Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹16.5 L
EMD Value
₹16,600
Closing Date
5 Jun 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer, Sujlam Suflam Spreading Channel Dn.No.1, Himatnagar
Repairing Work to damaged Vatrak Escape Apron At Ch. 104.130 Km Of Sujlam Suflam Spreading Canal
307527
2 of 2026-2027
Open
Civil Works
Works
Sabarkantha
6 documents required · 6 mandatory
₹900
The Executive Engineer, Sujlam Suflam Spreading Channel Dn.No.1, Himatnagar
₹16,600
22 May 2026
22 May 2026
22 May 2026
5 Jun 2026
22 May 2026
120 days
: : SCHEDULE - B : :
Name of Work :- Repairing Work to damaged Vatrak Escape Apron At Ch. 104.130 Km Of Sujlam Suflam Spreading Canal
MEMORANDUM SHOWINGTHE DETAILS OF ITEM OF WORKS TO BE CARRIEDOUT
Item Estimated Unit Item of works Estimated Rates in Rs. AMOUNT
In figure In words Rs. – P.
Dewatering during excavation of canals,drains,foundation Rupees Fifty Three
1 825.00 Hp/Hr trenches etc. by using pumps of suitable capacity either 53.80 And Paise Eighty
diesel or electric driven including cost of labour,pipes etc. Only
for delivery distance beyond 100mt. ( By machinary)
Clearing the canal Banks outer and inner Slopes by
Jungle Cutting ,removing Vegetation, Ghabajaria, Rupees Ten And
Trees,etc.along with burning it's and carrying away as Paise Thirty Only
and where required and as directed etc. completed by
Item No.:-3 Rupees One
Dismantling the R.C.C. work and disposing off the stuff Thousand Seven
3 25.03 Cum including stacking of the useful materials etc. complete 1732.80 Hundred Thirty Two
as directed. Light Reinforcement ( Main bar upto 16 mm. And Paise Eighty
Providing & Laying in position "NOMINAL MIX" cement
concrete using cement, sand and crushed aggregate by
mass and machine mix for C.C./R.C.C work incl.
necessary formworks centering, scaffolding, compaction
by vibrator, curing as directed with all lead & lift etc
3047.00 Thousand Forty
complete Without Dewatering and excluding cost of steel
reinforcement.S-3(A)(A) For Foundation concrete /
General purposeS-3(A)b(b) C. C. Nominal Mix, M-10
Providing & Laying in position "DESIGN MIX" cement
concrete using cement sand and crushed aggregate for Rupees Four
C.C./ R.C.C work by "FLORI" including necessary Thousand Six
formwork, centering, scaffolding, compaction by vibrator, Hundred Fifty One
curing as directed with all lead & lift etc complete without Only
dewatering and excluding the cost of steel
reinforcement.(e) Concrete grade M-25 and MSA-20 mm
Providing & Placing in position reinforcement bars Rupees Eighty Two
6 1.93 MT including cutting, bending, welding joints where 82019.00 Thousand Nineteen
necessary, hooking etc. complete as per drawing for all Only
lead and lifts. TMT / CRS (FE 500 D)
Item No.:-7 Rupees One
Excavation in all sorts of soil .By machinery including Thousand Seven
preparing etc.comp. (where qty can not be measured) Hundred Sixty Nine
J.C.B. 4CX Only
Excavation in all sorts of soil .By machinery including
preparing etc.comp. (where qty cannot be measured)
661.00 Hundred Sixty One
Tractor with Trailor,
Item No.:-9 Rupees One
Providing and laying rubble for appron ( each stone Thousand Seventy
weighting not less than 40Kg. ) including and packing
Three And Paise
and filing in the interestices with quarry-spalls. Eight Only
Total Amount - Rs
Total Amount - Rs
Total Amount in Words Rs. Rupees Sixteen Lakh(s) Fifty One Thousand Seventy Eight And Paise One Only
Total Amount in Words Rs. Rupees Sixteen Lakh(s) Fifty One Thousand Seventy Eight And Paise One Only
I/We _____________________________________ am/are willing to carry out the work at ____________________% above / below (should be written in figure
and words) the tendered amount mentioned above. Amount of my / our tender work out as under:-
The labour cess will be deducted as per prevailing rules i.e.1% of the work done.
2 GST and Income tax TDS will be deducted at a source while making payments of bills
3 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R. NO. : MIS102010/17/K1
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
POL.pdf
SBD Performance Security Clause changes.pdf
SBD vatrak escape.pdf
BOQ VATRAK ESCAPE _1_ _1_.pdf
Tender Notice No.2 2026-27 signed.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .