Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance N A | FARIDABAD | HARYANA | 121004 | Admitted-Finance |
| 5 | Admitted-Finance JAMMU AND KASHMIR JAMMU AND KASHMIR | JAMMU | JAMMU AND KASHMIR | 181122 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹40,000
Closing Date
6 Jul 2023, 4:00 pmClosed
Executive Engineer
Office of the Executive Engineer, Electric Division Vijaypur, JPDCL Jammu
Rate Contract For Supply , Erection, Testing and Commissioning of 250 KVA Distribution Substation along with Laying of HT and LT line within the Jurisdiction of Electric Division Vijaypur, JPDCL ,Jammu
2023_PDD_216855_1
EDV/ 13 of 2023-24 Dt 15-06-2023
Open Tender
Electrical Works
Turn-key
30 days
Samba District
Please refer Tender documents.
9 documents required · 9 mandatory
₹1,000
Executive Engineer Electric Division Vijaypur
₹40,000
Office of the Executive Engineer at Vijaypur
1 Nov 2023
15 Jun 2023
7 Jul 2023
16 Jun 2023
6 Jul 2023
16 Jun 2023
16 Jun 2023 - 6 Jul 2023
30 Jun 2023
Amount
Scope of Works for Supply, Erection, Testing & Commissioning of 250 KVA Distribution transformer sub station
Supply, Installation testing & commissioning of 11/0.433 KV, 250KVA 3-Phase Distribution Transformerwith Bi-metallic terminal Connectors, Energy Level: 2, "BIS Marked" (Copper Wound) with LV Cable Box having detachable AluminiumGland
Supply, Transportation, Erection of 9 Mtr Long PCC Pole (WL-300 KG) including excavation of pit and back filling of soil & consolidating by ramming, watering etc.
Supply, Transportation, Erection of 9 Mtr LongST Poles (ST410-SP33) including excavation of pit and back filling of soil & consolidating by ramming, watering etc.
Supply, Transportation, Fabrication & Fixing of GI Channel Iron, GI Cross arm , GI Angle Iron Braces, Clamps etc duly fabricated, red oxide & aluminum paint coated including all necessary Nut & Bolts & Washers etc.
Supply, Installation, Testing & Commissioning of 11 KV GO, AB Switch 3-Phase, 3-Pole, 200 Amp, Vertical Type
Supply, Installation, Testing & Commissioning of 11 KV Horn Gap Fuse Set 3 Phase 200 A .
Supply & Fixing of Gapless Surge Arrestor,9 kV ,10 kA ,LA with polymer housing, Stn. Type
Providing & Fixing of 300 mm² Single-Core Cable,1.1kV Grade, PVC Insulated Stranded Conductor FRLS type an fixing of Aluminium Thimbles
Providing & Fixing of Distribution Box for 250kVA DTR with MCCB for incomer & SFU's for Outgoing Circuits
Providing of Earthing of substation --Excavation of earth pit of dia. 650 mm & depth 3000 mm, installation of Earthing pipe of 40 mm Nominal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239.GIStrip for neutral earthing of size 25 mm x 3 mm for connection of transformer body ,G.O Set &lightening arrestor as per IS 2629/85, GI nuts &bolts ,refilled with earth enhancement materials and earth Chamber made of brick masonary with RCC slab cover.
Providing of Cement bottoming 1:2:4 mix as per REC standards 0.45cum /pole Complete job
Painting of ST Poles with Red Oxide Paint and Al. Paint (2 Coat Each)
Providing of Stone Pad 300mmx300mmx75mm
Providing & Fixing of 11kV Polymeric composite Pin Insulator 12kV, 5kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm
Providing & Fixing of 11kV Polymeric composite Disc Insulator 12kV,min failing load 45kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm
Providing & Fixing of Anti Climbing device with Clamps
Providing & Fixing of Danger Plates with Clamps
Providing & Fixing of Galvanized Stay Set with 50x8mm stay clamp, guy insulator(2Nos.), anchor plate (200x 200 x 6 mm),nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia. GI stranded wire complete
Providing and fixing of P G Clamps
SCOPE OF WORK FOR LAYING OF HT LINE ON 9 MTR PCC/ST POLES USING ACSR WEASEL CONDUCTOR (1Km)
Supply, Transportation, Erection of 9 Mtr LongST Poles (ST410-SP33) including excavation of pit and back filling of soil & consolidating by ramming, watering etc.
Supply, Transportation, Erection of 9 Mtr Long PCC Pole (WL-300 KG) including excavation of pit and back filling of soil & consolidating by ramming, watering etc.
Supply, Transportation, Fabrication & Fixing of GI Channel Iron, Cross arm, GI Angle Iron Braces, Clamps etc duly fabricated, red oxide & aluminium paint coated including all necessary Nut & Bolts & Washers etc.
Supply, Laying & Stringing of ACSR Weasel Conductor on GI Cross armI through insulators including proper binding & twisting with soft Aluminium Wire
Supply Installation, Testing & Commissioning of 11kV Polymeric composite Pin Insulator 12kV, 5kN,Lighting Impulse 75kV Positive and 80kV Negative,creepage distance 320mm
Supply Installation, Testing & Commissioning of 11kV Polymeric composite Disc Insulator 12kV,minfailing load 45kN, Lighting Impulse 75kV Positiveand 80kV Negative, creepage distance 320mm
Providing & Fixing of Galvanised Stay Set with 50 x 8 mm Stay Clamp, Guy Insulator (2 Nos), Anchoring Plate (200 x 200 x 6 mm), Nut & Bolts, 2 No Turn Buckle, 1.8m long, 16 mm diameter solid Stay Rod & 7/3.15 mm dia stranded wire complete
Providing & Fixing of Danger Plates with Clamps
Providing & Fixing of Anti Climbing device with Clamps
Providing of Earthing Complete by GI Pipe 40 mm or GI Rod 20 mm, 2.5 Mtr Long through GI Strip
Providing of Cement bottoming 1:2:4 mix as per REC standards 0.45cum /pole Complete job
Painting of ST Poles with Red Oxide Paint and Al. Paint (2 Coat Each)
Providing of Stone Pad 300 mmx300mmx75mm
Providing and fixing of Aluminium Jointing sleeves
Providing and fixing of P G Clamps
SCOPE OF WORK FOR LAYING OF LT LINE ON 8 MTR PCC/ ST POLES USING ACSR WEASEL CONDUCTOR ( 3 Phase 4 wire/2 Phase3 wire/1 phase 2 wire)
Supply, Transportation, Erection of 8 Mtr Long PCC Pole (WL-250 KG) including excavation of pit and back filling of soil & consolidating by ramming, watering etc.
Supply, Transportation, Erection of 8 Mtr Long ST Pole (ST-410 SP-15) including excavation of pit and back filling of soil & consolidating by ramming, watering etc
Providing & Fixing of MS U-Clamp with Shackle Insulator (Polymer/Porcelain) alongwith Nut & Bolt of sorts
Supply, Laying & Stringing of ACSR WeaselConductor through insulators including proper binding & twisting with soft Aluminium Wire(three Phase four wire)
Supply, Laying & Stringing of ACSR WeaselConductor through insulators including proper binding & twisting with soft Aluminium Wire(Two Phase three wire)
Supply, Laying & Stringing of ACSR WeaselConductor through insulators including proper binding & twisting with soft Aluminium Wire((single Phase Two wire)
Providing & Fixing of Galvanised Stay Set with 50 x 8 mm Stay Clamp, Guy Insulator (2 Nos), Anchoring Plate (200 x 200 x 6 mm), Nut & Bolts, 2 No Turn Buckle, 1.8m long, 16 mm diameter solid Stay Rod & 7/3.15 mm dia stranded wire complete
Providing of cement Bottoming 1:2:4 mix as per REC Standards 0.45 cum/Pole complete Job
Providing & Fixing of Danger Plates with Clamps
Providing & Fixing of Anti Climbing device with Clamps
Providing & Fixing of LT Line Spacers
Providing of Earthing Complete by GI Pipe 40 mm or GI Rod 20 mm, 2.5 Mtr Long through GI Strip
Providing of Stone Pad 300 mmx300mmx75mm
Providing and fixing of Aluminium sleeves
Painting of ST Poles with Red Oxide Paint and Al. Paint (2 Coat Each)
MAHA SHAKTI ELECTRICAL WORKS
M/S RATHER CONSTRUCTIONS AND TRADERS
Pawan Kumar
SUNIL KUMAR SURI CONTRACTOR
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .