| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.4 LAdmitted-Finance | -20.00% | ₹5.4 L | L1 | Admitted-Finance |
| 2 | L2₹5.5 L+₹11,062.35 (2.05%)Admitted-Finance | -18.36% | ₹5.5 L+₹11,062.35 (2.05%) | L2 | Admitted-Finance |
| 3 | L3₹5.7 L+₹33,726.68 (6.25%)Admitted-Finance | -15.00% | ₹5.7 L+₹33,726.68 (6.25%) | L3 | Admitted-Finance |
| 4 | L4₹5.8 L+₹43,777.23 (8.11%)Admitted-Finance | -13.51% | ₹5.8 L+₹43,777.23 (8.11%) | L4 | Admitted-Finance |
| 5 | L5₹7.8 L+₹2.4 L (43.8%)Admitted-Finance | +15.00% | ₹7.8 L+₹2.4 L (43.8%) | L5 | Admitted-Finance |
Tender Value
₹6.8 L
EMD Value
₹13,500
Closing Date
12 Aug 2026, 3:00 pmClosed
EXECUTIVE OFFICER
MUNICIPAL BOARD PIPAR CITY
construction of bathroom sanaghar at nirmal ghat Near khakhiji bagichi pipar city
2026_DLB_582040_1
NIT NPPC 4909 DATE 03.08.2026
Open Tender
Civil Works
Percentage
90 days
PIPAR CITY
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
EO PIPAR CITY / MDRISL
₹13,500
Yes
19 Aug 2026
4 Aug 2026
13 Aug 2026
4 Aug 2026
12 Aug 2026
4 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level In all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc Depth upto 1.5 m | 8.44 | Cum | 229.5 | ₹1,936.98 |
| 2 | Providing and laying in position cement concrete of specified gradeexcluding the cost of centring and shuttering - All work upto plinthlevel : 1:4:8 (1 Cement : 4 fine/ coarse sand : 8 graded stone aggregate 40mm nominal size). | 1.13 | Cum | 4,575 | ₹5,169.75 |
| 3 | Random rubble masonry with hard stone in foundation and plinth : Cement mortar 1:6 (1 cement : 6 coarse sand) | 19.78 | Cum | 4,860 | ₹96,130.8 |
| 4 | Random rubble masonry with hard stone in foundation and plinth : Cement mortar 1:6 (1 cement : 6 coarse sand) Extra for random rubble masonry with hard stone in superstructure
above plinth level and upto two stories | 29.45 | Cum | 5,830 | ₹1,71,693.5 |
| 5 | Cement plastering including T&P, scaffolding, material and completelabour, including cost of water, curing, racking of joints etc. with 20mm mm cement plaster finished with a floating coat of neat cement of mix :1:4 (1 cement : 4 fine/ coarse sand) | 280 | Sqm | 294.5 | ₹82,460 |
| 6 | Providing at site, lowering & laying in trenches, aligning & jointing of U-PVC pipe as per IS 13592 (amended up to date) and as per specifications with rubber rings with socket and spigot joint, (EPDM/SBR) for all depths for pipe length as per drawing and specification including hydraulic field testing (including the cost and conveyance of water to site for testing) and commissioning etc complete as directed by Engineer for house sewer connection work. Note : E/w to be measured and paid separately. Length of pipe shall be measured in between the outer wall of two manholes / Inspection chambers. Pipe in the manhole/inspection chamber’s wall shall deemed to be included in the item of manhole/inspection chamber shall not be payable. 110 mm Nominal Dia | 20 | Rm | 245 | ₹4,900 |
| 7 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level :1:3:6 (1 Cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size). | 2.45 | Cum | 5,000 | ₹12,250 |
| 8 | Stone work (machine cut edges) for wall lining etc. (veneer work)backing filled with a grout of 12mm thick cement mortar 1:3 (1cement : 3 coarse sand) including pointing in white cement mortar 1:2 (1 white cement : 2 stone dust) with an admixture of pigmentmatching the stone shade : (To be secured to the backing by meansof cramps which shall be paid for separately) :Red sand stone - Exposed face machine cut and table rubbed with rough backing. 60mm | 25 | Sqm | 2,179 | ₹54,475 |
| 9 | Brick work with FPS bricks of class designation 75 in foundation and plinth in Cement mortar 1:4 (1 cement : 4 coarse sand) | 2.4 | Sqm | 5,600 | ₹13,440 |
| 10 | Providing and fixing 1st quality MAT & GLOSSY finished ceramic tiles colour such as standard white, grey, ivory, fume, red brown, light green, light blue, and other light shades with water absorbtion less than or equal to 0.08% confirming to IS : 13753 & IS : 15622 in floor, steps etc laid on bed on neat cement slury finished with flush pointing in the white cement mixed with pigment to match the shade of the tile complete (including the the cost of cement mortar bed 1:4)Size 300mm x 450mm | 92.5 | Sqm | 1,074 | ₹99,345 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.98 MB
BOQ_1034132.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .