Tender Value
₹2.5 Cr
EMD Value
₹5 L
Closing Date
8 Sept 2026, 3:00 pm
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Revenue
DENEAST
20 conditions · 2 needing a document upload
Financial Eligibility Criteria: The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
The balance sheet and all other financial documents attested/certified by CAs to substantiate fulfillment of financial eligibility criteria should be with UDIN (Unique Document Identification Number), failing which the offer is likely to be rejected without any further reference. (Authority: Chief Engineer/Works/SER/GRC's letter no. CE/G/Arb &Cont. Mgt./Tender Circular/Pt.I/317, dated 11.03.2025)
(Technical Eligibility Criteria: (a) The tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (i) Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or (ii) Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or (iii) One similar work costing not less than the amount equal to 60% of advertised value of the tender. (b) (1) In case of tenders for composite works (e.g. works involving more than one distinct component, such as Civil Engineering works, S&T works, Electrical works, OHE works etc. and in the case of major bridges - substructure, superstructure etc.), tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (i) Three similar works each costing not less than the amount equal to 30% of advertised value of each component of tender, or (ii) Two similar works each costing not less than the amount equal to 40% of advertised value of each component of tender, or (iii) One similar work each costing not less than the amount equal to 60% of advertised value of each component of tender. Note for b(1): Separate completed works of minimum required values shall also be considered for fulfillment of technical eligibility criteria for different components. (b)(2)In such cases, what constitutes a component in a composite work shall be clearly pre- defined with estimated tender cost of it, as part of the tender documents without any ambiguity. (b) (3) To evaluate the technical eligibility of tenderer, only components of work as stipulated in tender documents for evaluation of technical eligibility, shall be considered. The scope of work covered in other remaining components shall be either executed by tenderer himself if he has work experience as mentioned in clause 7 of the Standard General Conditions of Contractor through subcontractor fulfilling the requirements as per clause 7 of the Standard General Conditions of Contract or jointly i.e., partly himself and remaining through subcontractor, with prior approval of Chief Engineer in writing.
Defination of Similar Work :- Execution of any Civil Engineering Works.
However, if required in tender documents by way of Special Conditions, a formal agreement duly notarised, legally enforceable in the court of law, shall be executed by the main contractor with the subcontractor for the component(s) of work proposed to be executed by the subcontractor(s), and shall be submitted along with the offer for considering subletting of that scope of work towards fulfilment of technical eligibility. Such subcontractor must fulfill technical eligibility criteria as follows: The subcontractor shall have successfully completed at least one work similar to work proposed for subcontract, costing not less than 35% value of work to be subletted, in last 5 years, ending last day of month previous to the one in which tender is invited through a works contract. Note: for subletting of work costing up to Rs 50 lakh, no previous work experience of subcontractor shall be asked for by the Railway. In case after award of contract or during execution of work it becomes necessary for contractor to change subcontractor, the same shall be done with subcontractor(s) fulfilling the requirements as per clause 7 of the Standard General Conditions of Contract, with prior approval of Chief Engineer in writing. Note for Technical Eligibility Criteria: Work experience certificate from private individual shall not be considered. However, in addition to work experience certificates issued by any Govt. Organisation, work experience certificate issued by Public listed company having average annual turnover of Rs 500 crore and above in last 3 financial years excluding the current financial year, listed on National Stock Exchange or Bombay Stock Exchange, incorporated/registered at least 5 years prior to the date of closing of tender, shall also be considered provided the work experience certificate has been issued by a person authorized by the Public listed company to issue such certificates. In case tenderer submits work experience certificate issued by public listed company, the tenderer shall also submit along with work experience certificate, the relevant copy of work order, bill of quantities, bill wise details of payment received duly certified by Chartered Accountant, TDS certificates for all payments received and copy of final/last bill paid by company in support of above work experience certificate.
Credentials if submitted in foreign currency shall be converted into Indian currency i.e., Indian Rupee as under: The conversion rate of US Dollars into Rupees shall be the daily representative exchange rates published by the Reserve Bank of India or entity authorized by RBI to do so for the relevant date or immediately previous date for which rates have been published. Where, relevant date shall be as on the last day of month previous to the one in which tender is invited. In case of any other 1.2.1 currency, the same shall first be converted to US Dollars as on the last day of month previous to the one in which tender is invited, and the amount so derived in US Dollars shall be converted into Rupees at the aforesaid rate. The conversion rate of such currencies shall be the daily representative exchange rates published by the International Monetary Fund for the relevant date or immediately previous date for which rates have been published.
[Explanation for Eligibility Criteria: 1. Substantially Completed Work means an ongoing work in which payment equal to or more than 90% of the present contract value (excluding the payment made for adjustment of Price variation (PVC), if any) has been made to the contractor in that ongoing contract and no proceedings of termination of contract on Contractor's default has been initiated. The credential certificate in this regard should have been issued not prior to 60 days of date of invitation of present tender. 2. In case a work is started prior to 07 (seven) years, ending last day of month previous to the one in which tender is invited, but completed in last 07 (seven) years, ending last day of month previous to the one in which tender is invited, the completed work shall be considered for fulfillment of credentials. 3. If a work is physically completed and completion certificate to this extent is issued by the concerned organization but final bill is pending, such work shall be considered for fulfillment of credentials. 4. In case of completed work, the value of final bill (gross amount) including the PVC amount (if paid) shall be considered as the completion cost of work. In case final bill is pending, only the total gross amount already paid including the PVC amount (if paid) shall be considered as the completion cost of work. In case of substantially completed work, the total gross amount already paid including the PVC amount (if paid), as mentioned in the certificate, shall be considered as the cost of substantially completed work. 5. If a bidder has successfully completed a work as subcontractor and the work experience certificate has been issued for such work to the subcontractor by a Govt. Organization or public listed company as defined in Note for Item 10.1 Para 10 of the Tender Form (Second Sheet) of GCC April - 2022, the same shall be considered for the purpose of fulfillment of credentials.
6. In case a work is considered similar in nature for fulfillment of technical credentials, the overall cost including the PVC amount (if paid) of that completed work or substantially completed work, shall be considered and no separate evaluation for each component of that work shall be made to decide eligibility. 7. In case of newly formed partnership firm, the credentials of individual partners from previous propriety firm(s) or dissolved previous partnership firm(s) or split previous partnership firm(s), shall be considered only to the extent of their share in previous entity on the date of dissolution /split and their share in newly formed partnership firm. For example, a partner A had 30% share in previous entity and his share in present partnership firm is 20%. In the present tender under consideration, the credentials of partner A will be considered to the extent of 0.3*0.2*value of the work done in the previous entity. For this purpose, the tenderer shall submit along with his 1.3.1 bid all the relevant documents which include copy of previous partnership deed(s), dissolution deed(s) and proof of surrender of PAN No.(s) in case of dissolution of partnership firm(s) etc. 8. In case of existing partnership firm, if any one or more partners quit the partnership firm, the credentials of remaining partnership firm shall be re-worked out i.e., the quitting partner(s) shall take away his credentials to the extent of his share on the date of quitting the partnership firm(e.g. in a partnership firm of partners A, B & C having share 30%, 30% & 40% respectively and credentials of Rs 10 crore; in case partner C quits the firm, the credentials of this partnership firm shall remain as Rs 6 crore). For this purpose, the tenderer shall submit along with his bid all the relevant documents which include copy of previous partnership deed(s), dissolution deed(s) and proof of surrender of PAN No.(s) in case of dissolution of partnership firm(s) etc
9. In case of existing partnership firm if any new partner(s) joins the firm without any modification in the name and PAN/TAN no. of the firm, the credentials of partnership firm shall get enhanced to the extent of credentials of newly added partner(s) on the same principles as mentioned in item 6 above. For this purpose, the tenderer shall submit along with his bid all the relevant documents which include copy of previous partnership deeds, dissolution/splitting deeds and proof of surrender of PAN No.(s) in case of dissolution of partnership firm etc. 10. Any partner in a partnership firm cannot use or claim his credentials in any other firm without leaving the partnership firm i.e., In a partnership firm of A&B partners, A or B partner cannot use credentials of partnership firm of A&B partners in any other partnership firm or propriety firm without leaving partnership firm of A&B partners. 11. In case a partner in a partnership firm is replaced due to succession as per succession law, the proportion of credentials of the previous partner will 1.3.2 be passed on to the successor. 12. If the percentage share among partners of a partnership firm is changed, but the partners remain the same, the credentials of the firm before such modification in the share will continue to be considered for the firm as it is without any change in their value. Further, in case a partner of partnership firm retires without taking away any credentials from the firm, the credentials of partnership firm shall remain the same as it is without any change in their value. 13. In a partnership firm "AB" of A&B partners, in case A also works as propriety firm "P" or partner in some other partnership firm "AX", credentials of A in propriety firm "P" or in other partnership firm "AX" earned after the date of becoming a partner of the firm AB shall not beadded in partnership firm AB. 14. In case a tenderer is LLP, the credentials of tenderer shall be worked out on above lines similar to a partnership firm. 15. In case company A is merged with company B, then company B would get the credentials of company A also.]
80 conditions · 5 needing a document upload
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
The tenderer has to opt for taking payment through letter of credit (LC)as per Railway Board's letter no. 2018/CE-I/CT/9 dated 4.6.18.
Tenderers are required to upload copy of Permanent Account Number, GST registration
Tenderes are required to upload ESI & EPF regsitration certificate
Tenderers are required to furnish a valid and functional email ID and mobile no. to which communication can be done by the Railway Administration
If the accepted tender value is more than 5% below the advertised tender value, the contractor shall submit an additional Performance Guarantee at the rate of 5% of the original contract value. (Authority : Advance Correction Slip No. 11 to IRS GCC April-2022)
Drawings for the Work: The Drawing for the work can be seen in the office of the DRM(Engg)/S.E. Railway/Adra Railway at any time during the office hours. The drawings are only for the guidance of Tenderer(s). Detailed working drawings (if required) based generally on the drawing mentioned above, will be given by the Engineer or his representative from time to time
1. Rights of the Railway to deal with Tender: The authority for the acceptance of the tender will rest with the Railway. It shall not be obligatory on the said authority to accept the lowest tender or any other tender, and tenderer(s) shall neither demand any explanation for the cause of rejection of his/ their tender nor the Railway to assign reasons for declining to consider or reject any particular tender or tenders. 2. If the tenderer(s) deliberately gives / give wrong information in his / their tender or creates / create circumstances for the acceptance of his / their tender, the Railway reserves the right to reject such tender at any stage. 3. If any partner(s) of a partnership firm expires after the submission of its tender or after the acceptance of its tender, the Railway shall deem such tender as cancelled/contract as terminated under clause 61 of the Standard General Conditions of Contract, unless the firm retains its character as per partnership agreement. If a sole proprietor expires after the submission of tender or after the acceptance of tender, the Railway shall deem such tender as cancelled / contract as terminated under clause 61 of the Standard General Conditions of Contract.
Should a tenderer find the discrepancies in, or omissions from the drawings or any of the tender forms or should be in doubt as to their meaning, he should at once notify the authority inviting tenders who may issue a corrigendum. It shall be understood that every endeavor has been made to avoid any error which can materially affect the basis of the tender and the successful tenders shall take upon himself and provide for the risk of any error which may subsequently be discovered and shall make no subsequent claim on account thereof.
Before submitting a tender, the tenderer will be deemed to have satisfied himself by actual inspection of the site and locality of the works, that all conditions liable to be encountered during the execution of the works are taken into account and that the rates he entered in the tender form are adequate and all inclusive to accord with the provisions in clause-37 of the General Conditions of Contract for the completion of work to the entire satisfaction of the engineer.
All these conditions and specifications should carefully be studied by the tenderer / tenderers before submitting his/their tender. He/they should in his/their own interest be well acquainted with the site of work.
Bid Security: The tenderer shall be required to submit the Bid Security with the tender for the due performance with the stipulation to keep the offer open till such date as specified in the tender, under the conditions of tender. The Bid Security shall be as under: Value of the Work - For all work - Bid Security -2% of the estimated cost of the work. Note: (i) The Bid Security shall be rounded off to the nearest 100. This Bid Security shall be applicable for all modes of tendering. (ii) Any firm recognized by Department of Industrial Policy and Promotion (DIPP) as 'Startups' shall be exempted from payment of Bid Security detailed above. (iii) Labour Cooperative Societies shall submit only 50% of above Bid Security detailed above. (b) It shall be understood that the tender documents have been issued to the tenderer and the tenderer is permitted to tender in consideration of stipulation on his part, that after submitting his tender he will not resile from his offer or modify the terms and conditions thereof in a manner not acceptable to the Engineer. Should the tenderer fail to observe or comply with the said stipulation, the aforesaid amount shall be liable to be forfeited to the Railway. (c) If his tender is accepted, this Bid Security mentioned in sub para (a) above will be retained as part security for the due and faithful fulfillment of the contract in terms of Clause 16 of the Standard General Conditions of Contract. The Bid Security of other Tenderers shall, save as herein before provided, be returned to them, but the Railway shall not be responsible for any loss or depreciation that may happenthereto while in their possession, nor be liable to pay interest thereon.
The Bid Security shall be deposited either in cash through e- payment gateway or submitted as Bank Guarantee bond from a scheduled commercial bank of India or as mentioned in tender documents. The Bank Guarantee bond shall be as per Annexure VIA and shall be valid for a period of 90days beyond the bid validity period.
Beneficiary- FA and CAO, South Eastern Railway,Garden Reach, 7.1.2 Kolkata.
Zonal works i.e. execution of (a) new work additions, alterations to the existing structures, special repair works and supply of building materials subject to costing of each such work not exceeding rupees 5 lakh and (b) all works ordinary repair and maintenance works for maintenance of Service buildings, Staff quarters and colony for section from Adra(ex) to Bankura(ex) and from Bankura(ex) to Masagram(ex) under the jurisdiction of SSE(Works)/Sonamuki for two years.
E-DRM-Engg-ADRA-82-26~SER
E-DRM-Engg-ADRA-82-26
Open
Works - General
24 Months
Purulia, West Bengal
₹0
₹5 L
14 Aug 2026
14 Aug 2026
25 Aug 2026
100 items across 2 schedules · ₹69,60,000 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| 1 | Supplying Tube well Head with cover India Mark- II conforming to IS-9301 having minimum weight 12 kg. | Each | 5.00 | 854.99 | 4,274.95 |
| 2 | Supplying of MS Axle confirming to IS specification and as per instruction of Engineer in charge | Each | 25.00 | 37.34 | 933.5 |
| 3 | Supplying of MS Bearing confirming to IS specification and as per instruction of Engineer in charge. | Each | 40.00 | 118.58 | 4,743.2 |
| 4 | Supplying common salt for electro chlorination plant. | Kg | 1900.00 | 5.79 | 11,001 |
| 5 | Jungle cleaning and removing the same to a distance of 50m or part thereof complete as directed by Engineer-in-charge or his authorized represetative at site (Not: Contractor has to submit photograph of the location before and after execution of work for this item to Rly. Representative and the photograph should be attached alongwith bills. | Sqm | 33692.28 | 0.61 | 20,552.29 |
| 6 | Withdrawal and resinking of hand tubewells for any depth of pipe of any diameter 32 mm to 40mm dia including repairing with all small fittings/fastenings such as M.S. nut, bolts washers, chain , leather bucket, rod, rod socket, lower / upper and bearing but such as body tank, handle , G.I. suction pipes etc with all labour tools and plants etc. complete for mark -II Models as per direction of in charge . | Each | 40.00 | 2,904.79 | 1,16,191.6 |
| 7 | Supply and fixing retro reflective sign board of Engg grade as per IRC/MOST specification made on GRC sheet (14 gauge) with enamel painted (full reflective board) with all contractor materials, tool, plantsj, fittings on Railway's frame. | Sqm | 204.00 | 3,810.74 | 7,77,390.96 |
| 8 | Providing and fixing water meter with strainer & accessories f o r 3 0 0 m m d i a dirt b o x type (Pot Strainer). The rate includes all lead, lift, taxes and all other charges complete | Each | 1.00 | 48,336.18 | 48,336.18 |
| 9 | "Providing and fixing water meter with strainer & accessories for 350 m m dia, Dirt Box type (Pot strainer) . The rate includes all lead, lift, taxes and all other charges complete" | Each | 1.00 | 69,495.84 | 69,495.84 |
| 10 | Supply o f 150 m m dia G.I. flange with a l l lead, lift, taxes etc complete. | Pair | 3.00 | 326.85 | 980.55 |
| 11 | Supply o f 100 m m dia G.I. flange with a l l lead, lift, taxes etc complete. | Pair | 4.00 | 209.27 | 837.08 |
| 12 | Supply of 80 mm dia G.I. flange with all lead, lift, taxes etc complete. | Pair | 6.00 | 148.49 | 890.94 |
| 13 | Supplying & fixing 4 to 5 mm thick leather for pipe line joints, foot valve etc. | Kg | 40.00 | 132.54 | 5,301.6 |
| 14 | Supplying rubber sheet 4 to 5 mm thk | Kg | 30.00 | 25.91 | 777.3 |
| 15 | Supplying spun yarn | Kg | 78.00 | 34.87 | 2,719.86 |
| 16 | Supply of alum | MT | 2.00 | 14,317.7 | 28,635.4 |
| 17 | Supplying 40 mm dia PVC waste pipe for sink. The rate includes all lead, lift, taxes etc. complete. | Each | 40.00 | 41.85 | 1,674 |
| 18 | Supplying PVC basin waste nipple 40 mm dia. The rate includes all lead, lift, taxes etc. complete | Each | 40.00 | 42.85 | 1,714 |
| 19 | Supplying PVC sink waste nipple 50mm dia. The rate includes all lead, lift, taxes etc. complete. | Each | 40.00 | 49.82 | 1,992.8 |
| 20 | Supplying G.I.plug of approved quality for 25 mm dia G.I. pipe fittings. The rate includes all lead, lift, taxes and all other charges complete. | Each | 25.00 | 51.81 | 1,295.25 |
| 21 | "Supplying G.I. plug of approved quality for 20 mm dia G.I. pipe. The rate includes all lead, lift, taxes and all other charges complete." | Each | 30.00 | 51.81 | 1,554.3 |
| 22 | Supplying G.I. Plug of approved quality for 15 mm dia G.I. pipe. The rate includes all lead, lift, taxes and all Other charges complete. | Each | 30.00 | 33.89 | 1,016.7 |
| 23 | Supplying lead wool | Kg | 80.00 | 138.51 | 11,080.8 |
| 24 | Beautification o f building b y weather proof wall painting depicting Bengal folk art & Jharkhand folk art over walls at stations. Before painting the wall should be thoroughly cleane d and painted with suitable weather proof agent. The rate includes all taxes and the w ork i s t o be executed as per direction of engineer-in-charge. | Square Foot | 792.00 | 82.71 | 65,506.32 |
| 25 | Provision of suitable , appropriate approved type of mural of mridule tiles/glazed tiles/ceramic or equivalent as per instruction of Engineer in Charge . The rates includes supplying ,loading , unloading and carrying all materials cost of approval all material and highly skilled mason including plastering and polishing , supply of white cement , sand , Grey cement , oxide and colour papers, gum including scaffolding complete (Payable area of the mural shall include 3'' to 6''(max) border all round the mural in coloured plaster /Mridule tiles. The rate includes all taxes including GST. | Sqm | 10.00 | 9,461.51 | 94,615.1 |
| 26 | (i) Single Lever Basin Mixer | Each | 4.00 | 4,464.32 | 17,857.28 |
| 27 | (ii) Pillar Cock | Each | 4.00 | 1,280.51 | 5,122.04 |
| 28 | (iii) Overhead Shower with Arm & Flange (300 mm) | Each | 4.00 | 1,554.54 | 6,218.16 |
| 29 | (iv) Hand Shower with 1.5 mtr. Flexible Tube & hook | Each | 4.00 | 1,215.73 | 4,862.92 |
| 30 | (v) Pillar Cock Swan Neck (Sink Cock T/M) | Each | 4.00 | 1,753.84 | 7,015.36 |
| 31 | (vi) Bib Tap Sink Cock Regular Spout (W/M) | Each | 4.00 | 1,743.88 | 6,975.52 |
| 32 | (vii) Wall Mixer 3-in-1 (with Provision for OHS & hand shower Both) | Each | 4.00 | 4,927.69 | 19,710.76 |
| 33 | ( v i i i ) W a l l m i x e r Te l e p h o n i c w i t h Crutch (Provision for hand shower) | Each | 4.00 | 4,504.18 | 18,016.72 |
| 34 | (ix) Foldable Towel Rack | Each | 4.00 | 1,484.78 | 5,939.12 |
| 35 | Supply of National Flag of size 20ft x 30ft in 100% knitted polyester with reinforced super strong nylon webbing on all 3 sides & rope/ toggle sleeve. The rate includes all labours, tools & plants including all lead, lift, loading, unloading all taxes etc complete in all respect as per direction of engineer in charge. | Each | 6.00 | 17,798.36 | 1,06,790.16 |
| 36 | Supply & fixing PVC wallpaperwith Oil based primer. Rate isincluding GST | Square Foot | 600.00 | 127.68 | 76,608 |
| 37 | Providing and fixing wallpanelling made out of 50mmx 25mm thick hardwoodframing covered with 6mmthick BWR ply(Green/Century) on one sidefinshing with 3.5mm thichgroup matched veneer ofapproved make and shade,melamine polish finished allcomplete. Basic framework tobe treated with anti-termitesolution and to be providedwith 75mm x 12mm thick salwood skirting all complete.Finish 19mm Block Board,Melamine polish on cherryRed/Dark Mahogany veneer | Each | 120.00 | 1,281.34 | 1,53,760.8 |
| 38 | Providing and fixing permanently colour coated trapezoidal profiled sheet of depth 28-30mm at 195-205mm pitch distance with precisely engineered 'Rib & Flute" design. Profiled sheets shall be min. 0.5mm TCT/0.45mm BMT high tensile zinc aluminium alloy coated zincalume / galvalume steel sheet (550 mpa yield strength) having a coating of mass of 150 gsm zinc- aluminium coating AZ-150 total on both sides as per, AS 1397:1993 finished with 20 microns approved colour coating of Silicon Modified Polyester (SMP) / Super Polyester paint coat on exposed surface over a primer coat of 5 microns and a back coat of 5 microns on reverse side over a 5 microns primer coat.There shall be 2 small ribs/square flutes between profiles for providing additional strength. The sheet to be fixed over the purlins with hexagonal head self drilling suitable fasteners with neoprene / EPDM washer on crests of the sheet | Sqm | 1005.00 | 875.14 | 8,79,515.7 |
| 39 | " Providing & fixing of coloured galvalume plain sheet flashings at ridges / apex junctions of roofing cladding, cover / corner / barge pieces etc. in required shape, colour duly fixed with stitching screws (with EPDM washers etc. as per site requirement) Upto 600 mm width (girth) " | Running Metre | 147.00 | 566.37 | 83,256.39 |
| 40 | Supply of coolie | Day | 120.00 | 567.99 | 68,158.8 |
| 41 | Supply of carpenter | Day | 120.00 | 659.57 | 79,148.4 |
| 42 | Supply of coarse sand zone-3 | cum | 40.00 | 1,320.9 | 52,836 |
| 43 | Supply of stone aggregate 10mm normal size | cum | 10.00 | 1,188.81 | 11,888.1 |
| 44 | Supply of stone aggregate 20mm normal size | cum | 10.00 | 1,232.84 | 12,328.4 |
| 45 | Supply of FPS clay fire ash bricks class designation 7.5 | Numbers | 2000.00 | 3.96 | 7,920 |
| 46 | Supply of portland cement (OPC) 43 grade | Tonne | 15.00 | 4,403 | 66,045 |
| 47 | Supply of PTMT Push Cock | Each | 135.00 | 61 | 8,235 |
| 48 | Supply of Galvanised wire mesh of average width of aperture 1.4 mm and nominal dia of wire 0.63 mm | Sqm | 1000.00 | 260 | 2,60,000 |
| 49 | Supply of Chequered precast cement concrete tiles 22 mm thick using marble chips of size 6 mm - Light shade using white cement | Sqm | 300.00 | 392 | 1,17,600 |
| 50 | Providing and fixing PVC falseceiling tiles of required size in truehorizontal levels suspended oninterlocking M.S. Tube grid ofsection 25mmX25mmX1.2mm. PVC ceiling tiles should have asection size of 6mmX250mm withwall thickness of 0.8mm.Perimeter edge of tiles shall becovered by extruded PVC cornerbeeding of size 9mmX8mmX1mm.M.S. tube section grid should beproperly secured with walls andanchored to roof with the help ofsuitable clamps with completework | Sqm | 105.00 | 1,244.57 | 1,30,679.85 |
| Schedule total | ₹34,80,000 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
CorrectionSlip08.pdf
ATTACHMENT
ANNEXUREVIAforBIDSECURITY.pdf
ATTACHMENT
ASC-2GCC-2022.pdf
ATTACHMENT
GCCACS.pdf
ATTACHMENT
CorrectionslipNo.11.pdf
ATTACHMENT
ACS-03OFGCC2022.pdf
ATTACHMENT
AnnexureVIBwithUDIN.pdf
ATTACHMENT
CorrectionslipNo4.pdf
ATTACHMENT
CorrectionslipNo9.pdf
ATTACHMENT
CTIndianRailwaysStandardGeneralConditionsofContractApril- correction slip
ATTACHMENT
JPOcabledamage.pdf
ATTACHMENT
Letterofcreditboardletter.pdf
ATTACHMENT
sharamikkalyanportal.pdf
ATTACHMENT
correctionslip.pdf
ATTACHMENT
GCC 2022
ATTACHMENT
Acceptanceofe-BankGuarantee_1.pdf
ATTACHMENT
ZonalSpecialcondition.1.pdf
ATTACHMENT
CTIndianRailwaysStandardGeneralConditionsofContractApril- Correction slip
ATTACHMENT
CorrectionSlipNo_7ACS-71.pdf
ATTACHMENT
GCC_April-2022_2022_CE-I_CT_GCC-2022_POLICY_27.04.22.pdf
ATTACHMENT
2023_10_20RBCE_CE-I-CTIndianRailwaysStandardGeneralConditionsofContractApril-2022AdvanceCorrectionSlipNo_5ACS-53.pdf
ATTACHMENT
2025_03_04RBCE_CE-I-CTIndianRailwaysStandardGeneralConditionsofContractApril-2022AdvanceCorrectionSlipNo_10ACS-10.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].