| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹41.9 LAccepted-AOC | L1 | Accepted-AOC Lowest bidder | |
| 2 | L2₹48.0 L+₹1.5 L (3.18%)Rejected-Finance 22 JANKALYAN SOCIETY NAVJIVAN AJWA ROAD BARODA 390 019 | BARODA | VADODARA | GUJARAT | 390019 | L2 | Rejected-Finance Higher bid value | |
| 3 | L3₹48.4 L+₹1.9 L (4.11%)Rejected-Finance | L3 | Rejected-Finance Higher bid value | |
| 4 | L4₹48.9 L+₹2.4 L (5.19%)Rejected-Finance | L4 | Rejected-Finance Higher bid value | |
| 5 | L5₹49.0 L+₹2.5 L (5.41%)Rejected-Finance 79 O P ROAD NAYABASTI P O P S BARRACKPORE DIST NORTH 24 PARGANAS PIN 700 120 WB | 24 PARAGANAS NORTH | WEST BENGAL | 700120 | L5 | Rejected-Finance Higher bid value |
| Sl No | Description | Qty | Unit | BANERJEE ENTERPRISE L6 | S S ENTERPRISE L1 | S..S. ELECTRIC CO. L8 | Shubham Enterprise L4 | Aditya Construction L2 | TAMALIKA ENTERPRISE L9 | NANDA CONSTRUCTION L3 | DAS ENTERPRISE L7 | ALOKE ENGINEERING AND COMPANY L5 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavation in trenches in soft / loose soil not exceeding 1.5 metre wide and not exc 1.5 metre in depth and getting out for taking out / laying of GI / DI pipe line and making bottom surfaces of excavation leveledand to a gradient complete all as specified and directed . | 449.5 | CUM | 450 ₹2,02,275 | 180 ₹80,910 Lowest | 446 ₹2,00,477 | 421 ₹1,89,239.5 | 409 ₹1,83,845.5 | 420 ₹1,88,790 | 240 ₹1,07,880 | 469 ₹2,10,815.5 | 400 ₹1,79,800 |
| 2.00 | Excavation in trenches in hard /dense soil not exceeding 1.5 metre wide and not exc 1.5 metre in depth and getting out for taking out / laying of GI / DI pipe line and making bottom surfaces of excavation leveledand to a gradient complete all as specified and directed . | 100 | CUM | 680 ₹68,000 | 280 ₹28,000 Lowest | 689 ₹68,900 | 636 ₹63,600 | 650.01 ₹65,001 | 750 ₹75,000 | 550 ₹55,000 | 689 ₹68,900 | 700 ₹70,000 |
| 3.00 | Returning, filling in trenches with excavated soil including spreading, levelling, watering and well ramming in layers not exceeding 25 cm complete all as specified and directed. | 467.03 | CUM | 170 ₹79,395.1 | 180 ₹84,065.4 | 125 ₹58,378.75 | 119 ₹55,576.57 | 117 ₹54,642.51 Lowest | 200 ₹93,406 | 210 ₹98,076.3 | 182 ₹84,999.46 | 180 ₹84,065.4 |
| 4.00 | Removing surplus rocks to a distance not exceeding 50 metre away and depositing where directed at a level not exceeding 1.5 metre above the starting point complete all as specified and directed. | 22.4 | CUM | 270 ₹6,048 | 180 ₹4,032 Lowest | 254 ₹5,689.6 | 248 ₹5,555.2 | 240 ₹5,376 | 230 ₹5,152 | 280 ₹6,272 | 277 ₹6,204.8 | 250 ₹5,600 |
| 5.00 | Removing surplus soil /spoil to a distance not exceeding 50 metre away and depositing where directed at a level not exceeding 1.5 metre above the starting point complete all as specified and directed. | 60 | CUM | 390 ₹23,400 | 180 ₹10,800 Lowest | 410 ₹24,600 | 389 ₹23,340 | 380 ₹22,800 | 310 ₹18,600 | 280 ₹16,800 | 400 ₹24,000 | 350 ₹21,000 |
| 6.00 | Taking down or taking up GI pipe and Supply and laying in trenches GI tubing 'Medium grade' 80 mm bore, with all fittings complete all as specified and as directed.
(Note: Excavation, returning filling & removing of earth work shall be measured and paid seperately). | 350 | RM | 1,140 ₹3,99,000 | 1,001 ₹3,50,350 Lowest | 1,134 ₹3,96,900 | 1,063 ₹3,72,050 | 1,050 ₹3,67,500 | 1,300 ₹4,55,000 | 1,100 ₹3,85,000 | 1,155 ₹4,04,250 | 1,100 ₹3,85,000 |
| 7.00 | Ditto all as per Item No. 6.00 above but 50mm bore complete all as specified and directed. | 515 | RM | 725 ₹3,73,375 | 601 ₹3,09,515 Lowest | 737 ₹3,79,555 | 710 ₹3,65,650 | 695 ₹3,57,925 | 800 ₹4,12,000 | 750 ₹3,86,250 | 731 ₹3,76,465 | 725 ₹3,73,375 |
| 8.00 | Ditto all as per Item No. 6.00 above but 40mm bore complete all as specified and directed. | 450 | RM | 715 ₹3,21,750 | 451 ₹2,02,950 Lowest | 678 ₹3,05,100 | 630 ₹2,83,500 | 640 ₹2,88,000 | 720 ₹3,24,000 | 640 ₹2,88,000 | 720 ₹3,24,000 | 695 ₹3,12,750 |
| 9.00 | Ditto all as per Item No. 6.00 above but 25mm bore complete all as specified and directed. | 680 | RM | 350 ₹2,38,000 | 381 ₹2,59,080 | 409 ₹2,78,120 | 388 ₹2,63,840 | 375 ₹2,55,000 | 350 ₹2,38,000 | 428 ₹2,91,040 | 355 ₹2,41,400 | 340 ₹2,31,200 Lowest |
| 10.00 | Ditto all as per Item No. 6.00 above but 20mm bore complete all as specified and directed. | 937 | RM | 300 ₹2,81,100 | 244 ₹2,28,628 Lowest | 322 ₹3,01,714 | 307 ₹2,87,659 | 295 ₹2,76,415 | 270 ₹2,52,990 | 330 ₹3,09,210 | 305 ₹2,85,785 | 290 ₹2,71,730 |
Tender Value
₹46.6 L
EMD Value
₹93,200
Closing Date
29 Aug 2026, 6:00 pmClosed
GE BARRACKPORE
Office of the GE BARRACKPORE, KOLKATA - 700120
SPL REPAIR TO WORN OUT AND CORRODED GI AND CI PIPELINES AT MANGAL VIHAR BH LINES AND ALBERT EKKA VIHAR BI LINE AT BARRACKPORE UNDER GE BARRACKPORE
2026_MES_783565_1
8279/E8
Open Tender
Civil Works
Item Rate
180 days
GE BARRACKPORE
AS PER TENDER DOCUMENT
3 documents required · 3 mandatory
₹500
GE BARRACKPORE
₹93,200
Yes
8 Oct 2026
8 Aug 2026
31 Aug 2026
8 Aug 2026
29 Aug 2026
22 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in trenches in soft / loose soil not exceeding 1.5 metre wide and not exc 1.5 metre in depth and getting out for taking out / laying of GI / DI pipe line and making bottom surfaces of excavation leveledand to a gradient complete all as specified and directed . | 449.5 | CUM | - | - |
| 2 | Excavation in trenches in hard /dense soil not exceeding 1.5 metre wide and not exc 1.5 metre in depth and getting out for taking out / laying of GI / DI pipe line and making bottom surfaces of excavation leveledand to a gradient complete all as specified and directed . | 100 | CUM | - | - |
| 3 | Returning, filling in trenches with excavated soil including spreading, levelling, watering and well ramming in layers not exceeding 25 cm complete all as specified and directed. | 467.03 | CUM | - | - |
| 4 | Removing surplus rocks to a distance not exceeding 50 metre away and depositing where directed at a level not exceeding 1.5 metre above the starting point complete all as specified and directed. | 22.4 | CUM | - | - |
| 5 | Removing surplus soil /spoil to a distance not exceeding 50 metre away and depositing where directed at a level not exceeding 1.5 metre above the starting point complete all as specified and directed. | 60 | CUM | - | - |
| 6 | Taking down or taking up GI pipe and Supply and laying in trenches GI tubing 'Medium grade' 80 mm bore, with all fittings complete all as specified and as directed.
(Note: Excavation, returning filling & removing of earth work shall be measured and paid seperately). | 350 | RM | - | - |
| 7 | Ditto all as per Item No. 6.00 above but 50mm bore complete all as specified and directed. | 515 | RM | - | - |
| 8 | Ditto all as per Item No. 6.00 above but 40mm bore complete all as specified and directed. | 450 | RM | - | - |
| 9 | Ditto all as per Item No. 6.00 above but 25mm bore complete all as specified and directed. | 680 | RM | - | - |
| 10 | Ditto all as per Item No. 6.00 above but 20mm bore complete all as specified and directed. | 937 | RM | - | - |
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.25 MB
BOQ_877926.xls
BOQ • 0.34 MB
Tenderdoc_8279.pdf
Tender Documents • 1.10 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .