The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments'' in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet
As per Standard Financial Criteria, the tenderers are required to submit audited balance sheet for the previous three financial years. Accordingly, the tenderers are required to submitted audited balance sheet for the financial years 2022-23, 2023-24 and 2024-25. However, in case balance sheet of the previous year i.e 2024-25 is yet to be prepared/ audited, the audited balance sheet of the fourth previous year i.e 2021-22 shall be considered. However, it should be invariably defined by the tenderer duly certified by the Chartered Accountant that balance sheet for 2024-25 is yet to be prepared / audited.
106 conditions · 1 needing a document upload
Beam bottom's line, level & width should be checked.
Beam side's line , level & plumb should be checked.
Beam to beam measurements shall be checked as per architectural drawing.
Individual level & diagonal of each slab bay shall be checked.
Slab thickness level shall be marked with nails on the peripheral beam's outer side.
Slab thickness & beam depths should be checked
Support props for slab & beam bottoms should be in line & plumb, Bamboo bracing should be done at around 4' ht from floor level. Support props for double staging terraces shall be carefully checked.
Line of external/peripheral beam's side shall be checked & should be cross supported to avoid building out of sides.
Junctions of column & beam shall be checked & should be cross supported to avoid building out of sides.
De-shuttering oil shall be applied to beam/slab shuttering
Formwork of staircase shall be checked for dimensions of tread and riser, level of treads, plumb of risers.
Reinforcement shall be checked for beams and slab as per RCC drawing.
Proper cover for bottom/sides shall be checked for beams.
Proper cover shall be checked for slab.
Electrical points, electrical piping (conduits)/fan hooks shall be checked as per drawing.
Reduction of column as per drawing shall be done if any.
Proper no. of chairs shall be provided for slab.
Parapet (pardi) bars shall be left for balconies/staircase etc.
Ring (stirrups) shall be provided at the free end of each column reinforcement
Gaps between plates/planks should be filled. Taping should be done at ply joints in care of ply shuttering
Approval of architect and RCC consultant shall be taken prior to pouring.
Check the availability of required labour strength, mixer, lift, vibrators, masons, weigh batcher, diesel/petrol and plastics sheets etc. before start of concreting.
Hidden beams/inverted beams/cantilever beams should be checked.
Check for the sunk if any as per the approved drawings.
Packing below supports props should be avoided. If not, single wooden plank should be inserted as packing
In case of large slabs, position of concrete joints shall be decided in advance as per approval by RCC consultant.
Availability of raw material for concrete/RMC per grade of concrete, water. Electricity shall be checked in advance before the start of concreting.
Concreting shall be done for the beams first & then slabs.
Compaction of concrete shall be done by vibrators & tamping rods. (Spare vibrators with fuel shall be ensured.)
The top level of slabs shall be finished by the mason and no one should be allowed to walk on the fresh finished concrete.
Carpenter shall be present below the slab shuttering during concreting to ensure the tightness of the form work.
In case of rains, the finished concrete shall be covered with the big plastic sheets.
Cast 6 cube moulds for testing.
Curing the slab shall be done with pounding method by making ponds in cement & sand mortar(1.10) of size around 5'X5' curing of beams and slabs shall be done for 7 to 10 days or as directed by the consultant.
Date of casting and slab no shall be painted on the front side beam.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Labour Cooperative Societies shall submit only 50% of bid security for which the tenderers are required to upload Registration certificate issued by appropriate authority without which their offer will not be considered. Such firms should also declare that -" We are a Labour Cooperative Society and our Registration No. is .................... with .......................and hence required to deposit only 50% of Bid Security
Any firm recognized by Department of Industrial Policy and Promotion (DIPP) as 'Startups' shall be exempted from payment of Bid Security on submission of Registration Certificate issued by appropriate authority. For such firms it is required to upload a copy of Registration Certificate issued by appropriate authority without which their offer will not be considered. Such firms should also declare that - I/We am/are a Startup firm registered by ........................ Department of Industrial Policy and Promotion (DIPP) and my registration number is ................ valid upto ...................... (Copy enclosed) and hence exempted from submission of Bid Security.
THE OFFERS WITHOUT EARNEST MONEY EXCEPT IN CASE OF EXEMPTION CLAIMED AS PER COMMERCIAL COMPLIANCE OF NIT WILL BE SUMMARILY REJECTED.
ADEN/ Dungarpur Subdivision: Dewatering of rainwater from RUB's during monsoon and similar work for year 2026 and 2027.
28-2026~NWR
28-2026
Open
Works - General
21 Months
Kota, Rajasthan
₹0
₹90,400
20 Apr 2026
27 Mar 2026
6 Apr 2026
2 items across 1 schedule · ₹2,38,27,386 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| 1 | Supplying, installation and commissioning digital signal modulator - Portable UP, DN & transmitter - "DSM25SUDM-1" for transmitting train approaching UP, DN & UD signals to corresponding digital signal receiver - (RAKSHAK) including maintenance for Two years. Specifications :- Working on VHF frequency 160.45 MHz. with antenna and cable, built battery 12V / 7AH, battery charger working 220VAC, incorporated with 12V DC battery with charger. charger should have a 13.8 V/2Amp CVCC mode for charging battery. portbale UP/DN transmitter should have following facility: mode switch to start & stop transmitter. mains socket connect 230VAC through mains cord, for charging battery. manual trigger switch, UP & DN transmitting signal manually. External terminal block screw connector (4way) for connecting "UP" trigger contact from relay room. "DN" trigger contact from Relay room. dimension 'portable UP/DN Transmitter" :- shall be less than 200x275x200mm (WXDXH). net weight " portable UP/DN transmitter" shall be less than 9kg. Note:- rate inclussive of all i.e. Excise tax, VAT/GST and installation charges. | of Each UD the the in on to for :- of | 28.00 | 5,13,300 | 1,43,72,400 |
| 2 | Supplying and commissioning digital signal receiver RAKSHAK to receive signal transmitted from digital signal modulator "DSM25S-UDM-1" including maintenance for Two years Specifications: working on VHF frequency 160.450MHz., inbuilt battery. Housing in small pocket model (mobile phone type) with built antenna and rechargeable battery. facility connect external battery charger. battery charging status is indicated by LED. belt-hanging arrangement. dimention of "RAKSHAK":- shall less than 20x50x150 (WXDXH), (H=100 unit + Antenna = 150). Net weight "RAKSHAK":- shall less than 150Gms. 5mm LED indication:- Signal received Blue LED DN Signal received Yellow LED. Bi Directional received Green LED. Note:- Rate inclusive of all i.e. Excise tax, VAT /GST and installation charges. | Each in to be 50 be UP | 307.00 | 30,798 | 94,54,986 |
| Schedule total | ₹2,38,27,386 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
TenderForm.pdf
ATTACHMENT
Specialconditions.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .