Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 LAccepted-Finance | ₹1.5 L | L1 | Accepted-Finance Found in order |
| 2 | L2₹1.9 LAccepted-Finance MEERUT UTTAR PRADESH 250110 INDIA UDYAM UP 56 0008622 | MEERUT | UTTAR PRADESH | 250110 | ₹1.9 L | L2 | Accepted-Finance Found in order |
| 3 | L3₹1.9 LAccepted-Finance | ₹1.9 L | L3 | Accepted-Finance Found in order |
| 4 | L4₹1.9 LAccepted-Finance | ₹1.9 L | L4 | Accepted-Finance Found in order |
| 5 | Not Admitted-Fee/PreQual/Technical 259 ANAND VIHAR COLONY NAWADA SEKHAN PILIBHIT BYPASS ROAD BAREILLY UTTAR PRADESH 243005 | BAREILLY | UTTAR PRADESH | 243005 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹1.9 L
EMD Value
₹3,000
Closing Date
12 May 2023, 12:00 pmClosed
Executive Engineer
E 400KV Substation, Division, Bareilly
Repairing of Damaged 630 KVA (33 / 0.4KV) Station Transformer
2023_UPTCL_798882_2
Very Short Term E-Tender No. 03/400KV(B)/2023-24
Open Tender
Repair and Maintenance Works
15 days
E.400KV S/S Division
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
Yes
Executive Engineer
₹3,000
18 May 2023
6 May 2023
12 May 2023
6 May 2023
12 May 2023
6 May 2023
Amount
Loading of the Damaged Transformer at 400 K.V S/S Bareilly to Repair Workshop by suitable capacity Hydra to Private Vehicle provided by the Contractor, carriage of same from 400 K.V S/S Bareilly at Repair Workshop and safe Unloading & placing at the Repair Workshop.
Cleaning of all parts of transformer including Core Tank, Cooling Tube Radiators. Minor repair of core, Body of transformer & cooling fins (with proper welding or by using such adhesives to arrest any leakages) as per requirement, fitting & fixing of new parts / usable parts, making connections & assembling the Core and H.T. & L.T. Coils complete in all respect, shifting the job to baking chamber and after proper insulation, re-tanking and filling the T/F Oil duly centrifuged & filtered, making ready the Transformer for test, Testing of the Transformer for all the Routine Tests as per ISS 2026 / 1977. (Test Report Should be provided by the contractor in Hard Copy).
Replacement of burnt & damaged H.T. Coils with new 12 Nos. H.T. Coils (12 Nos. H.T. Coils in each Leg; each Coil weighing 11.5 Kg) complete with insulation / varnishing after vacuum impregnation in Kanohar Make 630 KVA 33 / 0.4 KV Transformer. Old and Used Copper Scraps shall be property of Contractor hence rates must be quoted accordingly.
Erasing worn out Paper Insulation from L.T. Coils, Straightening the L.T. Coil Strips, re-covering with Double Paper Insulation (D.P.C.) on naked Strips by D.P.C. Machine and making the 3 Nos. L.T. Coils (Each Coil weighing 64 Kg), with cost of Paper Insulation, Double Paper Insulation covering and making of L.T. Coils only.
Replacement of Insulating materials (L.S.).
Repairing Tap Changer including replacement Tapping Switches etc.
Replacement of Silica gel Breather with fresh Silica gel in place of damaged ones.
Filling of Centrifuging & Fresh Transformer Oil to be provided by the Department. (Centrifuging of Oil to be done by the Contractor till the desired value).
Painting of the Transformer inside with Zinc Chromate Paint & outside with two coats of Smoke Grey colour synthetic enamel Paint.
Loading of the repaired Transformer at Repair Workshop by suitable capacity Hydra to Private Vehicle provided by the Contractor, carriage of same from Repair Workshop to 400 K.V S/S Bareilly and safe unloading & placing at stores at the Sub Station.
Hi-tech power transmission
SHASHI ENTERPRISES
Meena Elect & Engg. Works
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid