Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance 704 SILVER DEAL DAFFODIL WING 1 B T KAWADE ROAD PUNE 411 001 | PUNE | PUNE | MAHARASHTRA | 411001 | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
| 5 | Admitted-Finance 0001D ATM HOUSE AIR FORCE NEENA THAPA GORAKHPUR UTTAR PRADESH 273008 UDYAM UP 32 0054752 | GORAKHPUR | UTTAR PRADESH | 273008 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹46,000
Closing Date
12 Jul 2021, 6:00 pmClosed
GE AF BIDAR
GE AF Bidar, Naubad road, Bidar, Karnataka 585401
MAINTENANCE AND OPERATION OF ELECTRIC SUPPLY INSTALLATIONS AND DG SETS AT MAFI SUB STATION 1 AND 2 AND HANGER NO 6 AT AFS BIDAR
2021_MES_450922_1
8284/E8
Open Tender
Civil Works
Item Rate
335 days
GE AF BIDAR
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
GE AF Bidar
₹46,000
Yes
20 Jul 2021
12 Jun 2021
13 Jul 2021
12 Jun 2021
12 Jul 2021
28 Jun 2021
Amount
Maintenance and operation with One Skilled Electrician/FGM per shift of 8 hours each for three shifts per day on all days including Sundays & Holidays, for Indoor sub station complete with APFC Panel-01 No, Transformer 750 KVA - 01 No, HT VCB 630 Amps – 06 Nos, Voltage stabilizer 750 KVA - 01No, Isolation transformer 750 KVA, LT Panel board – 03 Nos and maintain record of day to day complaints in Tech area all as directed and specified. (Location: NEW ATC MAFI Substation No 1) Shift Timings:- (i) First shift:- 0600 hrs to 1400 hrs. (ii) Second Shift:- 1400 hrs to 2200 hrs. (iii) Third shift:- 2200hrs to 0600 hrs.
Maintenance and operation with One Skilled Electrician/FGM per shift of 8 hours each for three shifts per day on all days including Sundays & Holidays, for Indoor sub station complete with APFC Panel-01 No, Transformer 200 KVA - 01 No, HT VCB 630 Amps – 06 Nos, Voltage stabilizer 200 KVA - 01 No, Isolation transformer 200 KVA - 01 No, LT Panel board – 03 Nos & DG Set 200 KVA- 01 No all as directed and specified. (Location: HQ Bldg MAFI Substation No 2). Shift Timings:- (i) First shift:- 0600 hrs to 1400 hrs. (ii) Second Shift:- 1400 hrs to 2200 hrs. (iii) Third shift:- 2200hrs to 0600 hrs.
Maintenance and operation with One Skilled Electrician/FGM per shift of 8 hours each for two shifts per day on all days including Sundays & Holidays, for Sub station complete with APFC Panel-01 No, Transformer 750 KVA - 01 No, VCB 11 KV 630 Amps – 01 No, Voltage stabilizer 750 KVA - 01, Bore wells - 02 Nos, LT Panel board – 02 Nos, DG Set 1000 KVA - 01 No all as directed and specified. (Location: Hanger No. 6). Shift Timings:- (i) First shift:- 0600 hrs to 1400 hrs. (ii) Second Shift:- 1400 hrs to 2200 hrs. Note for Sl item No 1 to 3 : (i) General cleanliness of power houses to be maintained. (ii) Monitor/Recording of following parameters i.e, HT voltage, Frequency, LT voltage, current of panels, Engine Temp, Oil & Pressure, RPM for DG Sets in Log sheets. (iii) Daily checking (Fuel, Oil, water, maintenance) of Gen Sets, Plants to be carried out in each shift. (iv) HT break down / Shut down register be maintained separately in Hanger No 6 power house. (v) Number of shifts in each installation will be as directed by Engineer-in-charge.
GOWRIPRIYA ENTERPRISES
om sai enterprises
M/S - KRUPA ELECTRICALS
M/s S.L.Chablani
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .