In Cm 1:5, Rcc Slab In
Cc1:1.5:3 of thickness 15 C.M.,Including Cantering & Reinforcement (Single jalli at 15 C.M. c/c bothway
10 mm dia.)But Excluding The Cost Of Manhole Seat Cover Etc..Completed Of Size 0.75 X 1.00 Meter
(Inside Clear, M.H. length should be parallel to the flow)
1) 1.00 to 2.00 meter depth, (Slab at Ground level) (for pipe dia <=230 mm)
2) 2.00 to 3.00 meter depth, (Slab at below 0.60 mt. From G.L.) (for pipe dia <=300 mm)
(a)Excavation : This be done as specification in Item No.
(b)Brick bats Cement Concrete:-
: Cement used shall be got approved by the enginre in charge be fore starting the work this shall comply with
specification in general.
Sand to be used should comply with specification of P.W.D. hand book in general.
Brickbats to be used for concrete must be thoroughly well burnt and free fromany impurities and
size from 20 to 25 m.m.
The preparation of concrete shall be one part of cement 5 part of sand & 10 part broken brickbats.
Brickbats must be perfectly clean from inprutes and shall be throughly wetered be for mixing and mixed
properly on wooden or specially propared platform until every part of the brockbats is sufficently coated with
Concrete must always be used fresh it shall be laid in layers as directed never exceeding 20 kms. in
thickness and be well and quickly rammend with heavy rammers, until mortar creams up to surface. The
surface must be kept damp during and after consolidation & in laying consecutive layer the lower coars
should be well watered & mode lough be for the next is placed.
(c)Brick work with cement mortar .
Brick shall be table bricks of approved clean conforming with the specification as laid down in P.W.D. hand
book No.2 The brick shall be wellburnt and free from any defects shall be got approved by the Enginur in charge
be fore the work is started.
Cement to be used for mortar shall comply with I.S.S. & P.W.D. hand book specifications cement mortar for
the brick work shall be one parts of cement to six part of sand every brick well soaked in water is required to be
ladi in joints of cement mortar the thickness of which shall not exceed paints of 1.25 cm If after removal of
centering any open joints are founed these shall be pointed immedately.
Special care shall be taken to make the faces of brick work smooth brick work mar be toothed or shall be
racked back in course.
All intrados of curse be worked from compete strickly made to dimensions and grade.
Brick work in general shall be of first class workmanship and shall be excuted according to plan working to
the proper dimension & as directing by the officer in charge from the time to time bricks should be throughly in
water be fore use. All bricks shall Ihave to be cleaned water be fore laying cement mortar shall be prepared in
special iron pans and mixed in quantites as required using measurs boxes for sand and cement bag of 1.25 cft.
or 1 cft. as measured the case may be all materials shall be stacked on the site as not to obstruct tra fic in any
way the masonary should be constructed in proper workmanship like manner with joints plunb etc. to conform
with general specification No.45 P.W.D hand book. The face work should be neatly finished. The work shall be
keptwaterd for work at least after date of completion.
(d)C.C. channels.
Cement concrete for the inverts and channels of manholes shall consist of one parts of cement 2 parts of
sand 4 part of aggregates of black trap metalof other approved material of sizes from 0.6 to 2.5 cm. well graded
as per instructions.
The work shall be as per P.W.D hand book specification No.20 as per general instructions. The rate includes
all necessary materuals mixing laying and remain and watering the exposed faces tobe finished with neat cement
as per instruction the channel shall be half round and as per drawing & instruction of Engineer in charge. proper
bunching shall be provided at both of the channel.
(e)Cement plaster.
Cement plaster 15 M.M. shall be done using cement mortar of 1 part cement and 3 parts of sand in uniform
thickness with surfaces truely in plumb. The work in general shall comply with general specifi cations for )plaster
no.64.P.W.D. hand book plastered surface shall kept damp at least for fortnight.
All internal surfaces of the manholes including soft to arch shall be provided with cement plaster.
Manhole shall be provided at every change of alignment, gradient or diameter of sewer/storm water drains,
Bends and junctions in the sewer/drain shall be grouped together in manhole as far as possoble. The maximum
distance between inspection chambers shall be about 25 meters. Where the diameter of sewer/drain is
increased, the soffit of the pipe shall be fixed at the same level and necessary slope given to the channel of
manhole/inspection chamber. The minimum internal sizes of manhole/inspection chamber shall be as per the
respective item of work. The manhole/inspection chamber shall be constructed as per the detailed drawings and
as directed by Engineer. The bed concrete and the brick masonry shall be constructed of such thickness as
shown on drawing. The brick masonry shall be constructed in C.M. (1:5), plastered on both faces inside and out
side with 15 mm cement plaster in C.M. (1:3). The channel shall be semicircular in the bottom half and of
diameter equal to the sewer/drain. Above the horizontal diameter, the sides shall be extended vertically to the
same level as the crown of the outgoing pipe and the top edge shall be suitable rounded off. The branch
channels shall also be similarly constructed with respect to the benching out at their junction with the main
channel as appropriate fall suitable rounded off in the direction of flow in the main channel shall be given. The
channel at the bottom of manhole / inspection chamber shall be plastered with C.M. (1:3) and finished smooth.
Rungs shall be provided in all manholes/inspection chambers over 0.6 mtr in depth and shall be of cast iron
conforming to IS:5455. These rungs shall be fixed staggered in two vertical runs, 300 mm apart horizontally and
300 mm c/c vertically. The top rung shall be 450 mm below the manhole/ inspection chamber cover and the
lowest not more than 300 mm above the benching. The manhole/inspection chamber frame and cover shall be of
cast iron of specified weight and shall conform to the requirements given in IS:1726. The covers and frames shall
be cleanly cast and they shall be free from air and sand holes and from clod shuts. They shall be neatly dressed
and carefully trimmed. All castings shall be free from voids whether due to shrinkage, gas inclusion or other
causes. Covers shall have a raised chequered design on the top surface to provide an adequered nonslip grip.
Cover shall be capable of easy opening and closing and it shall be fitted in the frame in workmanship like
manner. The cover shall be gas tight and water tight. The size of covers specified shall be considered as the
clear internal dimensions of the frame. Covers and frames shall be coated with a black bituminous composition.
The coating shall be smooth and tenaceous. The frame of manhole/inspection chamber cover shall be firmly
embeded to correct alignment and level in cement concrete on the top of the masonry. The item shall be
executed as per the detailed drawing and as directed by Engineer.
Design and Details of Reinforcement for the slab shall be approved before casting work or as directed by
engineer in charge or Additional City Engineer (zone)
Mode of measurement:
The rate shall be for a unit of one number basis
Repairing damaged M.H. incl. removing damaged brick and repairing by masonry in C.M. 1:5 and plaster
in C.M. 1:3 and fixing C.I. steps and M.H. and carting the same as directed.
A)………………do………………. Up to 0.15 mt. ( @ Two coarse)
B) ………………do……..………… Up to 0.35 mt. ( @ Four coarse)
C)………………do…………………Up to 0.65 mt. ( @ Seven coarse)
D)………………do…………………Up to 0.90 mt. (@ Ten Coarse )
Repairing damaged I.C./ Raisin removing damaged brick work and repairing by brick masonry in C.M.
1:5 and plaster in C.M. 1:3 and fixing C.I. steps and existing chamber sheet cover, removing the
debris from chamber and carting the same as directed.
Required level shall be achieved in brick work as specified including plaster, the thickness of joints shall not
exceed 10 mm (3/9”). In no case the frame shall be supported by chips or broken brick or asphalt mix.
All frame of manholes, and chambers etc. shall be kept flush with the general surface of an asphalt
road/concrete pavement. The frame shall be bedded in cement mortar on the brick work with splayed filler all
Water: Gully frames being on the edge of road shall be fixed to the correct road level at its upper end and the
slope should be such it must be about (12 mm) (1/2”) lower than water table.
A concrete pavement should be case around the frames and covers of man-holes, chambers etc. in case
of asphlatic road.
The space around circular frame and covers shall be fully paved with c.c. (1:2:4) as specified and
directed. The pavement shall be at least 8 mm (3”) wider than the outer most edge of the circular frame no
pavement will be made of this pavement under the item of cement concrete.
The space to be paved around hydrant or sluice boxes shall be 1.6 m x 1.5 m (5’ x 5’) in external
measurement and in case if gas siphon or chamber 91 cm x 61 cm (3’ x 2’) the longer dimension being along the
direction of the main.
In case of rectangular frame cover it shall paved as directed by Engineer with 1:2:4 C.C. No payment will
be made for the pavement should be at least 8 cm (3”) wider than the outer most edge of the frame.
After removing the top portion of the manholes, the proper brick masonry layer with c.m. (1:4) should be
constructed for proper bondage with old masonry and 8 cms thick PCC work (1:2:4) should be laid on the top of
brick layer an up to the bottom of the seat. After fixing the seat the manhole should be properly leveled with road
Filling with cement concrete the spaces around the manholes, chambers, etc. shall be clean within
hours of concreting day.
M/S shall be given on No basis
Chairs:-Supply and Fixing of Fillowing Item of Auditorium seating Fabricate Auditorium seating with
Synchronized Tip Up Chair Urethane foam for seat and back made my DOW chemical with High Pressure
moulding technology to achieve long life performance, upholstered with stitched 3 Layer 100% Yarn
Dyed fabric Upholsteries. Chair profile with the seat in Normal position and without a tablet arm should
not be more than 75 cm. Tip Up Chair should which is Dia 8 mm Barrel MS Rivets.The CRCA compliance
to IS 513.The Seat Size should be 42 cm x 48 cm the Back height should be 70 cm with ergonomically
designed seat and back cushions. Chair should be of existing available Size.(Including Welding,Fitting
and Transportation)
(a) Good Quality Washable Dubback chairs cloths of any Colour
Mode of measurement:
The rate shall be for a unit of one No.basis
(b) Mould of Seat & back (50 mm Seat & 75 mm Back)
Mode of measurement:
The rate shall be for a unit of one Set basis
(c) Fibre Seat & back (21 X 21 inch Seat & 28 X 21 inch Back)
Mode of measurement:
The rate shall be for a unit of one Set basis
(d) Top of handle With Cup Holder fibre handle
Mode of measurement:
The rate shall be for a unit of one No.basis
(e) labour Work Fitting Spring and Repairing Seat Micanisium Road for Tie Up Chair
Mode of measurement:
The rate shall be for a unit of one Set basis
(f) labour Work Repairing Side fitting Clamp including if Require Necessary Welding For Chair Support
Mode of measurement:
The rate shall be for a unit of one Set basis
Supply and Fixing of Auditorium seating Fabricate Auditorium seating with Synchronized Push back
Chair with Ergonomically designed Poly Urethane foam for seat and back made my DOW chemical with
High Pressure moulding technology to achieve long life performance, upholstered with stitched 3 Layer
100% Yarn Dyed fabric Upholsteries. Chair profile with the seat in Normal position and without a tablet
arm should not be more than 75 cm.Chair pushback mechanism should consist of 2 nos. x DIA 50 mm
ZYTEL Based Rollers which is supported by AXIAL shaft of DIA 12 mm is Driven by radial movement of
set of Swing Arms of size 25mm x 6 mm or Simillar thickness with Orbital Riveted Solid Dia 8 mm Barrel
MS Rivets. The pushback movement is achieved by synchronised movement of 04 links mounted on Two
Number of triangular Symmetrical housing of size 27 cm x 23 cm duly Simillar embossed for extra
strength by 1.2 cm made up by 0.12 cm CRCA compliance to IS 513. The entire mechanism should be
made in India and should have total weight 8.5 kg duly Powder Coated – NO SPREAY PAINT Part should
be used for the chair of The Seat Size should be 42 cm x 48 cm Simillar the Back height should be 70 cm
Simillar with ergonomically designed seat and back cushions,Chair should be available in 20”, 21”, 22”
and 23” to use multiple seat size in one layout for matching variable arch length Or Simillar Relaxable
Size & Design Valid/Applicable/Provide instead of All Detail Dimention and All Over Size of Chair &
(Including Fitting and Transportation)
Mode of measurement:
The rate shall be for a unit of one No.basis
Applying one coats of Enamel Paint of approved brand and manufacture on Road MH/CP. Rate including
thoroughly brushing the surface free from dust. Rate Includes Rent for Chota hathi/Tempo for Material
Carting/shifting, Traffic Diversion & Necesary Prection works on road etc. Comp. as per Instruction of
Engg. In Charge.
Mode of measurement:
The rate shall be for a unit of one No.basis
Applying priming coat Over Kerb Surface after and including Preparing the Surface With Ready Mixed
Priming Paint Brushing red Lead.
Mode of measurement:
The rate shall be for a unit of one Smt basis
Painting Two Coats on divider and footpath curb surface / New Concrete Surface (Painting two coats
after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces)
Mode of measurement:
The rate shall be for a unit of one Smt basis
Providing & laying average (25 to 30 mm thick ) machined/hand cut green Rough kota (river wash) of
approved quality, selected and sorted for uniform color & texture, in floor, otta, landing, tread, riser,
ramp, sill, skirting, channel etc., in following sizes as per design (normal pattern straight or staggered
joint with square or rectangular shaped stone) and drawings (with grooves of 10mm wide or without
grooves). Kota stone is to be laid over cement mortar 1:4 bedding of average 20 to 30 mm thickness as
per drawing with joints, pointing and finishing and filling the grooves with CM 1:2 including curing and
cleaning with wire brush to remove excess cement on the sides of stone up to the satisfaction of the
Architect & Engineer-in-charge. The rate shall also include necessary chamfer/ rounding the edge as per
(a) Upto 600 mm X 600 mm ( River Wash) from 600mm on words.
Mode of measurement:
The rate shall be for a unit of one Smt basis
P/A Tremix with dewartering machine and floater machine on constructed CC work for finishing the
surface as per requirement. The rate including all machinaries, labor, loading, unloading, transportaion
etc complete as per direction given by engineer in charge.
Mode of measurement:
The rate shall be for a unit of one Smt basis
Providing,Cutting,bending and fixing in any size and shape 2 mm thick FRP sheet shade including HILTI
SDST screw,washer,hardware fitting,silicon sealent water proofing material etc.comp.as directed.
Mode of measurement:
The rate shall be for a unit of one Smt basis
Providing & Fixing Steel Door With Shutter For Steel Sheet 18 Gauge, And Angel And 40 X 40 X 3mm
And Steel Doors Frame Of Size 40 X 40 X 5 Mm Incl. Anodised Iron Butt Hinges And Nece.Fitting And
Fastening With Necessary Screws.Rate Also Incl. Two Coats Of Oil Paint Etc Comp.
Mode of measurement:
The rate shall be for a unit of one Smt basis
Providing corrugated G.I. sheet of class-3 roofing fixed with glavanished iron J or L Hooks, Bolts and
nuts 8mm diameter with bitumen and G.I. limpet washer or G.I. limpet washer. filled with white lead
complete excluding the cost of purlins, Rafters and Trusses.(1) 0.80 mm thick sheet.
1.0 Materials: Corrugated G.I. sheets shall conform to M-24.
2.0 Workmanship :
2.1 Spacing of pulines: One purlin shall be provided at the ridge and one at the eaves. The spacing of other
purlines for 0.8 mm. thick G.I. sheet not exceed 1.80 metres. The purlin shall coincide with the centre line
of the end lap. The ridge purlin shall be places in such a way that the ridges can be fixed properly.
The portion overhandling the wall support shall not be more than one fourth of the spacing of purlins.
2.2 The top surface of the purlines shall be painted before the sheets are fixed over them. Embedded
portions of purlins shall be finished with two coats of coat-tar.
2.3 Laying of Sheets :
2.3.1 The sheets shall be laid in purlins to a true plane with the line of corrugations truly parallel or normal to
the sides of area to be covered. The sheets shall not generally be built into gable parapets. They shall be
bent up along their side edges close to the wall, and the junction shall be protected by suitable flushing
or by projecting drip course.
2.3.2 The laps at end shall be provided 150 mm. minimum for roof slopes 1 in 2 (1 vertical: 2 horizontal) and
steeper but 200 mm. shall be provided for flatter slopes than those shall above. The side lap shall be
provided two ridges of corrugations at each side.
2.3.3 The sheets shall be cut to the dimensions of the shape of the roof either along their lengths or their width
or in slant across the line of corrugations at hips and valleys. The sheets shall be cut carefully with a
straight edge and chisel to give a straight finish. The sheets shall be laid such that the laps are turned
away from the usual direction of local heavy rain.
2.3.4 Fixing of Sheets :
2.3.4.1 Sheets shall be fixed to the purlins or other roof members such as hips of valley rafter etc. with ‘J’ or ‘L’
galvanized hook bolts, and galvanized nuts 8 mm. dia, with bitumen impet washers and G.I. washers.
Limpet washers with white lead shall be used. Length of hook bolt shall be varried to suit the site
requirement. Bolts shall be sufficiently long so that after fixing the project above the top of their nuts by
not less than 12 mm. the grip of ‘J’ or ‘L’ hook bolts on the side of purlins shall not be less than 25 mm.
There shall be minimum of three hooks bolts places at the ridge of corrugations in each sheets in every
purlin, and their spacing shall not exceed 300 mm. coach screw shall not be used for fixing the sheets to
purlins, where the slopes of roof are not less than 2 2 horizontal). (1 vertical: 2 2 horizontal). Sheets
shall be jointed together at the side laps by galvanized iron bolts and nuts 25 mm. x 6 mm. size, each
bolt with a bitumen and G.I. limpet washer filled with white lead. Where the overlaps at the sides extend
to two corrugations these bolts shall be places zigzag over the two over lapping corrugations, so that the
end of the overlapping sheets are drawn tightly towards each other. The spacing of same bolts shall not
exceed 600 mm. along each of the staggered rows.
2.3.5 Holes for all bolts shall be drilled and not punched in the ridges of the corrugations from the under side,
while the sheets are on the ground. The holes in the sheets shall be atleast 50 mm. from the edge.
Sheets drilled wrongly shall be rejected. The holes in the washers shall be of the exact diameter of hook,
bolts or the scam bolts. The nuts shall be tightened from above to give a leak proof roof.
2.3.6 The roof when complete shall be trues to lines and slopes and shall be lead-proof.
3.0 Mode of measurements & payment :
3.1 The measurements of the C.G.I. sheet roof shall be taken for finished work in superficial area in general
plane (not girthed on the roof). The laps between the C.G.I. sheets both at their ends and along the side
edges shall not be measured. The overlaps of C.G.I. sheets over the valley piece underlap under the
ridge, hip and flashing piece shall be included in the measurements.
3.2 No deductions in measurements shall be made for openings for chimney stacks, sky light etc., of area
upto 0.40 sq. mt. Nor extra be paid for extra labour in cutting and for wastage etc., in forming such
3.3 The rate of roof shall include the cost of all materials and labour involved in all operations described
above. The rate also includes the cost of provision, erection and removal of the scaffolding, benching,
ladders, templates and tools required for the proper erection and completion of the work. The rate
includes the cost of purlines, rafters and trusses.
The rate shall be for a unit of one sq. metre.
P/M/F chainlink jali 8’ x4’ size asper details sketch & instruction ofengineer in charge same asLaldarwaja
garden pattern consistingof 3’ dia. M.S. black pipe ‘A’ class 5’4" ht. fixed at 8’9” c/c in CC 1:2:4 block of
9”x9”x9” size chainling jali of size 2” x 2” x 10 gaugefixed in 35x35x 5 mm MS angleframe 8’x4’ size with
MS flat of size 25x3 mm welded with jali etc.comp. The jali is to be welded to MS pipe with MS flat
asinstruction given.The MS pipe andthe MS angle frame are to be painted one coat of primer and
twocoats of paint as directed inline and level.
Mode of measurement:
The rate shall be for a unit of one Rmt basis
Renovation and Repairing work in Chainlink fencing any size and also refixing work incl. febrication work
with all materails to be painted one coat of primer and twocoats of paint as directed inline and level.
Mode of measurement:
The rate shall be for a unit of one Rmt basis
Providing and fixing 1.20 Metre high fencing with2.0M etrelong M.S.Angle posts 40mmx40mmx6mm and
oilpainting 3coats fixedat2.5Mt,C/c.with five Horizontanline sand two diagonals of galvanised steel
barbed wirew eighting 9.38Kg.per 100Metre, strained and fixed to posts with G.I,staples including fixing
the postsin round with 0.5x 0.5.x 0.5.block in CC 1:5:10 etc. complete.
Mode of measurement:
The rate shall be for a unit of one Rmt basis
Providing and fixing Roller Blind curtain fixed on window level on wooden batten and curtain lift with
cotton thin rope,make of arolax or equivelent design and colour as per instruction by engineer in Charge
with necessary hardware fitting, material and labour etc complete.
Mode of measurement:
The rate shall be for a unit of one Smt basis
Box type metal letters forming composite box made from 1mm thick stainless steel plate of grade
having brush finish of following font size to be fixed at Main Gate in english and or Gujrati and including
fixing charges approved before fixing by clent / consultant.
Mode of measurement:
The rate shall be for a unit of one Smt basis
Mode of measurement:
The rate shall be for a unit of one Smt basis
(C.) 230mm high
Mode of measurement:
The rate shall be for a unit of one Smt basis
Applying two coats of Roof Coat water based Exterior Paint of approved brand and manufacture on Exi.
Road Surface with proper line Rate including thoroughly brushing the surface free from dust. Rate
Includes Rent for Chota hathi/Tempo for Material Carting/shifting,Traffic Diversion & Necesary Prection
works on road etc. Comp. as per Instruction of Engg. In Charge.
Mode of measurement:
The rate shall be for a unit of one Smt basis
Providing & Fixing Door hinge spring include with necessary all fixtures as dircted by engg.in charge
Mode of measurement:
The rate shall be for a unit of one Smt basis
Labour charges for removing of Alum. Door /partition/Alum. Window/MS Grill etc.
Mode of measurement:
The rate shall be for a unit of one Smt basis
P/F 10 mm thick Novapan sheet of approved quality including fixing on partition with necessary all
fixtures as directed by engg.in charge etc.comp
Mode of measurement:
The rate shall be for a unit of one Smt basis
Providing & Fixing Floor Spring including fixing shutter etc. complete as per inst. of engineer in charge.
Mode of measurement:
The rate shall be for a unit of one No.basis
Providing & Fixing in position Fully Panelled / Partly Panelled Partly Glazed / Fully Glazed
Alluminium doors with frame using approved quality anodised extruded alluminium section
as approved by Engg. In charge.(Jindal alluminium )(a) Frame sections 101.6x44.45 mm b) Shutter
vertical & top section 83.5x44.45 (wt. 1.31 kg/mt.)( at 1.31 kg/mt) © Shutter bottom section at
114.3 x44.45mm at ( 1.37 kg/mt ) Shutter middle section at 100x44.3 wt. (1.37 kg/mt ) incl. providing
& installing 5 mm thick Glass of standaed quality fixed / 12 mm thick Laminated sheet with
glazing chips (wt. 0.13 kg/ Rmt) in panels etc. comp. as per Detail Given & direction of engg.in
Mode of measurement:
The rate shall be for a unit of one Smt basis
Providing & Fixing in position Alluminium window 2/3/4 track sliding/fix type with frame using
approved anodised extruded alluminium section as approved by Engg.In charge. (Jindal alluminium)
units equivalent.including P/F installing 5 mm thick clear/tinted Glass of standard quality etc.comp.
Mode of measurement:
The rate shall be for a unit of one Smt basis
Providing and fixing Aluminum Composite Panel signages of various size and in any language. The 2 mm
thick Aluminum composite panel shall be cladded with retro reflective high intensity grade radium
sheets. The signages shall be of any language
Mode of measurement:
The rate shall be for a unit of one Sq.inch basis
Providing & Fixing Alluminium Composite Panel of approved make of 4 mm thick Exterior Grade PVDF
with coil thickness 0.25 mm & Frame work made out from Alluminium anodised section of size 50x25 mm
having weight of 2.6 kg. for 15'-0 supported on Masonary/ R.C.C. with the help of MS bracket fixed with
Brick Fastener / Anchor Fastener & Groove Filled with 789 weather fillent of Dowl corning corporation
Mode of measurement:
The rate shall be for a unit of one Smt basis
Providing & Fixing Stainless steel 304 grade 50mm outer dia meter 14 guage Railing with 2 nos horizontal
& 1.20 mt. clear vertical pipe 1 mt. c/c with buffing SS pipe. including cutting, bending fixing in position
and Fixing SS Article cap in bottom of pipe. Rate also includes Fixing pipe in bottom with flling material
of bombay masala etc. Complete as per the instruction of engg. in charge
Mode of measurement:
The rate shall be for a unit of one Rmt basis
Providing and fixing eco friendly light weight calcium silicate false ceiling tiles having Tegular edge &
15mm Thick Densified edges on the Tile Periphery for Extra Strength The Light weight calcium silicate
ceiling tiles shall have, light reflection 85% non-combustible as per B.S. 476 part IV, 100% humidi ty
resistance and also having thermal conductivity 0.043° w/mKC. for the best thermalInsulation. The Light
weight calcium Silicate tile shall be of approved texture Finefissured /Spintone/ Cosmoshaving NRC
value of 0.5 & Globe having NRC value of 0.75 NR Core quivalent of size 595 X 595 mm to be laid on true
horizontal level suspended interlocking metal grid of hot dipped galvanized steel sections (galvanizing @
120 grams per sq m including both side) consisting of main‘ T’ runner suitably space dat joint stoget
required length and size of 24X38 mmm ade from 0.30 mm thick (minimum) sheet, 1200 mm centret
ocentre ,andcross ‘T’ of size 24X28 mm made out of 0.33mm (Minimum) sheets paced 1200 mm along
spaced between main ‘T’ at 600 mm centre to centre to form agrid
Mode of measurement:
The rate shall be for a unit of one Smt basis
Uncoursed Rubble masonary with hard stone of approved Quality in foundations and plinth in cement
mortar 1:5 (1 cement: 5 coarse sand including levelling up etc.complete
Mode of measurement:
The rate shall be for a unit of one Cmt basis
Extra over item above for super structure above plinth level up to floor two level
Mode of measurement:
The rate shall be for a unit of one Cmt basis
Suplying of 65x65x2.5 mm thk Galvanise Chainlink Jali For existing frame & fixing jali on Comp. wall Etc.
Complete as per the instruction of engg. in charge
Mode of measurement:
The rate shall be for a unit of one Smt basis
Suplying of 20x20x2mm thickness MS jali For existing frame & fixing jali on Comp. wall Etc. Complete as
per the instruction of engg. in charge
Mode of measurement:
The rate shall be for a unit of one Smt basis
Labour work for fixing any kind of paving with cement pointing in CM 1:2, including watering, ramming
etc comp. as dir.
I) Laying on Sand bedding as per requirement to fix the C.C.Block / Nibhada Stone in Line & Level
Mode of measurement:
The rate shall be for a unit of one Smt basis
Filling 3mm Exi. Swimming pool tiles groove with white cement, Dr. Fixit super latex 302 SBR solution, &
water and cleaning surface after application of mortar. Rate also includes making the surface smooth
and clean after complete the work. all works done as per Instruction of engg. In charge.
Mode of measurement:
The rate shall be for a unit of one Smt basis
Fixing Johnson Endura swimming pool tiles of size 12.2 x 24.70 cm and fixing tiles in Ardex durafix gold
star high bond water resistance chemical mortar with 3mm groove. and labour work for Fixing tiles with
3mm specers and filling joints with white cement and Dr. Fixit super latex 302 SBR rate includes
desmatling old pool tiles & plaster. Rate also includes removing/ fixing damage scattered tiles in pool
area. all works done as per Instruction of engg. in Charge.
Mode of measurement:
The rate shall be for a unit of one Smt basis
Item No : 153-A
Supplying Ordinary Portland Cement (OPC) (Grade-53) Bags (50 Kg.) in road Store as per Inst of Ebgg incharge
Mode of measurement:
The rate shall be for a unit of one No.basis
Item No : 153-B
Supplying Fine Aggregate Sand in road Store as per Inst of Ebgg incharge
Mode of measurement:
The rate shall be for a unit of one Cmt basis
Supplying and installation of 10mm thick recycled rubber flooring having anti-skid and sound absorbing
properties, square shaped, with different color optns for create flooring pattern, should be installed with
proper adhesive as per manufactures's guidelines, joints of surface to be done properly to prevent dirt &
watepenetration inside the surface. etc complete as per instruction of engineer in charge
Mode of measurement:
The rate shall be for a unit of one Smt basis
Providing and applying vinyl paint at approved quality, including fixing laminate on surface, as per
manufacture's specification, finish etc complete as per instruction of engineer in charge
Mode of measurement:
The rate shall be for a unit of one Smt basis
Important Note:-
All the works Should be done as per specifications specified in Table. Item shall be executed AS PER
SITE REQUIREMENTS AND CONDITIONS AND INSTRUCTIONS GIVEN BY ENGG-IN CHARGE. All the
Specifications should be considered as R & B S.O.R & All Electrical Item works should be done as
specified in table. The works should be done as per Instruction of Engineer In Charge. All the
Specifications related to electrical works should be considered as Per R & B Electrical S.O.R. The Make
and Work Metholody of All of the above items specified in above tender Will be the Final Decision of
Engineer In Charge Or Additonal City Engineer.
As well as Considered Item Specifications as Per Item Given, not by serial number, the specifications of items
which are not mentioned in BOQ Item, Specifications should be considered as per AMC Sor Current Approved
Rates for Civil and Electrical Works, as per Available on Site of Ahmedabadcity.gov.in All the Specifications
should be Considered as per Schedules Rates of R & B Division of both civil and Electrical Works. Hence it an
ARC Tender All the Quantity Would Vary as per Instruction of Engineer in Charge. No Rate would be given Extra
for Increase or Decrease in the Quantity of The BOQ Scheduled Items.
I HAVE ALSO GONE THROUGH TECHNICAL SPECIFICATIONS FOR THE ITEMS (AS PER STANDARD
P.W.D. TECHNICAL SPECIFICATION FOR THE ITEMS AND ALSO I HAVE THE BOOK OF THE SAME) AND
AGREE TO ABIDE BY THEM.
IN CASE OF WHERE IS NO TECHNICAL SPECIFICATION FOR THE ANY ITEMS AVAILABLE,
SPECIFICATION GIVEN BY THE ENGINEER-IN-CHARGE SHALL BE FOLLOWED AND FOR THE SAME I
AGREE TO ABIDE BY THEM.
Contractor signature/Stamp Additional City Engineer
Schedule of Maintenance Works:-
On Daily Basis:- Required supervision for Different Municipal School &
Anganwadi & Ren Basera
On Weekly Basis:- Required Supervision for Different Municipal
Garden,Municipal Party Plots,Auditorium.
For Every 15 Days:- Required Supervision for Different Municipal Plots,
Hospitals,Library,City Civic Center,Sub zonal office & Other Municipal
Properties/Buildings.
Scope of Work: Schedule of Maintenance for Civil Works
The Contractor shall be responsible for the comprehensive repair and maintenance of all civil
works within the specified premises/site to ensure that all installations are kept in good, safe,
and trouble-free operating conditions at all times. The maintenance scope includes both
planned preventive maintenance (PPM) and attending to day-to-day repairs/breakdowns
(reactive maintenance).
1. Description of Works Covered
The civil works covered under this contract include, but are not limited to, the following
Building Fabric: Internal and external walls, plastering, painting, and finishes.
Structural Elements: Foundations, columns, beams, roofs, and all associated
structural steel or concrete work.
Flooring & Carpentry: All types of flooring, false ceilings, doors, windows, ventilators,
and associated hardware.
Plumbing & Sanitary: Water supply lines, drainage systems, sanitary fixtures, gully
traps, manholes, and sewage disposal systems.
External Works: Internal roads, footpaths, storm water drainage, fencing, and
boundary walls.
Specialized Areas: Waterproofing of terraces/toilets/basements, horticulture works,
and any other incidental civil works.
2. Schedule of Maintenance
The contractor shall develop and submit a detailed Annual Maintenance Plan (AMP) and
program of work for approval by the Engineer-in-Charge prior to starting work. This plan must
detail the frequency and specific tasks for each item.
2.1. Preventive Maintenance (PPM)
PPM tasks shall be carried out at specified frequencies to prevent equipment failure and
reduce reactive maintenance needs.
Frequency Typical Tasks (Examples)
Monthly/Fortnightly * General inspection of all civil assets. * Checking for leakages in plumbing
lines and sanitary fixtures. * Attending minor blockages of drain pipes and
gully traps. * Ensuring smooth operation of doors and windows, including
lubrication of hinges/locks.
Quarterly * Detailed inspection of structural elements for cracks/defects. * Testing all
drainage systems for proper flow. * Checking and minor repairs of all flooring
and false ceilings. * Repainting minor patched-up areas in walls/ceilings.
Bi-Annual/Annual * Thorough cleaning of overhead/underground water tanks. * Detailed
inspection of roofing and waterproofing membranes. * External painting and
maintenance of the building exterior and external works.
2.2. Breakdown / Reactive Maintenance
The Contractor shall attend to all breakdowns and repair requests promptly to ensure minimal
downtime of facilities.
Emergency Calls (e.g., major water burst, structural damage): Response time shall
be a maximum of [ e.g., 2 hours] from reporting the incident, with rectification starting
Normal Calls (e.g., minor leaks, door repair): Response time shall be a maximum of
[e.g., 24 hours].
3. Contractor's Obligations and Deliverables
Manpower and Equipment: The Contractor shall provide all necessary materials,
equipment, tools and tackles, supervision, and skilled labor required for the execution and
maintenance of the work.
Documentation: The contractor shall maintain detailed logbooks of all maintenance
activities (PPM and breakdowns), test reports, and usage of materials, to be verified and
signed by the Engineer-in-Charge's representative.
Materials: All materials used for repairs and maintenance must be of approved quality
and make, as specified in the Bill of Quantities (BOQ) or directed by the Engineer-in-Charge.
Safety: The agency must ensure all safety precautions and adhere to relevant safety
rules and regulations during the execution of work.
Reporting: The contractor shall submit monthly/quarterly maintenance reports to the
Client/Consultants.
The following items are generally excluded from the scope of routine maintenance (unless
specified otherwise in the BOQ):
Major capital works or new construction projects.
Replacement of major capital equipment beyond normal wear and tear (e.g., full lift
replacement vs. motor repair).
Repairs for damages caused by natural calamities or third-party actions not covered by
the contract terms.
Skilled personnel
Supervisor/Foreman: Oversees work and ensures quality and safety.
Masons: For brickwork, plastering, and other masonry tasks.
Carpenters: For repairing and installing doors, windows, and other wooden structures.
Plumbers: For repairing drainage, water supply, and sanitary systems.
Pump Operators: If the work involves pumps.
Other skilled trades: May include electricians or other technicians depending on the
specific maintenance needs.
Unskilled personnel
Beldars/Helpers: Assist skilled workers with various tasks.
Laborers: For general tasks like material handling, site cleanup, and other manual
Sewermen: Specialized personnel for sewer-related maintenance.
Clerical staff: A clerical person may be needed for office work related to the project.
Important considerations
Project-specific assessment: The exact number of people needed will depend on the
specific tasks, such as repairing garages, drains, or roads.
Skilled vs. unskilled ratio: The ratio of skilled to unskilled labor should be adjusted
based on the project's needs. For example, a plumbing repair will require more plumbers than
unskilled labor, while a general cleanup will require more unskilled labor.
Tools and equipment: Contractors are typically responsible for providing their own
tools and equipment.
Safety and compliance: Manpower deployment must comply with safety regulations
and labor laws, including timely payment of wages and benefits.
For all of the above Works Required Manpower As below:-
Mason/Plumber/Carpenter:- 1 No’s of Skilled 2 No’s of Unskilled Labour with all
tools and equipments & Materials to be supplied at site within 1 days, for different
Maintenance work as an when required. The Work should be started within
Hours and to be complete on same day as an when required for the said work as
per Instructions of Engineer in Charge.
For Flooring Work:- 01 Mason (Skilled ) & 02 No’s of Unskilled Labour for Every
10 Smt Area & For Above That Same Formula will be applied. With all tools and
equipments & Materials to be supplied at site within 3 days.
For Colour Work:- For Every 50 Smt Area 1 Painter with 1 Helper Required for
different coats upto to the final coat & Vice Versa for Above Area same formula
will be applied. With all tools and equipments & Materials to be supplied at site
For Different Fabrication/Alumnium/New Wooden Work:- For Construction of
New Shed or Grill work or different Fabrication work as an when required. The
Manpower Required for this will be 2 nos of Fabricators ( Skilled ) and 2 Nos of
Helper ( Skilled ) For necessary Fabrication of new or repairing work with all tools
and equipments upto the area of 50 Smt. The Given Task Should be Started within
3 Days or as as per Instructions of Engineer In Charge.
For All of the above activites Necessary Bond should be given by contractor Before
Starting of the work, Failing to the above so will be solely responsilbility of
contractor and will be Put up for Debar as per Ahmedabd Municipal Corporation
circular & Norms.
Bond To Be Given as Below on Letter Head of Contractor After Allotment of Work
Additional City Engineer
West Zone-Engineering Department.
Subject: - Regarding schedule of Maintenance of Works as Per Tender Clause
and scope of works as per BOQ Tender Items.
With Reference to the above subject for all of the Schedule of Maintenance
work, we bind to agree to the above all of the activities in given time format with
necessary manpower with all necessary Equipments and Materials. Failing to the
Above Scope Will be solely Responsible of Our Firm, and necessary actions if taken
by AMC for Debar As Per AMC Circular No. 74 Dated:- 15.10.25 of our firm for
not completion of work, will be solely responsible By our firm.
CONTRACTOR'S SIGNATURE ADDL.CITY ENGINEER
& STAMP Mobile No.:- (West Zone)
ybœtJtœ BgwÂlÂmvj ftuvtuohuNl
bntldh muJtmœl –vrùbÍtul
vrùb Ítul Ítulj ytuVem,
1. Wvhtuf< xuLzhtu su <u Jdobtk btLg hSMx[uNl ^htJ<t ftuLx[tfxh©eytuyu ChJt.
2. xuLzhle rlg< xuLzh Ve <&t R.yub.ze. ck^ fJhbtkk Wvh lt mhltbu ÁcÁ / hSMxh yu.ze./ MvezvtuMx/ fwhegh&e rlg<
mbgbtk btufjJtlt hnuNu.
3. ftuLx[tfxh©eytuyu xuLzhle mt&u BGþrlrmvj btLg hSMx[uNlle/ dJobuLx hSMx[uNlle ftuve, (xuLzh ftuve <&t yLg vwhtJt
mt&u) yawf mtbuj fhJtle hnuNu ylu fJh Wvh xuLzh lkch <&t ftuLxufx lkch sYh MvÐ œNtoJJtltu hnuNu.ck^ fhJh Wvh
xuLzh ltuxem lkch, xuLzh lkch, ftblwk ltb <&t, ftuLx[[tfxhle mkM&tlwk ltb <&t ftuLxufx lkch yJ~g œNtoJJtlt hnuNu.
ftuLx[tfxhtuyu xuuLzhbt cukfl wltb, Ft<t lkch, btRfh lkch ylu mhltb wMvÐ yûthtubtk jFJw.
4. xuLzh Ve vu ytuzoh / zebtLz z[tVx&e aqfJJtlehnuNu. œhuf xuLzh œeX yjd xuLzh xuLzhVe ChJtle hnuNu.
5. ytuAe hfble xuLzh Ve, R.yub.ze. fu xuLzh Ve, R.yub.ze. ÂJltlt xuLzhtu hœct<j (fuLmj) dKtNu.
6. xuLzh mt&u BþfJtbtk ytJ<e yluoMxble, xuLzhle hfblt 1% «btKu cukf duhLxe / zebtLz z[tVx / vu ytuzoh / jtufj btRfh
auf&e s MJefthJtbtk ytJNu. œhuf xuLzh œeX yjd R.yub.ze. ChJtle hnuNu. R.yub.ze. hfb Yt. yuf fhtuz mwDele
ykœtS< hfblt ftb btxu jtufj btRfh auf, rzbtLz z[tVx, vu ytuzoh fu cukf duhkxelt MJYvbtk <&t Yt. yuf fhtuz&e Wvhle
ykœtS< hfblt ftb btxu R.yub.ze.le hfb btºt rzbtLz z[tVx, vu ytuzoh fu ckuf duhkxelt MJYvbtk ytvJtle hnuNu.
7. cukf duhuLxe btºt ybœtJtœ Nnuhle s MJefthJtbtk ytJNu.
8. xuLzh Ve <&t R.yub.ze.le hfblt ze.ze./ aufle vtA¤ ftuLx[tfxh©eyu vtu<tle mkM&tlwk ltb <&t btuctRj lkch yJ~g
jFJtltu hnuNu. ftuLx[t¾xhu vtu<tle mkkM&tlt auf <&t ze.ze. xuLzh R~gw > <theF ctœlt s ytvJt.
9. Nh<e xuLzhtu hœ ct<j dKtNu.
10. stu xuLzhbtk MvÐ WÕjuF fhtguj ntug <tu atubtmtlu fthKu Ft<tfeg MËalt yLJgu ßgthu ßgthu ftb ck^ htFJtLþk &tg <u
mbglu ftble BþÆ<btk bshu ytvJtbtk ytJNu. vhkðþ yt yLJgu ftuE CtJ J^thtu ytvJtbtk ytJNu lne. sule ltuk^ >huf
11. xuuLzhtu ftuEvK fthK ytÃgt rmJtg MJefthJt fu lrnk MJefthJt <ule mkÃËKo m•tt BGþrlrmvj frbNlh©ele hnuNu.
12. xuLzhbtk stu ftuR mwDtht JDtht ntug <tu <u ykd xuLzh Ch<t vnujt AuÕju œJmu rlg< JucmtRx y&Jt fauheyu sYhe <vtm
fhelu s xuLzh btufjJw.
13. mefgtuhexe zevtuÍex/ vVtuboLm duhuLxele hfb Yt. yuf fhtuz mwDele ykœtS< hfblt ftb btxu jtufj btRfh auf, rzbtLz
z[tVx, vu ytuzoh fu cukf duhkxelt MJYvbtk <&t Yt. yuf fhtuz&e Wvhle ykœtS< hfblt ftb btxu mefgtuhexe zevtuÍex/
vhVtuboLm duhkxele hfb btºt rzbtLz z[tVx, vu ytuzoh fu ckufduhkxelt MJYvbtk ytvJtle hnuNu.
14. ytuljtRl yul-«tufgwh JucmtRx vh&e ChJtlt &<t xuLzhbtk ftuLx[tfxh/ yusLmeyu xuLzhle ntzo ftuvebtk CtJ Cgto
Jdhle mne mefft fhe mcbex fhJtle hnuNu. stu <ubtk CtJ Chuj nNu <tu <uJt xuLzh hœ fhJtbtk ytJNu.
15. mœh xuLzhbtk ” GST rl<e rlgb bwsc jtdw vzNu ” <u bwsc dK<he fhe xuLzhtu ChJtlt hnuNu.
16. mœh xuLzhbtk ” dwsht< mhfth ©e lt ©b,ftiNÕg rJftm ylu htusdth rJCtd,mraJtjg,dtk^eldh lt XhtJ ¢btkf:
LED/WRT/e-file/11/2024/0293/M2 Dt.15.02.2024” bwsc awM<vKu ybj fhJtltu hnuNu.
zebtLz z[tVx / auf “BgwÂlÂmvj fÂb§h, ybœtJtœ” lt ltbltu fZtJJtu.
CONTRACTOR'S SIGNATURE ADDL.CITY ENGINEER
& STAMP ( West Zone)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender No. 13.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .