Loading…
Loading…
Tender Value
₹4.1 L
EMD Value
₹4,056
Closing Date
22 May 2026, 4:00 pmClosed
Nandikotkur Municipality
Nandikotkur
Construction of CC Road from HNO:3-397 to HNO:4-471 Near Taluka Office road area in Election Ward 20, Nandikotkur Municipality.
929857
11-1/General Fund/Works/NDKTR/2026.
OPEN - NCB
Road Work
NANDYAL
7 documents required · 6 mandatory · 1 optional
₹144
₹4,056
6 Jun 2026
6 May 2026
6 May 2026
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202 MORD / MORTH for Cement Concrete
Earthwork excavation for road way in soil by mechanical means including cutting and loading in tippers trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections and transporting to the embankment location or disposal of unserviceable soil with all leads and lifts etc., complete for finished item of work for trench cutting as per MORT&H specification No.301 and as directed by the Engineer-in-Charge
Collection, supply, and filling of Crusher Stone Dust from approved quary to work site and stacking at work site to Dept. gauge for premeasurements including cost and conveyance of all materials, labour charges etc., complete as per standard specifications. Clause 305.39 MORD & 304 MORTH etc., complete and as directed by Engineer in Charge of work
Providing Plain Cement Concrete nominal mix (1:4:8) in open foundations using 40 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications. etc., complete and as directed by Engineer in Charge of work.
Construction of VCC M30 grade design mix un-reinforced, expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per IS codes , coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 21- days, and water finishing to lines and grade as per drawing and Technical Specification (Note: - Payment will be released only after satisfactory core results of the concrete strength for 28 days as per IS code)
Collection, supply, and filling of Gravel from approved quary to work site and stacking at work site to Dept. gauge for premeasurements including cost and conveyance of all materials, labour charges etc., complete as per standard specifications. Clause 305.39 MORD & 304 MORTH etc., complete and as directed by Engineer in Charge of work
Assistant Engineer
Nandikotkur Municipality
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202 MORD / MORTH for Cement Concrete
Earthwork excavation for road way in soil by mechanical means including cutting and loading in tippers trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections and transporting to the embankment location or disposal of unserviceable soil with all leads and lifts etc., complete for finished item of work for trench cutting as per MORT&H specification No.301 and as directed by the Engineer-in-Charge
Collection, supply, and filling of Crusher Stone Dust from approved quary to work site and stacking at work site to Dept. gauge for premeasurements including cost and conveyance of all materials, labour charges etc., complete as per standard specifications. Clause 305.39 MORD & 304 MORTH etc., complete and as directed by Engineer in Charge of work
Providing Plain Cement Concrete nominal mix (1:4:8) in open foundations using 40 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications. etc., complete and as directed by Engineer in Charge of work.
Construction of VCC M30 grade design mix un-reinforced, expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per IS codes , coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 21- days, and water finishing to lines and grade as per drawing and Technical Specification (Note: - Payment will be released only after satisfactory core results of the concrete strength for 28 days as per IS code)
Collection, supply, and filling of Gravel from approved quary to work site and stacking at work site to Dept. gauge for premeasurements including cost and conveyance of all materials, labour charges etc., complete as per standard specifications. Clause 305.39 MORD & 304 MORTH etc., complete and as directed by Engineer in Charge of work
stage.html
html • 0.01 MB
aoc.html
html • 0.01 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.01 MB
11-1 BOQ.xls
TENDER_DOCUMENT • 0.05 MB
11-1 online BOQ.xlsx
TENDER_DOCUMENT • 0.01 MB
11-1NIT 1.doc
TENDER_DOCUMENT • 0.14 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .