Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.2 CrAdmitted-Finance | ₹6.2 Cr | L1 | Admitted-Finance |
| 2 | L2₹6.4 Cr+₹22.3 L (3.61%)Admitted-Finance | ₹6.4 Cr+₹22.3 L (3.61%) | L2 | Admitted-Finance |
| 3 | L3₹6.9 Cr+₹71.3 L (11.5%)Admitted-Finance | ₹6.9 Cr+₹71.3 L (11.5%) | L3 | Admitted-Finance |
| 4 | L4₹7.0 Cr+₹80.3 L (13.0%)Admitted-Finance | ₹7.0 Cr+₹80.3 L (13.0%) | L4 | Admitted-Finance |
| 5 | L5₹8.5 Cr+₹2.3 Cr (37.8%)Admitted-Finance 201 ROYAL ARCADE DR B BARUAH ROAD ULUBARI GUWAHATI 781007 | GUWAHATI | KAMRUP METRO | ASSAM | 781007 | ₹8.5 Cr+₹2.3 Cr (37.8%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | MECHFAB ENGINEERING INDUSTRIES PVT LTD L3 | V.K Gupta & Associates L6 | Nand Lal Tayal L1 | Messrs Tama Fabrication Works L4 | GRRB ASSOCIATES L2 | GARG & GARG CO L7 | BHARTIA INFRA PROJECTS LTD L5 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00CONSTRUCTION OF 80.00 MTR SPAN STEEL SUPERSTRUCTURE (THROUGH TYPE) OVER SAPTI NALLAH AT KM 8.475 ON KAROTI TENAI ROAD ON DEPARTMENTALLY CONSTRUCTED ABUTMENTS UNDER 48 BRTF UNDER PROJECT UDAYAK IN ARUNACHAL PRADESH STATE | ||||||||||
| 1.01 | DESIGN INCLUDING PROOF CHECKING AND CONSTRUCTION OF 80 MTR SPAN STEEL SUPER STRUCTURE (THROUGH TYPE) MAJOR PERMANENT BRIDGE INCLUDING ABUTMENT CAP, DRIT WALL OVER DEPARTMENTALLY CONSTRUCTED ABUTMENT OVER SAPTI NALLAH AT KM 8.475 ON ROAD KAROTI-TENAI OF 1444 BCC SECTOR UNDER 48 BRTF PROJECT UDAYAK IN ARUNACHAL PRADESH STATE AS PER NIT DRAWING AND BASED ON HYDRAULIC DATA, GROUND DATA, SUB SOIL DATA, SPECIAL CONDITIONS AND PARTICULAR SPECIFICATION OF STAGING/SHUTTERING, PLACING OF POT AND POT CUM PTFE BEARINGS, LAUNCHING OF STEEL SUPER STRUCTURE AND CASTING RCC DECKING, WEARING COAT HAVING NON SKID SURFACE IN UNIFORM THICKNESS, STRIP SEAL EXPANSION JOINTS, CRASH BARRIERS, FOOTPATHS, KERBS, RCC HAND RAIL, DRAINAGE SPOUT, LOAD TESTING OF SUPER STRUCTURE OF BRIDGE, SERVICE ARRANGEMENT FOR UTILITY, PAINTING OF ALL EXPOSED STEEL WORK, PROTECTIVE WORKS, TEMPORARY RIVER TRAINING WORK AND DIVERSION; AND ALL OTHER ITEMS OF WORKS REQUIRED AND NECESSARY FOR THE COMPLETE CONSTRUCTION OF THE BRIDGE INCLUDING CURING BUT EXCLUDING WORKS ON APPROACHES AND APPROACH SLAB AS PER APPROVED DESIGN AND DRAWING.
FOLLOWING DRAWINGS IS ENCLOSED FOR REFERENCE:-
(a) GAD DRG NO. GAD/SAPTI/01/UDK sheet No.1 dated 07 Feb 2023. | 1 | Nos | 6,89,00,000 ₹6,89,00,000 | 9,27,00,000 ₹9,27,00,000 | 6,17,69,000 ₹6,17,69,000 Lowest | 6,98,00,000 ₹6,98,00,000 | 6,40,00,000 ₹6,40,00,000 | 9,50,00,000 ₹9,50,00,000 | 8,51,00,000 ₹8,51,00,000 |
Tender Value
₹5.7 Cr
EMD Value
₹6.5 L
Closing Date
22 Apr 2024, 12:00 pmClosed
The Chief Engineer (P) Udayak
HQ CE (P) Udayak, C/o 99 APO PIN 931715 (Doom Dooma)
DESIGN AND CONSTRUCTION OF 80 MTR SPAN STEEL SUPERSTRUCTURE (THROUGH TYPE) MAJOR PMT BRIDGE ON DEPARTMENTALLY CONSTRUCTED ABUTMENT OVER SAPTI NALLAH AT KM 8.475 ON ROAD KAROTI-TENAI OF 1444 BCC SECTOR UNDER 48 BRTF IN ARUNACHAL PRADESH STATE P UDK
2024_BRO_648912_1
CE(P)Udayak/34/2023-24
Open Tender
Civil Works
Lump-sum
730 days
at km 8.475 on road Karoti-Tenai
As per tender documents
6 documents required · 6 mandatory
₹0
₹6.5 L
Yes
HQ CE (P) Udayak, C/o 99 APO PIN 931715
29 May 2024
1 Apr 2024
23 Apr 2024
1 Apr 2024
22 Apr 2024
8 Apr 2024
1 Apr 2024 - 6 Apr 2024
8 Apr 2024
Amount
CONSTRUCTION OF 80.00 MTR SPAN STEEL SUPERSTRUCTURE (THROUGH TYPE) OVER SAPTI NALLAH AT KM 8.475 ON KAROTI TENAI ROAD ON DEPARTMENTALLY CONSTRUCTED ABUTMENTS UNDER 48 BRTF UNDER PROJECT UDAYAK IN ARUNACHAL PRADESH STATE
DESIGN INCLUDING PROOF CHECKING AND CONSTRUCTION OF 80 MTR SPAN STEEL SUPER STRUCTURE (THROUGH TYPE) MAJOR PERMANENT BRIDGE INCLUDING ABUTMENT CAP, DRIT WALL OVER DEPARTMENTALLY CONSTRUCTED ABUTMENT OVER SAPTI NALLAH AT KM 8.475 ON ROAD KAROTI-TENAI OF 1444 BCC SECTOR UNDER 48 BRTF PROJECT UDAYAK IN ARUNACHAL PRADESH STATE AS PER NIT DRAWING AND BASED ON HYDRAULIC DATA, GROUND DATA, SUB SOIL DATA, SPECIAL CONDITIONS AND PARTICULAR SPECIFICATION OF STAGING/SHUTTERING, PLACING OF POT AND POT CUM PTFE BEARINGS, LAUNCHING OF STEEL SUPER STRUCTURE AND CASTING RCC DECKING, WEARING COAT HAVING NON SKID SURFACE IN UNIFORM THICKNESS, STRIP SEAL EXPANSION JOINTS, CRASH BARRIERS, FOOTPATHS, KERBS, RCC HAND RAIL, DRAINAGE SPOUT, LOAD TESTING OF SUPER STRUCTURE OF BRIDGE, SERVICE ARRANGEMENT FOR UTILITY, PAINTING OF ALL EXPOSED STEEL WORK, PROTECTIVE WORKS, TEMPORARY RIVER TRAINING WORK AND DIVERSION; AND ALL OTHER ITEMS OF WORKS REQUIRED AND NECESSARY FOR THE COMPLETE CONSTRUCTION OF THE BRIDGE INCLUDING CURING BUT EXCLUDING WORKS ON APPROACHES AND APPROACH SLAB AS PER APPROVED DESIGN AND DRAWING. FOLLOWING DRAWINGS IS ENCLOSED FOR REFERENCE:- (a) GAD DRG NO. GAD/SAPTI/01/UDK sheet No.1 dated 07 Feb 2023.
GRRB ASSOCIATES
MECHFAB ENGINEERING INDUSTRIES PVT LTD
Messrs Tama Fabrication Works
BHARTIA INFRA PROJECTS LTD
V.K Gupta & Associates
GARG & GARG CO
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.42 MB
IPSapti.pdf
Additional Documents • 0.60 MB
BOQ_726449.xls
BOQ • 0.27 MB
GADSapti.pdf
Additional Documents • 7.43 MB
TDSapti.pdf
Tender Documents • 1.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .