Loading…
Loading…
Tender Value
₹12.9 L
EMD Value
₹32,300
Closing Date
4 Mar 2026, 3:00 pmClosed
Chief Engineer, TTD, Tirupati
O/o Divisional Engineer(Elec)-I Room No.126, Ground floor, T.T.D.Administrative Buildings, K.T.road, Tirupati, Chittoor(Dist), A.P, India
Hire Charges for providing scaffolding for ornamental designs & cut-outs near Kalyanavedika inside premises & Roads upto Bhakarapeta etc., in connection with the Kalyanostavam-2026 of Sri Kodandarama Swamy at Vontimitta in YSR Kadapa (Dist).
901658
309/DE(Elec.)-I/TTD/TPT/2025-26
OPEN - NCB
Electrical Works
TIRUPATHI
6 documents required · 6 mandatory
₹457
₹32,300
19 Mar 2026
16 Feb 2026
16 Feb 2026
Hire Charges for Erection and removal of scaffolding for erection of Electrical illumination Figures wherever necessary as directed during execution including providing necessary struts, ties, bracing s etc, from bottom to 10 meter.
Note:- 1. TTD Lorry to be arranged on Free of cost for transportation of scaffolding materials To and Fro exclusive for scaffolding works for erection of electrical cutout at Tirumala except for works at Tirupati and Tirchanoor and transportation charges will be paid separately for outside places,
2. Erection should be completed before Two days of commencement of the Festival / Utsavam.
3. The TTD has not responsible for theft and fire accident.
4. The existing scaffolding shall be reused are continued up to 2 Months and the rate shall be allowed for such extension at 25% less over the above rates.
5. The measurements shall be given for the front view of the scaffolding.
6. 10% extra will be paid for 4-mada streets at Tirumala.
7. Transportation charges will be paid for outside places 15% extra for Tirupati rates (beyond 18 KMs)
8. The above rates are excluding GST.
Hire Charges for Erection and removal of scaffolding for erection of Electrical illumination Figures wherever necessary as directed during execution including providing necessary struts, ties, bracings etc, from bottom to 20 meter.
Note:- 1. TTD Lorry to be arranged on Free of cost for transportation of scaffolding materials To and Fro exclusive for scaffolding works for erection of electrical cutout at Tirumala except for works at Tirupati and Tirchanoor and transportation charges will be paid separately for outside places,
2.Erection should be completed before Two days of commencement of the Festival / Utsavam.
3.The TTD has not responsible for theft and fire accident.
4.The existing scaffolding shall be reused are continued upto 2 Months and the rate shall be allowed for such extension at 25% less over the above rates. 5. The measurements shall be given for the front view of the scaffolding.
6. 10% extra will be paid for 4-mada streets at Tirumala. 7.Transportation charges will be paid for outside places 15% extra for Tirupati rates (beyond 18 KMs) 8.The above rates are excluding GST.
Hire Charges for Erection and removal of scaffolding for erection of Electrical illumination Road Arches wherever necessary as directed during execution including providing necessary struts, ties, bracings etc. for single side arch
Note:- 1. TTD Lorry to be arranged on Free of cost for transportation of scaffolding materials To and Fro exclusive for scaffolding works for erection of electrical cutout at Tirumala except for works at Tirupati and Tirchanoor and transportation charges will be paid separately for outside places,
2. Erection should be completed before Two days of commencement of the Festival / Utsavam.
3. The TTD has not responsible for theft and fire accident.
4. The existing scaffolding shall be reused are continued upto 2 Months and the rate shall be allowed for such extension at 25% less over the above rates.
5. The measurements shall be given for the front view of the scaffoldings.
6. 10% extra will be paid for 4-mada streets at Tirumala.
7. Transportation charges will be paid for outside places 15% extra for Tirupati rates (beyond 18 KMs)
8. The above rates are excluding GST.
Hire Charges for Erection and removal of scaffolding for erection of Electrical illumination Road Arches wherever necessary as directed during execution including providing necessary struts, ties, bracings etc. for double side arch
Note:- 1. TTD Lorry to be arranged on Free of cost for transportation of scaffolding materials To and Fro exclusive for scaffolding works for erection of electrical cutout at Tirumala except for works at Tirupati and Tirchanoor and transportation charges will be paid separately for outside places,
2. Erection should be completed before Two days of commencement of the Festival / Utsavam.
3. The TTD has not responsible for theft and fire accident.
4. The existing scaffolding shall be reused are continued upto 2 Months and the rate shall be allowed for such extension at 25% less over the above rates.
5. The measurements shall be given for the front view of the scaffoldings.
6. 10% extra will be paid for 4-mada streets at Tirumala.
7. Transportation charges will be paid for outside places 15% extra for Tirupati rates (beyond 18 KMs)
8. The above rates are excluding GST.
Supply of Man mazdoor
stage.html
html • 0.01 MB
aoc.html
html • 0.01 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.01 MB
BOQ 309.xlsx
TENDER_DOCUMENT • 0.01 MB
309 NIT.doc
TENDER_DOCUMENT • 0.63 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].