| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.4 CrAdmitted-Finance | -26.77% | ₹3.4 Cr | L1 | Admitted-Finance |
| 2 | L2₹4.1 Cr+₹68.7 L (20.2%)Admitted-Finance | -11.99% | ₹4.1 Cr+₹68.7 L (20.2%) | L2 | Admitted-Finance |
| 3 | L3₹4.1 Cr+₹70.7 L (20.8%)Admitted-Finance | -11.55% | ₹4.1 Cr+₹70.7 L (20.8%) | L3 | Admitted-Finance |
| 4 | L4₹4.6 Cr+₹1.2 Cr (34.9%)Admitted-Finance | -1.20% | ₹4.6 Cr+₹1.2 Cr (34.9%) | L4 | Admitted-Finance |
| 5 | L5₹4.8 Cr+₹1.4 Cr (40.0%)Admitted-Finance | +2.50% | ₹4.8 Cr+₹1.4 Cr (40.0%) | L5 | Admitted-Finance |
Tender Value
₹4.6 Cr
EMD Value
₹9.3 L
Closing Date
18 May 2026, 5:00 pmClosed
SM (WC-2) Sector 19 Noida
SM (WC-2) Sector 19 Noida
M/o Road (Construction of R.C.C. Footpath repair of drain and fixing of drain cover at Sector-18 underpass to Noida Expressway M.P.-2 to Atta Peer Xing and Atta Peer Xing to Sector-16A Xing both side) Noida
2026_NOIDA_1144581_1
43/GM/SM(WC-2)/CB/ET/2025-26
Open Tender
Civil Works - Others
Fixed-rate
120 days
Noida
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,310
Yes
Noida
₹9.3 L
Yes
9 Jul 2026
4 May 2026
19 May 2026
4 May 2026
18 May 2026
4 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. In cement mortar | 197.5 | Cum. | 779.76 | ₹1,54,002.6 |
| 0.0 | Dismantling kerb stone (dismantling kerb stone by manual means and disposal of dismantled material with all lifts and upto a lead 1000 mtr.). | 2,736 | Rmt. | 10 | ₹27,360 |
| 0.0 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. The contractor has to detect different utilities like sewer line, water supply line, electric cable, telephone cable, gas pipe line etc. using utility detecting machine before start of excavation and shall start excavation only after getting permission of Engineer-in-Charge. | 1,305 | cum | 144.93 | ₹1,89,133.65 |
| 0.0 | Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead. For thickness of tiles above 25 mm and up to 40 mm | 1,130 | Sqm. | 28.79 | ₹32,532.7 |
| 0.0 | Taking out existing CC interlocking paver blocks from footpath/ central verge, including removal of rubbish etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge. | 1,815 | sqm. | 50 | ₹90,750 |
| 0.0 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent designn mix) | 421 | Cum | 923.42 | ₹3,88,759.82 |
| 0.0 | Earth work in excavation by Mecanical means ( Hydraulic Excavator ) Manual means over Areas Exclooding 30cm in Depth , 1.5m in With as well as 10 Sqm on Plan including getting out and disposal of Excavated earth load upto 50 m and Lift upto 1.5m as direction by engineer in Charge . The Contractor has defect different utilities like Sever line, water supply line, electric cable , Telephone Cable , Gas Pipe line Etc. using Utility Detecting Machine Before Start of Excavation and Shall atart Excavated only After Getting Permission on E/I. | 1,677 | Cum | 136 | ₹2,28,072 |
| 0.0 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (Zone-III) : derived from natural sources: 8 graded sone aggregate 40 mm nominal size derived from natural sources). | 393 | cum | 5,746.88 | ₹22,58,523.84 |
| 0.0 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. | 1,00,586 | kg | 82.81 | ₹83,29,526.66 |
| 0.0 | Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete | 2,987 | Sqm | 181.64 | ₹5,42,558.68 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.09 MB
TD43.pdf
Tender Documents • 9.29 MB
C43.xls
Additional Documents • 0.05 MB
BOQ_2138697.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .