Tender Value
₹6.3 L
EMD Value
₹7,000
Closing Date
21 May 2026, 6:00 pmClosed
Executive Engineer, Rajkot Irrigation Division, Rajkot.
VENU-II IRRIGATION SCHEME Providing Man Power for Flood Cell for Venu-2 Irrigation Scheme for Year 2026
302275
SBD-03 of 2026-27
Open
Civil - All
Rajkot
7 documents required · 7 mandatory
₹900
Executive Engineer, Rajkot Irrigation Division Rajkot
₹7,000
7 May 2026
7 May 2026
7 May 2026
21 May 2026
7 May 2026
NAME OF WORK :-
Providing Man Power for Flood Cell for Venu-2 Irrigation Scheme for Year
BILL OF QUANTITIES (SCHEDULE - B)
(A) Percentage Rate Tender (Upto Rs. 50 Crore)
Item Description of Item Quantity Unit Estimated Rate Amount
No. (with brief specification and reference to book of specifications) In Figure In words
1 Supplying skill labour as T.A./W.A. during flood cell to calculate 306.00 Man Days 719.69 Rupees: Seven Hundred
inflow/outflow, pass message and miscellaneous activity during Flood Cell. Ninteen & Ps. Sixty Nine
2 Providing Electrical & Mechanical Service for Flood routing at dam site in 50.00 Man Days 1707.41 Rupees: One Thousand
suitable shift as per instruction of engineer-in-charge. Seven Hundred Seven &
Ps. Forty One Only.
3 Supplying unskill labour during flood cell to operating gate and 459.00 Man Days 690.09 Rupees: Six Hundred Ninty
miscellaneous activity during flood cell. & Ps. Nine Only.
4 Supplying of Empty Cement Bags in Good Condition at work site and 300.00 Nos. 32.39 Rupees: Thirty Two & Ps.
Filling the same with good selected earth or sand including stitching and Thirty Nine Only.
laying or stacking as and where directed with all lead and lift etc. Complete.
Rupees: Six Lac Thirty Two Thousand Sixty Three & Ps. Ninty Five Only
I/We are willing to carry out the work at …………………………………………………………...% above/below percent (should be written in figure and words) of the estimated
rates mentioned above. The amount of my/our tender works out as under;
*Estimated amount put to tender Rs. ……………… *Estimated amount put to tender Rs. ………………
Deduct : ……… % below Rs. ………………. Add : ……… % above Rs. ……………….
Net : Rs. ……………… Total : Rs. ………………
In words : Rupees ………………………………………………………………………… In words : Rupees………………………………………………………
1 The Contractor shall exhibit a board with detailed specification and details of work as directed by the Engineer-In-Charge for which no extra payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e.1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt.G.R.:PRC-10/2017 Cement Consumption/16/C Date:11/05/2017 as stated
in S.O.R.thereforeinR.C.C.items where there is a change as per actual mix design the cost of difference of cement consumption have been deducted from the rate of original
item at the rate of input rate mentioned in all the tender.
Deputy Executive Engineer
Signature of contractor. Irrigation Sub Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1 Tender P 1 to 14.pdf
2- SBD Skilled -Unskilled - Venu-II P 15 to 124.pdf
3 Sch B - Skilled-Unskilled Man Power -Venu-II P. 125 to 125.pdf
Annexure A.pdf