Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | l1₹14.3 LAccepted-AOC | ₹14.3 L | l1 | Accepted-AOC Accepted. Winner in lottery |
| 2 | l1₹14.3 LRejected-AOC | ₹14.3 L | l1 | Rejected-AOC Accepted |
| 3 | l1₹14.3 LRejected-AOC JHARSUGUDA ODISHA | JHARSUGUDA | ODISHA | 768201 | ₹14.3 L | l1 | Rejected-AOC Accepted |
| 4 | l1₹14.3 LRejected-AOC | ₹14.3 L | l1 | Rejected-AOC Accepted |
| 5 | l1₹14.3 LRejected-AOC AT BT ROAD PO DENGIBHADI PS SUNDARGARH TOWN DIST SUNDARGARH ODISHA PIN 770001 | SUNDARGARH | ODISHA | 770001 | ₹14.3 L | l1 | Rejected-AOC Accepted |
Tender Value
₹14.3 L
EMD Value
₹14,270
Closing Date
6 Apr 2026, 5:00 pmClosed
SE R and B Division, Sundargarh
O/o the SE R and B Division, Sundargar
Supply , Installation , Testing and Commissioning of UPS system at DHH Sundargarh for the year 2025.26
2026_EICCL_127497_18
Bid Identification No-SE-R AND B-SNG-35 OF 2025-26
Open Tender
Electrical Works
Percentage
90 days
Sundargarh
Please refer Tender documents.
3 documents required · 3 mandatory
₹6,000
₹14,270
Yes
18 Aug 2026
25 Mar 2026
7 Apr 2026
25 Mar 2026
6 Apr 2026
25 Mar 2026
25 Mar 2026 - 2 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Supply , Installation , Testing and Commissioning of UPS system at DHH Sundargarh for the year 2025.26 | |||||
| 1.1 | Supply ,installation ,testing & commissioning of 20KVA Parallel UPS SYSTEM WITH IGBT based inverter system, true online double conversion system, inbuilt isolation transformer & automatic phase sicuency corrector of 3ph in put to 3 ph output,415V, with built in BMS with battery back up up to 30 minutes with MS Rack for battery Housing, DC cable 7 Mtr with SFU and links for installation (Battery required: 12V, 65AH, 32 No.s) protection for fault by OL,UV,EF,GF,OC,Ph. (Make:Numeric / APC/ VERTIV) LOAD OF OT,ICU) as per direction of Engg.-in-Charge. Warrentee period of all accessories & component & system must be 2 years & compelete test certificate must be submitted along with ups including component list & SLD. | - | Each | - | - |
| 2Supply ,installation ,testing & commissioning of 30KVA Parallel UPS SYSTEM WITH IGBT based inverter system, true online double conversion system, inbuilt isolation transformer & automatic phase sicuency corrector of 3ph in put to 3 ph output,415V, with built in BMS with battery back up up to 30 minutes with MS Rack for battery Housing, DC cable 7 Mtr with SFU and links for installation (Battery required: 12V, 65AH, 40 Nos) protection for fault by OL,UV,EF,GF,OC,Ph. (Make:Numeric / APC/ VERTIV) LOAD OF OT,ICU) as per direction of Engg.-in-Charge. Warrentee period of all accessories & component & system must be 2 years & compelete test certificate must be submitted along with ups including component list & SLD. | |||||
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_585918.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.26 MB
BOQ_585918.xls
BOQ • 0.25 MB
DTCN18.pdf
Tender Documents • 7.75 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .