Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.0 LAccepted-Finance LOCATION UTTARAKHAND UT | ₹8.0 L | L1 | Accepted-Finance Lowest bidder |
| 2 | L2₹8.0 LRejected-Finance | ₹8.0 L | L2 | Rejected-Finance Second lowest bidder |
| 3 | L3₹8.0 LRejected-Finance | ₹8.0 L | L3 | Rejected-Finance Trhird lowest bidder |
| Sl No | Description | Qty | Unit | JAI LAKSHMI ASSOCIATE L2 | AJAY KUMAR CHAUHAN L1 | Hari Om Sai Electricals L3 |
|---|---|---|---|---|---|---|
| 1.00 | supply of Stay clamp for SP-21 with Nuts & bolts | 240 | Nos. | 205 ₹49,200 | 204 ₹48,960 | 205 ₹49,200 |
| 2.00 | supply ofShackle insulator 75x90 mm with Nuts & bolts | 250 | Nos. | 59 ₹14,750 | 59 ₹14,750 | 60 ₹15,000 |
| 3.00 | supply ofStay Insulator | 100 | Nos. | 23 ₹2,300 | 24 ₹2,400 | 24 ₹2,400 |
| 4.00 | supply of LT clamp SP-21 with Nuts & bolts | 250 | Nos. | 195 ₹48,750 | 194 ₹48,500 | 195 ₹48,750 |
| 5.00 | Errection of LT stay set | 45 | Nos. | 450 ₹20,250 | 449 ₹20,205 | 450 ₹20,250 |
| 6.00 | Grouting of stay set | 5 | CBm | 4,800 ₹24,000 | 4,800 ₹24,000 | 4,800 ₹24,000 |
| 7.00 | Excavation of pit for pole | 34 | CBm | 250 ₹8,500 | 249 ₹8,466 | 250 ₹8,500 |
| 8.00 | Errection of single SP-21 pole | 45 | Nos. | 550 ₹24,750 | 549 ₹24,705 | 550 ₹24,750 |
| 9.00 | Grouting of pole | 9 | CBm | 4,800 ₹43,200 | 4,800 ₹43,200 | 4,800 ₹43,200 |
| 10.00 | Muffing of pole | 45 | Nos. | 564 ₹25,380 | 563 ₹25,335 | 570 ₹25,650 |
Tender Value
₹9.5 L
EMD Value
₹26,000
Closing Date
16 Aug 2024, 4:00 pmClosed
EE
EDD,Ranikeht
Replacement of GI neutral wire in Jalali-Chaukhutia section of EDSD, Dwarahat
2024_UPCL9_74176_1
EDD(R)06/2024-25
Open Tender
Electrical Works
60 days
Chaukhutia
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
EE,EDD,Ranikhet
₹26,000
6 Jun 2026
3 Aug 2024
17 Aug 2024
3 Aug 2024
16 Aug 2024
3 Aug 2024
Amount
supply of Stay clamp for SP-21 with Nuts & bolts
supply ofShackle insulator 75x90 mm with Nuts & bolts
supply ofStay Insulator
supply of LT clamp SP-21 with Nuts & bolts
Errection of LT stay set
Grouting of stay set
Excavation of pit for pole
Errection of single SP-21 pole
Grouting of pole
Muffing of pole
Dismantling of LT line 1 P2 W(weasel)
Cartage SP-21/23 pole, 100-150 km
Cartage of petty material,100-150 km
Head load cartage of SP-21/23 pole(1-3 km)
Head load cartage of material (1-3 km)
Disconnection & reconnection of consumer
Laying weasel for Neutral on LT
Excavation of pit for stay set
JAI LAKSHMI ASSOCIATE
Hari Om Sai Electricals
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid