Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹229.8 CrAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹240.7 Cr+₹10.9 Cr (4.75%)Admitted-Finance PLOT NO 16 OPP METRO PILLAR NO 190 PASCHIM VIHAR EXTENSION ROHTAK ROAD DELHI 110 063 | L2 | Admitted-Finance | |
| 3 | Rejected-Technical | - | Rejected-Technical Non-Responsive |
| Sl No | Description | Qty | Unit | Raj Shyama Constructions Pvt. Ltd. L1 | VRC Constructions (India) Limited L2 |
|---|---|---|---|---|---|
| 1.00 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned with all lead including removal and disposal of top organic soil not exceeding 150 mm in thickness.
By Mechanical Means | 2 | Hectare | 70,790 ₹1,41,580 Lowest | 74,000 ₹1,48,000 |
| 2.00Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead as per the direction of Employers Representative. | |||||
| 2.10 | Rubble stone masonry in cement mortar | 10,071.3 | Cum | 482 ₹48,54,366.6 Lowest | 500 ₹50,35,650 |
| 3.00 | Scarifying existing bituminous surface to a depth of 50 mm by mechanical means (Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with all lifts and lead.) as per specification or as directed by Employers Representative. | 2,30,095.32 | sqm | 3.9 ₹8,97,371.75 Lowest | 4 ₹9,20,381.28 |
| 4.00 | Disposal of Lime, moorum, building rubbish with all leads & lifts at suitable disposal site as directed by Employers Representative | 77,295.54 | Cum | 130 ₹1,00,48,420.2 Lowest | 135 ₹1,04,34,897.9 |
| 5.00Cutting of Trees, including Cutting of Trunks, Branches and Removal (Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and lead and earth filling in the depression/pit.) | |||||
| 5.10 | Girth from 300 mm to 600 mm | 20 | Nos | 424 ₹8,480 Lowest | 443 ₹8,860 |
| 5.20 | Girth from 600 mm to 900 mm | 29 | Nos | 632 ₹18,328 Lowest | 660 ₹19,140 |
| 5.30 | Girth from 900 mm to 1800 mm | 116 | Nos | 1,305 ₹1,51,380 Lowest | 1,365 ₹1,58,340 |
| 5.40 | Girth above 1800 mm | 107 | Nos | 2,600 ₹2,78,200 Lowest | 2,717 ₹2,90,719 |
Tender Value
Refer Docs
EMD Value
₹4.7 Cr
Closing Date
20 Mar 2025, 4:00 pmClosed
Program Director
The Program Director, UUSDA, 777, Saatvik Tower, Kaulagarh Road, Rajendra Nagar, Dehradun 248001
Development of Drainage System and improvement of Roads at Haldwani, in Uttarakhand
2025_USADB_80426_1
UUSDA/P-95/199
Open Tender
Civil Works
Item Rate
913 days
Haldwani
Please refer Tender documents.
4 documents required · 4 mandatory
₹29,500
PD (UUSDA)
₹4.7 Cr
Dehradun
13 Jun 2025
18 Feb 2025
20 Mar 2025
18 Feb 2025
20 Mar 2025
10 Mar 2025
27 Feb 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned with all lead including removal and disposal of top organic soil not exceeding 150 mm in thickness.
By Mechanical Means | 2 | Hectare | - | - |
| 2Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead as per the direction of Employers Representative. | |||||
| 2.1 | Rubble stone masonry in cement mortar | 10,071.3 | Cum | - | - |
| 3 | Scarifying existing bituminous surface to a depth of 50 mm by mechanical means (Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with all lifts and lead.) as per specification or as directed by Employers Representative. | 2,30,095.32 | sqm | - | - |
| 4 | Disposal of Lime, moorum, building rubbish with all leads & lifts at suitable disposal site as directed by Employers Representative | 77,295.54 | Cum | - | - |
| 5Cutting of Trees, including Cutting of Trunks, Branches and Removal (Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and lead and earth filling in the depression/pit.) | |||||
| 5.1 | Girth from 300 mm to 600 mm | 20 | Nos | - | - |
| 5.2 | Girth from 600 mm to 900 mm | 29 | Nos | - | - |
| 5.3 | Girth from 900 mm to 1800 mm | 116 | Nos | - | - |
| 5.4 | Girth above 1800 mm | 107 | Nos | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tenderdocument.pdf
Tender Documents • 34.25 MB
Tenderdocument_2.pdf
Tender Documents • 28.13 MB
Tenderdocument_3.pdf
Tender Documents • 34.52 MB
Tenderdocument_4.pdf
Tender Documents • 0.19 MB
BOQ.xls
BOQ • 0.46 MB
Tenderdocument_5.pdf
Tender Documents • 34.69 MB
Tenderdocument_6.pdf
Tender Documents • 34.39 MB
Tenderdocument_7.pdf
Tender Documents • 33.89 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .