Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance 11TH FLOOR OFFICE NO 1106 ELLORA FIESTA SEC 11 SANPADA THANE THANE MAHARASHTRA 400706 | THANE | MAHARASHTRA | 400706 | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance G 7 SNS INTERIO ALTHAN ROAD BHATAR CHAR RASTA SURAT GUJARAT 395007 | SURAT | GUJARAT | 395007 | Admitted-Finance |
| 5 | Rejected-Technical HOUSE NO 52 B BLOCK STREET NO 2 UTTARAKHAND ENCLAVE VILLAGE BURARI SHASTRI PARK NEAR DVS SCHOOL NORTH DELHI DELHI 110084 STREET NO 2 BURARI | CENTRAL DELHI | DELHI | 110084 | Rejected-Technical Commmerially not suitable hence rejected |
Tender Value
Refer Docs
Closing Date
21 Dec 2021, 11:00 amClosed
DGM CC AND PHS
ROOM NO.26 ADMIN BUIDLING
CAMC of Bosch make Fire alarm system installed at various location of the plants for the year 2021-2022 at RCF Ltd, Chembur, Mumbai .
2021_RCFL_660677_1
ET-CC/CAMC/BOSCH FA SYSTEM/21-22-59
Open Tender
Repair and Maintenance Services
Lump-sum
365 days
RCF TROMBAY
Please refer Tender documents.
10 documents required · 10 mandatory
₹0
Exempted
3 Feb 2022
1 Dec 2021
21 Dec 2021
1 Dec 2021
21 Dec 2021
1 Dec 2021
Amount
AMMONIA 1: Area Detail : control Room+ Battery RM in Cable Gallery+ Cable Gallery+ 3.3 Switch Gear+ Synloop UPS Room+ Synloop Battery Room + DG set + Transformer bays
Ammonia 1 switchgear :Area details- 11 KV Switchgear + Cable Gallery + Transformer Bays + Capacitor Banks
AMMONIA NAAST Area Detail : Control Room + Cable Gallery+ DG set Room+ NAAST battery Room+UPS Room )
NSGP Area Detail : Boiler 1MCC +Boiler 2 MCC+ Boiler 3 MCC+ WTP Control Room+ UPS 3+ UPS 3Battery Room+ UPS 4 battery Room+UPS 2+ UPS 2 Battery room+UPS 1+ UPS 1 Battery Room + TG MCC Room+ TG Batery Room+TG & AVR Charger Room+ static Excitation Panel+ Boiler 3 Control Room+ Boiler 2 Control Room+ Boiler 1 Control Room+11 KV SW Gear+ cable Gallery+ Transformer 1 to 7
CNA C NA MCC + C NA Control Room+ substation 7 &10 SW Gear+ Gallery+ Mechanical Department
ETP : ETP SW gear old MCC+ ETP Control Room+ ETP CHEM LAB+ETP New MCC
ANP : 11/3.3 KV SW Gear Control Room+2.6 MCC+ ANP Transformer 1 &2 + 11/3.3 Transformer 1 & 2 + CN/NP Transformer 1,2 &3+ ANP Control Room + ANP Cable gallery
NITRIC ACID: Control Room+ Transformer 1 &2 +Sodium nitrate MCC+ MCC SNNP+DG SET Room+ MCC 2 MPNAP+ UPS room 1st Flr CNTR RM
AMMONIA 5 Control Room+ 3.3 KV SW Gear + PGR SW Gear + Control Room UPS +Control Room PGR + Transformer (4 Nos.)+ DG Set Room + Cable Gallery PGR + LT SW Gear Cable Gallery + Control Room Compression House + Mass Spectrometer+ Chromatography.
AIR MONITORING STATION Station 1 + Station 2 + Station 3
PAP: DG Set Room + Pap SW Gear 5.5 +PAP Control Room.
STP: STP Control Room+ STP Chemical MCC+ STP inlet MCC+STP SW Gear+STP battery Room+ STP Battery Charge Room+ STP Plant Chemical Store 1+ STP plant Chemical store 2+ UPS battery Room.
UREA & ABC: Control Room + Urea MCC Battery Room + Urea MCC Electrical Store + Urea MCC Cable Gallery+ Cooling Tower MCC + ABC MCC + ABC Control Room + DG Set Room.
SUPHALA PLANT: Capacitor Bank Room + Transformer Bank A + Transformer Bank B + Transformer Bank C + DBM SW Gear + Transformer Bank D + MCC1 + Main Control Room +UPS Battery Room + Transformer E+ Transformer F + MCC2 + Control Room 2 (CRT)
ANP BAGGING: Control room + ANP SILO MCC
UREA BAGGING: UREA Bagging Control Room + UREA & ANP Bagging Gear (LT Gear) + SILO MCC + UB Bagg Transformer 1 + UB Bagg Transformer 2.
SUPHALA BAGGING & MATERIAL HANDLING : Material Handling Control Room + Sulpha Bagging Transformer 2 + Sulpha Bagging Transformer 1 + Electrical Dept. + UPS/Instrument Room + MCC Room + Sulpha Bagging Control Room.
ANP GRANULATION: DG Set Room + Transformer 1 + Transformer 2 + MCC Room 1 & 2 +VFD Room + AC MICC Room + Lift Room + Instrument DCS Panel Room .
METHANOL: Control Room + DCS Room + UPS Room + Package AC Room + Control Room 1St. Floor + DME + DME Battery Room + Lab + GC + 11 KV Switch Gear + Mug Excitation Room + 11 KV Switchgear Battery Room + Mug Excitation Room + 11 KV Switch Gear Battery Room + Supplementary Switchgear + Supplimentry Battery Switchgear + Supplimentry Charger Room + 11 KVA Entry MCP + Supplementary Entry MCP + 4.6 MVA Transformer 1 & 2 + 2 MVA Transformer A ,B + Cable Gallery.
HADWISE TECHNOLOGIES PVT LTD
K.K ENGINEERING WORKS
Transit Electronics Limited
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .