| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹90,494Accepted-AOC VILLAGE BIDDI P O DARWAR TEHSIL DHARMPUR DISTT MANDI H P | ₹90,494 Quoted ₹90,493 | 1 | Accepted-AOC Accepted |
| 2 | 2₹95,340+₹4,847 (5.36%)Rejected-AOC | ₹95,340+₹4,847 (5.36%) | 2 | Rejected-AOC Reject |
| 3 | 3₹96,628+₹6,135 (6.78%)Rejected-AOC | ₹96,628+₹6,135 (6.78%) | 3 | Rejected-AOC Reject |
| Sl No | Description | Qty | Unit | Bhushan Sharma L2 | Hakam Chand Pathania L3 | Kuldeep kumar sharma L1 |
|---|---|---|---|---|---|---|
| 1.00 | Excavation in foundation, trenches etc. in all kinds of soil such as pick work jumper work, blasting work in soft/hard rock, chiselling in soft/hard rock including wedging out upto all lift, stacking the excavated soil upto all lead clear from the edge of excavation and then returning the stacked soil in 15cm layers when requaired into plinths, sides of foundation etc. consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth as per direction and to the entire satisfaction of Engineer-in-Charge upto all lead and lifts. | 1.71 | Cum | 350 ₹598.5 | 350 ₹598.5 | 150 ₹256.5 Lowest |
| 2.00 | Removal of slips in all kinds of soil (including saturated soil) but excluding boulders and rocky portion requiring blasting upto a distance of 20 mtrs disposing of un-serviceable materials, stacking serviceable materials and neatly dressing the surface as per direction and to the entire satisfasction of Engineer-in-Charge,. | 44.25 | Cum | 320 ₹14,160 | 350 ₹15,487.5 | 220 ₹9,735 Lowest |
| 3.00Providing form work with steel plates 3.15mm thick welded with angle iron in frame 30x30x5mm so as to give a fair finish including centring, shuttering strutting and propping etc. with wooden batten and ballies, in all heights of propping and centring below supporting floor to ceiling upto all height and removal of the same for insitu-reinforced concrete and plain concrete work in :- | ||||||
| 3.01 | Vertical surfaces such as wall (any thickness) partitions and the like including attached pillasters, buttresses plinth and string courses and the like in all leads and lifts as per direction and to the entire satisfaction of Engineer-in-charge. | 21.38 | Sqmt. | 400 ₹8,552 | 350 ₹7,483 | 300 ₹6,414 Lowest |
| 4.00Providing and laying cement concrete 1:3:6 (1 cement: 3 sand: 6 graded crushed stone agg. 40mm nominal size) and curing complete excluding cost of form work in foundation and plinth as per direction and to the entire satisfaction of Engineer-in-Charge. | ||||||
| 4.01 | Walls any thickness but not less than 0.1m thickness including attached pillaster buttresses, plinth and string courses from top of foundation upto two level all floor level as per direction and to the entire satisfaction of Engineer-in-Charge. | 10.29 | Cum | 7,000 ₹72,030 Lowest | 7,100 ₹73,059 | 7,200 ₹74,088 |
Tender Value
₹1.2 L
EMD Value
₹2,425
Closing Date
12 Feb 2026, 5:00 pmClosed
Executive Engineer
JS Division Dharampur Bharari
Deposit work SDF 2023 910 Restoration of rain damage LWSS Gharwasra in GP Gharwasra Tehsil Dharampur Distt Mandi HP
2026_HPIPH_127339_1
12891-12940 Dated 03-02-2026
Open Tender
Civil Works
Item Rate
90 days
Sajao
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
₹2,425
7 May 2026
3 Feb 2026
13 Feb 2026
3 Feb 2026
12 Feb 2026
3 Feb 2026
Excavation in foundation, trenches etc. in all kinds of soil such as pick work jumper work, blasting work in soft/hard rock, chiselling in soft/hard rock including wedging out upto all lift, stacking the excavated soil upto all lead clear from the edge of excavation and then returning the stacked soil in 15cm layers when requaired into plinths, sides of foundation etc. consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth as per direction and to the entire satisfaction of Engineer-in-Charge upto all lead and lifts.
Removal of slips in all kinds of soil (including saturated soil) but excluding boulders and rocky portion requiring blasting upto a distance of 20 mtrs disposing of un-serviceable materials, stacking serviceable materials and neatly dressing the surface as per direction and to the entire satisfasction of Engineer-in-Charge,.
Providing form work with steel plates 3.15mm thick welded with angle iron in frame 30x30x5mm so as to give a fair finish including centring, shuttering strutting and propping etc. with wooden batten and ballies, in all heights of propping and centring below supporting floor to ceiling upto all height and removal of the same for insitu-reinforced concrete and plain concrete work in :-
Vertical surfaces such as wall (any thickness) partitions and the like including attached pillasters, buttresses plinth and string courses and the like in all leads and lifts as per direction and to the entire satisfaction of Engineer-in-charge.
Providing and laying cement concrete 1:3:6 (1 cement: 3 sand: 6 graded crushed stone agg. 40mm nominal size) and curing complete excluding cost of form work in foundation and plinth as per direction and to the entire satisfaction of Engineer-in-Charge.
Walls any thickness but not less than 0.1m thickness including attached pillaster buttresses, plinth and string courses from top of foundation upto two level all floor level as per direction and to the entire satisfaction of Engineer-in-Charge.
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.61 MB
Form6.pdf
Tender Documents • 0.82 MB
Form8.pdf
Tender Documents • 1.29 MB
TC.pdf
Tender Documents • 0.14 MB
BOQ_188012.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .