| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.0 CrAccepted-AOC 303 GHS 888 SECTOR 20 PANCHKULA 134116 HARYANA | PANCHKULA | PANCHKULA | HARYANA | 134116 | ₹3.0 Cr | L1 | Accepted-AOC AOC |
| 2 | L2₹3.2 Cr+₹20.9 L (6.99%)Rejected-Finance WZ 1000 NANGAL RAYA PANKHA ROAD SOUTH WEST DELHI DELHI 110046 | DELHI | SOUTH WEST DELHI | DELHI | 110046 | ₹3.2 Cr+₹20.9 L (6.99%) | L2 | Rejected-Finance BEING LOWEST 2 |
| 3 | L3₹3.2 Cr+₹24.1 L (8.05%)Rejected-Finance I 910 JAHANGIR PURI NEAR BY ANAND MAYA HOSPITAL NORTH WEST DELHI DELHI 110033 UDYAM DL 06 0040830 | NORTH DELHI | DELHI | 110033 | ₹3.2 Cr+₹24.1 L (8.05%) | L3 | Rejected-Finance BEING LOWEST 3 |
| 4 | L4₹3.7 Cr+₹66.9 L (22.4%)Rejected-Finance | ₹3.7 Cr+₹66.9 L (22.4%) | L4 | Rejected-Finance BEING LOWEST 4 |
| 5 | L5₹3.7 Cr+₹70.9 L (23.7%)Rejected-Finance 04 L BLOCK MARKET SECTOR 11 NOIDA 201301 UP GAUTAM BUDHA NAGAR | GAUTAM BUDDHA NAGAR | UTTAR PRADESH | 201301 | ₹3.7 Cr+₹70.9 L (23.7%) | L5 | Rejected-Finance BEING LOWEST 5 |
| Sl No | Description | Qty | Unit | R D Bansal L1 | mayur enterprises L2 | GEPS PROJECTS L5 | SATISH AND CO L3 | BAL SINGH AND SONS L4 |
|---|---|---|---|---|---|---|---|---|
| 1.00SCHEDULE `A' PART - I (Building Works) is not prepriced by MES and prepriced rates indicates 0.0 under column 6 signified this fact only. | ||||||||
| 1.01 | Construction of Meter room with permanent specifications complete all as shown on drawings. | 1 | Lump sum | 5,35,000 ₹5,35,000 | 7,00,000 ₹7,00,000 | 3,90,000 ₹3,90,000 Lowest | 4,50,000 ₹4,50,000 | 4,00,000 ₹4,00,000 |
| 2.00NOTE: Schedule ‘A’ Part II to V under Ser No. 2.01 to 2.04 are Prepriced by MES. | ||||||||
| 2.01 | Lump sum price worked out by the Contractor for “ EXCAVATION AND EARTH WORK” as listed in Schedule ‘A’ Part II | 1 | Lump sum | 8,05,000 ₹8,05,000 | 20,00,000 ₹20,00,000 | 15,90,000 ₹15,90,000 | 12,00,000 ₹12,00,000 | 7,52,250 ₹7,52,250 Lowest |
| 2.02 | Lump sum price worked out by the Contractor for “INTERNAL ELECTRIFICATION"” as listed in Schedule ‘A’ Part III | 1 | Lump sum | 35,500 ₹35,500 | 35,000 ₹35,000 | 57,000 ₹57,000 | 26,855 ₹26,855 | 26,690 ₹26,690 Lowest |
| 2.03 | Lump sum price worked out by the Contractor for “INTERNAL WATER SUPPLY"” as listed in Schedule ‘A’ Part IV | 1 | Lump sum | 14,800 ₹14,800 | 15,000 ₹15,000 | 15,750 ₹15,750 | 12,500 ₹12,500 | 93.5 ₹93.5 Lowest |
| 2.04 | Lump sum price worked out by the Contractor for “EXERNAL ELECTRIC SUPPLY"” as listed in Schedule ‘A’ Part V | 1 | Lump sum | 2,03,35,000 ₹2,03,35,000 | 1,95,00,000 ₹1,95,00,000 Lowest | 2,62,41,000 ₹2,62,41,000 | 2,18,17,815 ₹2,18,17,815 | 2,40,56,250 ₹2,40,56,250 |
| 3.00SCHEDULE `A' PART - VI MISC ITEMS is not prepriced by MES and prepriced rates indicates 0.0 under column 6 signified this fact only. | ||||||||
| 3.01INTERNAL ELECTRIFICATION | ||||||||
| 3.02 | Supply and fix blank plate one module all as specified. | 1 | Each | 100 ₹100 | 20 ₹20 Lowest | 150 ₹150 | 80 ₹80 | 30 ₹30 |
Tender Value
₹3.7 Cr
EMD Value
₹4.5 L
Closing Date
19 Jun 2026, 6:00 pmClosed
CE (AF) WAC PALAM
HQ CE (AF) WAC PALAM DELHI CANTT-10
PROVN OF UNDERGROUND EXTERNAL E/M INFRASTRUCTURE SERVICES RING MAIN UNIT FOR TECH AREA AND RACE COURSE AT AF STN AMBALA
2026_MES_762881_1
CEWAC/AMB/T-04/2026-27
Open Tender
Civil Works
Lump-sum
270 days
GE (AF) AMBALA
Please refer Tender documents.
10 documents required · 10 mandatory
₹2,000
GE (AF) AMBALA
₹4.5 L
Yes
8 Jul 2026
15 May 2026
22 Jun 2026
15 May 2026
19 Jun 2026
12 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1SCHEDULE `A' PART - I (Building Works) is not prepriced by MES and prepriced rates indicates 0.0 under column 6 signified this fact only. | |||||
| - | Construction of Meter room with permanent specifications complete all as shown on drawings. | 1 | Lump sum | - | - |
| - | Lump sum price worked out by the Contractor for “ EXCAVATION AND EARTH WORK” as listed in Schedule ‘A’ Part II | 1 | Lump sum | 27,09,809 | ₹27,09,809 |
| - | Lump sum price worked out by the Contractor for “INTERNAL ELECTRIFICATION"” as listed in Schedule ‘A’ Part III | 1 | Lump sum | 43,565.29 | ₹43,565.29 |
| - | Lump sum price worked out by the Contractor for “INTERNAL WATER SUPPLY"” as listed in Schedule ‘A’ Part IV | 1 | Lump sum | 12,119.8 | ₹12,119.8 |
| - | Lump sum price worked out by the Contractor for “EXERNAL ELECTRIC SUPPLY"” as listed in Schedule ‘A’ Part V | 1 | Lump sum | 2,44,19,456.22 | ₹2,44,19,456.22 |
| 3SCHEDULE `A' PART - VI MISC ITEMS is not prepriced by MES and prepriced rates indicates 0.0 under column 6 signified this fact only. | |||||
| 3.01 | INTERNAL ELECTRIFICATION | - | - | - | - |
| - | Supply and fix blank plate one module all as specified. | 1 | Each | - | - |
| - | Supply and fix, LED bulb 10 Watt, all as specified and directed | 1 | Each | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 6.43 MB
Tender.pdf
Tender Documents • 11.83 MB
BOQ_857596.xls
BOQ • 0.35 MB
Binder1.pdf
Additional Documents • 1.68 MB
T04corrigendum.pdf
PDF • 1.53 MB
doc02917520260526163842.pdf
PDF • 4.82 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .