| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.4 LAccepted-AOC | ₹6.4 L | L1 | Accepted-AOC L1 |
| 2 | L2₹6.5 L+₹7,538.58 (1.17%)Rejected-AOC | ₹6.5 L+₹7,538.58 (1.17%) | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | K N SASIDHARAN L1 | Sarvabhowman L2 |
|---|---|---|---|---|---|
| 1.00ReTarring | |||||
| 1.00 | OD105158/2026-2027:Scarifying Existing Road Surface to a Depth of 150 mm by Mechanical Means and compacting aggregate obtained from scarifying with
power roller | 273.6 | sqm | 7.8 ₹2,134.08 Lowest | 9.2 ₹2,517.12 |
| 1.00 | 4.9:Wet Mix Macadam <br> Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. <br> By Mechanical Means with 1 km lead | 20.52 | cum | 3,750.64 ₹76,963.13 Lowest | 3,751.64 ₹76,983.65 |
| 1.00 | 75.5.1.1pb:Prime Coat - Low porosity - With Packed Bitumen Rates <br> Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 | 273.6 | sqm | 80.37 ₹21,989.23 Lowest | 82.37 ₹22,536.43 |
| 1.00 | 75.5.2.3pb:Tack Coat - With Packed Bitumen Rates <br> Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503. | 273.6 | sqm | 18.9 ₹5,171.04 Lowest | 19.2 ₹5,253.12 |
| 1.00 | 75.5.5.A.1pb:Modified Penetration Macadam 50 mm thick using Bitumen S-65 - Packed Bitumen Rates <br> Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506. | 127.71 | sqm | 316.22 ₹40,384.46 Lowest | 317.22 ₹40,512.17 |
| 1.01 | 75.5.5.B.2pb:Modified Penetration Macadam 75 mm thick using Bitumen S-65 - Packed Bitumen Rates <br> Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506. | 111.8 | sqm | 409.92 ₹45,829.06 Lowest | 410.92 ₹45,940.86 |
| 1.01 | 75.5.2.1pb:Tack Coat - With Packed Bitumen Rates <br> Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. | 1,202.4 | sqm | 16.07 ₹19,322.57 Lowest | 17.07 ₹20,524.97 |
| 1.01 | OD106927/2026-2027:Mix Seal Surfacing - Manual Means - Type A - Bitumen S-65 using Shredded Plastic Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates coated with shredded plastic (3% by weight of bitumen) as per standard procedure using penetration grade bitumen to required line, grade and level to serve as wearing course on a
previously prepared base, including mixing in a suitable plant, laying and rolling with a three
wheel 8-10 kN static roller and finishing to required level and grades as per Technical specification Clause 509 By Manual Means:- Type A (II) Bitumen (S-65) | 1,476 | sqm | 293.38 ₹4,33,028.88 Lowest | 293.38 ₹4,33,028.88 Lowest |
| 1.01 | OD105157/2026-2027:Quarry muck filling in uniform layers on prepared surface, and compacting by ramming to achieve the desired density complete as per Clause 401.4 as per Technical Specifucation Clause 408. (without roller) | 4.4 | cum | 947.54 ₹4,169.18 Lowest | 950.54 ₹4,182.38 |
Tender Value
₹6.4 L
EMD Value
₹16,101
Closing Date
29 Jul 2026, 3:00 pmClosed
Assistant Engineer
O/o Assistant Engineer, LIDEW Section,Thalayazham
Annual Plan-P. No.76/26-27-Madappally Mathunkal Road Maintenance in Ward 11,12 in Thalayazham GP-
2026_LSGD_861309_9
ET1/AE/LIDEW/TZM/2026-27
Open Tender
Civil Works - Roads
Item Rate
240 days
Thalayazham
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,420
₹16,101
19 Sept 2026
18 Jul 2026
30 Jul 2026
18 Jul 2026
29 Jul 2026
18 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1ReTarring | |||||
| 1.001 | OD105158/2026-2027:Scarifying Existing Road Surface to a Depth of 150 mm by Mechanical Means and compacting aggregate obtained from scarifying with
power roller | - | sqm | - | - |
| 1.002 | 4.9:Wet Mix Macadam <br> Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. <br> By Mechanical Means with 1 km lead | 1 | cum | - | - |
| 1.003 | 75.5.1.1pb:Prime Coat - Low porosity - With Packed Bitumen Rates <br> Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 | - | sqm | - | - |
| 1.004 | 75.5.2.3pb:Tack Coat - With Packed Bitumen Rates <br> Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503. | - | sqm | - | - |
| 1.005 | 75.5.5.A.1pb:Modified Penetration Macadam 50 mm thick using Bitumen S-65 - Packed Bitumen Rates <br> Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506. | 1 | sqm | - | - |
| 1.006 | 75.5.5.B.2pb:Modified Penetration Macadam 75 mm thick using Bitumen S-65 - Packed Bitumen Rates <br> Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506. | 1 | sqm | - | - |
| 1.007 | 75.5.2.1pb:Tack Coat - With Packed Bitumen Rates <br> Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. | - | sqm | - | - |
| 1.008 | OD106927/2026-2027:Mix Seal Surfacing - Manual Means - Type A - Bitumen S-65 using Shredded Plastic Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates coated with shredded plastic (3% by weight of bitumen) as per standard procedure using penetration grade bitumen to required line, grade and level to serve as wearing course on a
previously prepared base, including mixing in a suitable plant, laying and rolling with a three
wheel 8-10 kN static roller and finishing to required level and grades as per Technical specification Clause 509 By Manual Means:- Type A (II) Bitumen (S-65) | - | sqm | - | - |
| 1.009 | OD105157/2026-2027:Quarry muck filling in uniform layers on prepared surface, and compacting by ramming to achieve the desired density complete as per Clause 401.4 as per Technical Specifucation Clause 408. (without roller) | - | cum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1456690.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.20 MB
NIT76.pdf
Tender Documents • 0.03 MB
BID76.pdf
Tender Documents • 1.69 MB
BOQ_1456690.xls
BOQ • 0.30 MB
combinepdf.pdf
Tender Documents • 3.36 MB
Timeextension.pdf
PDF • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .