Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹28 LAccepted-AOC | 1 | Accepted-AOC lowewste | |
| 2 | 2₹23.1 L+₹12,493 (0.54%)Rejected-Finance | 2 | Rejected-Finance 2nd |
| Sl No | Description | Qty | Unit | Sulthan Bathery Labour Contract and Construction Co.Operative Societey Ltd. L2 | MALAYORAM LABOURCONTRACT CO OPERATIVE SOCIETY L1 |
|---|---|---|---|---|---|
| 1.00Kallinkara school | |||||
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 53.94 | cum | 325 ₹17,531.8 Lowest | 325 ₹17,531.8 Lowest |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 0.24 | cum | 7,290 ₹1,771.47 | 7,181 ₹1,744.98 Lowest |
| 1.00 | OD221511/2025-2026:DRY RUBBLE MASONRY - Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all material, labour charges etc, complete as per direction of Departmental officers at site | 130 | cum | 3,605 ₹4,68,650 | 3,590 ₹4,66,700 Lowest |
| 1.00 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 39.15 | sqm | 350 ₹13,702.5 | 349 ₹13,663.35 Lowest |
| 1.00 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 10.61 | cum | 9,600 ₹1,01,856 | 9,496 ₹1,00,752.56 Lowest |
| 1.01 | 5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.54 | cum | 11,800 ₹6,372 | 11,562 ₹6,243.48 Lowest |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 969.6 | kilogram | 103 ₹99,868.8 | 102 ₹98,899.2 Lowest |
| 1.01 | 10.25.2:Item Shifted to Sub head 14 as item 14.73
Item Shifted to head 14 as item 14.74
Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works | 327.6 | kg | 160 ₹52,416 Lowest | 161.5 ₹52,907.4 |
| 1.01 | 50.6.7.2:Laterate masonry with neatly dressed laterate stone of size 40x20x15cm or nearest size in cement mortar 1:6 for super structure above plinth level up to floor two level including all cost of materials, labour charges etc. | 34.8 | cum | 8,200 ₹2,85,360 | 8,116 ₹2,82,436.8 Lowest |
Tender Value
Refer Docs
EMD Value
₹5 L
Closing Date
16 Oct 2025, 12:00 pmClosed
ASSISTANT ENGINEER
koliyadi
Pr.No 163/25-26-Construction of compound wall for various schools,
2025_LSGD_804910_8
AE/LIDEW/NMN/ET/03/2025-26
Open Tender
Civil Works - Others
Item Wise
KOLIYADI
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹5 L
Yes
10 Mar 2026
6 Oct 2025
18 Oct 2025
6 Oct 2025
16 Oct 2025
6 Oct 2025
Amount
Kallinkara school
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
OD221511/2025-2026:DRY RUBBLE MASONRY - Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all material, labour charges etc, complete as per direction of Departmental officers at site
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources)
5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
10.25.2:Item Shifted to Sub head 14 as item 14.73 Item Shifted to head 14 as item 14.74 Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
50.6.7.2:Laterate masonry with neatly dressed laterate stone of size 40x20x15cm or nearest size in cement mortar 1:6 for super structure above plinth level up to floor two level including all cost of materials, labour charges etc.
13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)
13.37.1:White washing with lime to give an even shade:New work (three or more coats)
13.71:Lettering with black Japan pint of approved brand and manufacture
Malika school
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
OD221569/2025-2026:DRY RUBBLE MASONRY - Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all material, labour charges etc, complete as per direction of Departmental officers at site
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.22A.1:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Mild steel and Medium Tensile steel bars
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources)
13.33.1:Pointing on stone work with cement mortar 1:3 ( 1 cement : 3 fine sand):Flush/ Ruled pointing
50.6.7.2:Laterate masonry with neatly dressed laterate stone of size 40x20x15cm or nearest size in cement mortar 1:6 for super structure above plinth level up to floor two level including all cost of materials, labour charges etc.
13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)
13.37.1:White washing with lime to give an even shade:New work (three or more coats)
13.71:Lettering with black Japan pint of approved brand and manufacture
Sulthan Bathery Labour Contract and Construction Co.Operative Societey Ltd. (BID ID -2387165)
Bidder Name
MALAYORAM LABOURCONTRACT CO OPERATIVE SOCIETY
Sulthan Bathery Labour Contract and Construction Co.Operative Societey Ltd.
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1339627.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_6.pdf
PDF • 0.76 MB
Tendernotice_2.pdf
PDF • 0.12 MB
Tendernotice_4.pdf
PDF • 0.13 MB
Tendernotice_3.pdf
PDF • 0.44 MB
Tendernotice_1.pdf
PDF • 0.12 MB
Tendernotice_5.pdf
PDF • 0.25 MB
BOQ_1339627.xls
BOQ • 0.31 MB
viewsbd.pdf
Tender Documents • 2.43 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .