| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 CrAccepted-AOC | ₹1.4 Cr | L1 | Accepted-AOC Agreement Executed and work awarded |
| 2 | L2₹1.4 Cr+₹2.1 L (1.53%)Rejected-AOC KADUMKEERIYIL SHOPPING COMPLEX THAMARASSERY KOZHIKODE 673573 | KOZHIKODE | KOZHIKODE | KERALA | 673573 | ₹1.4 Cr+₹2.1 L (1.53%) | L2 | Rejected-AOC Agreement Executed and work awarded |
| 3 | L3₹1.6 Cr+₹19.3 L (14.0%)Rejected-Finance | ₹1.6 Cr+₹19.3 L (14.0%) | L3 | Rejected-Finance Lowest bid accepted |
| 4 | L4₹2.3 Cr+₹95.5 L (69.6%)Rejected-Finance | ₹2.3 Cr+₹95.5 L (69.6%) | L4 | Rejected-Finance Lowest bid accepted |
| Sl No | Description | Qty | Unit | Bethlahem Constructions L2 | T ABDUL RASHEED L1 | K K CONSTRUCTIONS L3 | JAGADEESH KUMAR V L4 |
|---|---|---|---|---|---|---|---|
| 1.00Construction of Building | |||||||
| 1.00 | OD151221/2025-2026:Chemical blasting without using explosive and removing the hard rock(measured in solid) for the site leveling in approved lines and levels by drilling holes of suitable diameter 20 cm c/c and filling it with suitable chemicals like accones etc. and stacking the serviceble materials at places pointed out by Departmental officers with lead in to 1000m | 544.96 | cum | 3,900 ₹21,25,336.2 | 3,278.84 ₹17,86,830.09 Lowest | 4,878.93 ₹26,58,811.93 | 6,200 ₹33,78,739.6 |
| 1.00 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 826.97 | sqm | 13 ₹10,750.61 Lowest | 13.7 ₹11,329.49 | 15.62 ₹12,917.27 | 1,970 ₹16,29,130.9 |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 221.56 | cum | 210 ₹46,528.44 | 194 ₹42,983.42 Lowest | 221.25 ₹49,021.04 | 336 ₹74,445.5 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 24.89 | cum | 6,600 ₹1,64,300.4 | 5,500 ₹1,36,917 Lowest | 6,812.89 ₹1,69,600.08 | 8,400 ₹2,09,109.6 |
| 1.00 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 24.84 | cum | 8,200 ₹2,03,679.8 | 8,400 ₹2,08,647.6 | 7,931.99 ₹1,97,022.7 Lowest | 9,500 ₹2,35,970.5 |
| 1.01 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 269.11 | sqm | 310 ₹83,424.1 | 291 ₹78,311.01 Lowest | 331.64 ₹89,247.64 | 450 ₹1,21,099.5 |
| 1.01 | 5.9.2:Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | 352.78 | sqm | 680 ₹2,39,893.12 | 633 ₹2,23,312.27 | 721.07 ₹2,54,381.96 | 370 ₹1,30,530.08 Lowest |
| 1.01 | OD153272/2025-2026:Providing and laying in position machine batched and machine mixed design mix M-30 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Cement content considered in this item is @ 340 kg/ cum. Excess cement used as per design mix will not be payable and less cement used as per design mix will be recoverable. All work upto plinth level | 171.79 | cum | 8,800 ₹15,11,752 Lowest | 10,600 ₹18,20,974 | 9,519.13 ₹16,35,291.34 | 12,000 ₹20,61,480 |
| 1.01 | OD153273/2025-2026:Providing and laying in position machine batched and machine mixed design mix M-30 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Cement content considered in this item is @ 340 kg/ cum. Excess cement used as per design mix is not payable and less cement used will be recoverable. All work above plinth level upto floor V level | 217.5 | cum | 9,600 ₹20,87,990.4 Lowest | 10,900 ₹23,70,739.1 | 11,266.38 ₹24,50,426.38 | 16,035 ₹34,87,596.47 |
Tender Value
₹1.7 Cr
EMD Value
₹50,000
Closing Date
23 Sept 2025, 3:00 pmClosed
Superintending Engineer
Buildings North Circle PWD Complex Mananchira Kozhikode
Construction
2025_PWD_796934_1
PWD/BLDG/8410/2025-2026
Open Tender
Civil Works - Buildings
Item Rate
450 days
Thalayad Balussery
Please refer Tender documents.
10 documents required · 10 mandatory
₹5,515
Yes
₹50,000
Yes
31 Oct 2025
12 Sept 2025
25 Sept 2025
12 Sept 2025
23 Sept 2025
12 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1319321.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .