| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹1.4 LAccepted-Finance | ₹1.4 L | L-1 | Accepted-Finance Due to L-01 |
| 2 | L-2₹1.7 L+₹26,195.50 (18.7%)Rejected-Finance | ₹1.7 L+₹26,195.50 (18.7%) | L-2 | Rejected-Finance Due to L-02 |
| 3 | Rejected-Technical | - | - | Rejected-Technical Experience, Not related to the work and Unvailid Registration |
| Sl No | Description | Qty | Unit | M/S MOHMMED AKHLAK L2 | JAGPAL SINGH L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.: All kinds of soil. | 7 | Cum | 250 ₹1,750 | 200 ₹1,400 Lowest |
| 2.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 0.5 | Cum | 3,900 ₹1,950 Lowest | 6,000 ₹3,000 |
| 3.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 2 | Cum | 8,500 ₹17,000 | 7,000 ₹14,000 Lowest |
| 4.00 | Centering and shuttering including strutting, propping etc. and removal of form for, Foundations, footings, bases of columns, etc. for mass concrete, | 4.5 | Sqm | 400 ₹1,800 | 300 ₹1,350 Lowest |
| 5.00 | Centering and shuttering including strutting, propping etc. and removal of form for, Columns, Pillars, Piers, Abutments, Posts and Struts | 3.5 | Sqm | 940 ₹3,290 | 300 ₹1,050 Lowest |
| 6.00 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level :Thermo-Mechanically Treated bars of grade Fe-500D or
more. | 149 | Kg | 100 ₹14,900 | 85 ₹12,665 Lowest |
| 7.00 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. kg | 758 | Kg | 145 ₹1,09,910 | 135 ₹1,02,330 Lowest |
| 8.00 | Providing and fixing bolts including nuts and washers complete. | 13.3 | Kg | 125 ₹1,662.5 | 80 ₹1,064 Lowest |
| 9.00 | Labour for Structural steel work riveted, bolted or welded in built up sections and framed work,including cutting, hoisting, fixing in position and applying a priming coat with priming material of approved steel primer all complete. | 243 | Kg | 54 ₹13,122 | 10 ₹2,430 Lowest |
| 10.00 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : Two or more coats on new work | 10 | sqm | 100 ₹1,000 | 90 ₹900 Lowest |
Tender Value
Refer Docs
EMD Value
₹3,200
Closing Date
21 Jul 2026, 5:00 pmClosed
Director CSIR CBRI Roorkee
CSIR CBRI Roorkee
Civil works Items
2026_CSIR_283304_1
193(695)EST-2026
Open Tender
Civil Works - Buildings
Item Rate
45 days
Director CSIR CBRI Roorkee
Please refer Tender documents.
10 documents required · 10 mandatory
₹590
Director CSIR CBRI Roorkee
₹3,200
24 Jul 2026
7 Jul 2026
23 Jul 2026
7 Jul 2026
21 Jul 2026
7 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.: All kinds of soil. | 7 | Cum | 260 | ₹1,820 |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 0.5 | Cum | 6,812 | ₹3,406 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 2 | Cum | 8,340.85 | ₹16,681.7 |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form for, Foundations, footings, bases of columns, etc. for mass concrete, | 4.5 | Sqm | 392.15 | ₹1,764.68 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for, Columns, Pillars, Piers, Abutments, Posts and Struts | 3.5 | Sqm | 961.3 | ₹3,364.55 |
| 6 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level :Thermo-Mechanically Treated bars of grade Fe-500D or
more. | 149 | Kg | 107.85 | ₹16,069.65 |
| 7 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. kg | 758 | Kg | 133.7 | ₹1,01,344.6 |
| 8 | Providing and fixing bolts including nuts and washers complete. | 13.3 | Kg | 159.35 | ₹2,119.36 |
| 9 | Labour for Structural steel work riveted, bolted or welded in built up sections and framed work,including cutting, hoisting, fixing in position and applying a priming coat with priming material of approved steel primer all complete. | 243 | Kg | 41 | ₹9,963 |
| 10 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : Two or more coats on new work | 10 | sqm | 155.9 | ₹1,559 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.27 MB
BOQ_330521.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .