Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
Refer Docs
EMD Value
₹1.3 L
Closing Date
26 Oct 2026, 1:00 pm7d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Zonal Manager
PLOT NO. 56/1 LANE C-11, TURNER ROAD, DEHRADUN (UTTARAKHAND)
Restoration work of Chalina China to Selakot Kane Rikhad Mehragaon
2026_CCUK_149851_1
Restoration 2
National Competitive Bid
CIVIL
Item Rate
30 days
ALMORA
As per technical bid
3 documents required · 3 mandatory
₹5,900
Zonal Manager, NPCC LTD
₹1.3 L
17 Oct 2026
17 Oct 2026
26 Oct 2026
17 Oct 2026
26 Oct 2026
17 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation for retaining,breas twalls etc, inall types of soils and rocks including all lead, lift and disposal of surplus material asper direction of engineer- in- charge, as per drawing and technical specifications Clause 305.1 of MORD Specifiction | 166.42 | cu.m | 436.9 | ₹72,708.9 |
| 2 | Stonemasonry in cement mortar for substructure complete as per drawing& technical specification Clauses 702, 704, 1202 and 1204 | 372.98 | cu.m | 4,694.4 | ₹17,50,917.31 |
| 3 | Random Rubble Stone Masonry laid Dry,in breas twalls, retaining walls, etc. including supply of all material, labour, T&P and royaltiies etc. complete as per drawing and technical specifications Clauses702, 704, 1202 & 1203 of MORD Specifiction | 131.3 | cu.m | 2,293 | ₹3,01,070.9 |
| 4 | Hand Packed stone fillingin back of wallls including costof all materials, royality,T&Petc.complete as per direction of Engineer-in-charge. (Asper PWD Uttarakhand specifications) | 221.88 | cu.m | 1,085.3 | ₹2,40,806.36 |
| 5 | roviding and laying of boulder apron laid in wire crates with 4 mm dia GI wire (@ 32 Kg/ 10 Sqm) conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25 kg each as per drawing and technical specifications Clause 1301 | 191.25 | cu.m | 2,415.8 | ₹4,62,021.75 |
| 6 | Cement plumMasonrywith 40%plum& 60%1:3:6 cement concrete including supply of all material, labour, T&P etc. required for proper completionof thework.asperdrawingsandtechnicalspecificationsClause 802, 803, 1202 & 1203 of MORD Specifiction | 523.58 | cu.m | 4,554.9 | ₹23,84,854.54 |
| 7 | C.D Work (Scupper) | - | - | - | - |
| 8 | Excavation in foundation for retaining,breas twalls etc, inall types of soils and rocks including all lead, lift and disposal of surplus material asper direction of engineer- in- charge, as per drawing and technical specifications Clause 305.1 of MORD Specifiction | 56.16 | cu.m | 436.9 | ₹24,536.3 |
| 9 | Stonemasonry in cement mortar for substructure complete as per drawing& technical specification Clauses 702, 704, 1202 and 1204 | 20.61 | cu.m | 4,694.4 | ₹96,751.58 |
| 10 | Hand Packed stone fillingin back of wallls including costof all materials, royality,T&Petc.complete as per direction of Engineer-in-charge. (Asper PWD Uttarakhand specifications) | 9.35 | cu.m | 1,085.3 | ₹10,147.55 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.64 MB
SBD.pdf
Tender Documents • 1.29 MB
BOQ_236349.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .