Loading…
Loading…
Tender Value
₹5.3 L
EMD Value
₹6,700
Closing Date
19 Oct 2026, 5:00 pm
AE (E and M), Mugma Area
Office of The General Manager, Mugma Area, P.O-Mugma, Dist.- Dhanbad, 828204
Making bathing ghat at Khoodia Pond of Khoodia Colliery under Lakhimata Group of Mines.
2026_ECL_366648_1
ECL/GM/MA/CE/26-27/e-Tender/92 Dt. 07.10.2026
Open Tender
Civil Works - Others
Percentage
60 days
Khoodia Colliery
Please refer Tender documents.
3 documents required · 3 mandatory
₹6,700
7 Oct 2026
7 Oct 2026
20 Oct 2026
7 Oct 2026
19 Oct 2026
8 Oct 2026
8 Oct 2026 - 15 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0 | Based on analysis | - | - | - | - |
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge.All kinds of soil | 81 | cum | 128.35 | ₹10,396.35 |
| 2 | Filling available excavated earth (excluding rock) in trenches, plinth. sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and for all lift | 80.85 | cum | 121.05 | ₹9,786.89 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 31.95 | cum | 5,434.55 | ₹1,73,633.87 |
| 4 | Brick work with common burnt clay modular bricks of class designation 7.5 in foundation and plinth in:Cement Mortar 1:6 (1 cement : 6 coarse sand). | 44.52 | cum | 4,327 | ₹1,92,638.04 |
| 5 | 12 mm cement plaster finished with a floating coat of neat cement of mix :1:4 (1 cement: 4 fine sand) | 210.53 | sqm | 294.85 | ₹62,074.77 |
| 6 | Total impact of GST for the purpose of CTC | 1 | Nos | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.77 MB
BOQ_379583.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .