| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.0 CrAccepted-Finance DAM ROAD TALWARA TOWNSHIP DISTT HOSHIARPUR PB | ₹23.0 Cr | L1 | Accepted-Finance Lowest Amount |
| 2 | L2₹23.9 CrRejected-Finance | ₹23.9 Cr | L2 | Rejected-Finance Highest Amount |
| 3 | L3₹24.0 CrRejected-Finance | ₹24.0 Cr | L3 | Rejected-Finance Highest Amount |
Tender Value
₹19.2 Cr
EMD Value
₹19.2 L
Closing Date
30 Jan 2023, 11:00 amClosed
EE JSV Nagrota Bagwan
JSV Division Nagrota Bagwan
Source Strengthening of WSS Amtrar Jhikli Kothi Balol Chandrot Thana Badgran Kawari SHC/O RCC Check Dams
2023_HPIPH_67225_1
NGB-KNG01-773
Open Tender
Civil Works
730 days
Nagrota Bagwan
Please refer Tender documents.
12 documents required · 12 mandatory
₹2,500
EE JSV Nagrota Bagwan
₹19.2 L
4 Mar 2023
17 Jan 2023
30 Jan 2023
17 Jan 2023
30 Jan 2023
17 Jan 2023
Amount
Design and Construction of RCC Check Dam of 28.00 mtr long on Joggal Khad involving Planning ,evolution of hydraulic and structural design and construction of sub structure and super structure of gravity type dam with suitable provision for spillway, energy dissipaters, chute blocks, basin blocks, dentated sills alog with wing walls, sluice gates with steel flushing pipes of 500mm dia having proper upstream and down stream aprons, cut off walls, wire crate work at the down stream of dam and any other necessary appurtenances contingent complete in all respects. (For detailed specification refer as per chapter No. 1 & data sheet No. 1.)
Design and Construction of RCC Diversion head weir of 37.00 mtr long on Baner Khad along with sump well based on geotech investigation involving Planning ,evolution of hydraulic and structural design and construction of sub structure and super structure of gravity type dam with suitable provision for spillway, energy dissipaters, chute blocks, basin blocks, dentated sills alog with wing walls, sluice gates with steel flushing pipes of 500mm dia having proper upstream and down stream aprons, cut off walls, wire crate work at the down stream of weir and any other necessary appurtenances contingent complete in all respects. (For detailed specification refer as per chapter No. 1 & data sheet No. 2.)
Construction of RCC Percolation Wells of 6.00 mtrs. dia and 10.00 mtrs deep including excavation in all kinds of soil strata, dewatering, erection and lowering of well curb in the pit in M30 grade, no fine concrete, CC Work in M30, with platform 1.2 mtrs wide in steel with railing, plinth protection all around 1.5 mtrs wide. All works shall be conforming to relevant IS Codes and to the entire satisfaction of Engineer in charge. (For detailed specification refer as per chapter No. 1 & data sheet No. 3.)
Design and Construction of Pump House cum Chowkidar quarter having 63.00 Sqmt Plinth area and 3.30 Mtrs. height complete in all respect. The pump house shall be aesthetically designed (to be approved by the competent authority). The work shall include all internal and external electrical wiring, water supply and sanitary fitting, painting and distempering, precast terrazo tile flooring, wooden frames and panelled & glazed shutter for doors & window and other allied items. The doors & window shall be in double shutters and M.S grills for window and internal wiring shall be in PVC conduit. All work shall be conforming to relevent IS code and to the entire satisfaction of Engineer-in- Charge. (For detailed specification refer as per chapter No. 1 & data sheet No. 7.)
C/o Pump house (For Phase-1st, 2nd & 3rd)
Design, construction, testing and commissioning of 0.31 MLD Water purification Treatment Plant in shape of slow sand filter including cost of site development to adjust hydraulic levels as per contour plan and structural requirement cost of construction of civil works, laying of all interconnecting G.I./ MSERW pipe and scouring arrangement from all units with disposal of the same to appropriate place i.e. near by Nallah/ Khad/ Natrual drainage, valve,fitting and all other contingent works capable of taking input and giving output as laid down in chapter-I of CPHEEO manual under all climatic conditions specified therein. The treatment plant includes construction of RCC Mix M-30 of Raw Water Tank, Clear Water Tank, Slow sand filter, Inter connecting path, (1.20 metre wide). The design of various units shall confirm to the relevant BIS codes. All the hydraulic structure shall be designed and constructed in RCC M-30 design shall be carried out as per design shall be carried out as per design parametre included in the No. 1.1. (For detailed specification refer as per chapter No. 1 & data sheet No. 4.)
Design, construction, testing and commissioning of 0.62 MLD Water purification Treatment Plant in shape of rapid sand filters including cost of site development to adjust hydraulic levels as per contour plan and structural requirement cost of construction of civil works, hoisting and errection of all steel works, installation of mechanical, electrical accessories equipment/ machinery, laying of all interconnecting G.I./ MSERW pipe and scouring arrangement from all units with disposal of the same to appropriate place i.e. near by Nallah/ Khad/ Natrual drainage, valve,fitting and all other contingent works capable of taking input and giving output as laid down in chapter-I of CPHEEO manual under all climatic conditions specified therein. The treatment plant includes construction of RCC Mix M-30 of inlet chamber, Raw Water Tank, Clear Water Tank, Pre-sedimentation tank, Tapered floculator, flash Mixer, Parshall Flume, Secondary Settling Tank, Rapid gravity sand filter, Wash lime solution tank, Alum solution tank, Inter connecting path, (1.20 metre wide), backwash unit with pumping set and Air compressor including arrangement for disposal of waste from water treatment process, plant building compring office, P/F lightening arrangement(sodium vapour lamps 150 watt) made in the boundary unit in the plant area, C/o boundary wall, P/F electoral mechanical equipment, Lab equipment, proper walk way for inspection/operation of various units. The design of various units shall confirm to the relevant BIS codes. All the hydraulic structure shall be designed and constructed in RCC M-30 design shall be carried out as per design shall be carried out as per design parametre included in the No. 1.1. (For detailed specification refer as per chapter No. 1 & data sheet No. 5.)
Design, construction, testing and commissioning of 1.06 MLD Water purification Treatment Plant in shape of rapid sand filters including cost of site development to adjust hydraulic levels as per contour plan and structural requirement cost of construction of civil works, hoisting and errection of all steel works, installation of mechanical, electrical accessories equipment/ machinery, laying of all interconnecting G.I./ MSERW pipe and scouring arrangement from all units with disposal of the same to appropriate place i.e. near by Nallah/ Khad/ Natrual drainage, valve,fitting and all other contingent works capable of taking input and giving output as laid down in chapter-I of CPHEEO manual under all climatic conditions specified therein. The treatment plant includes construction of RCC Mix M-30 of inlet chamber, Raw Water Tank, Clear Water Tank, Pre-sedimentation tank, Tapered floculator, flash Mixer, Parshall Flume, Secondary Settling Tank, Rapid gravity sand filter, Wash lime solution tank, Alum solution tank, Inter connecting path, (1.20 metre wide), backwash unit with pumping set and Air compressor including arrangement for disposal of waste from water treatment process, plant building compring office, P/F lightening arrangement(sodium vapour lamps 150 watt) made in the boundary unit in the plant area, C/o boundary wall, P/F electoral mechanical equipment, Lab equipment, proper walk way for inspection/operation of various units. The design of various units shall confirm to the relevant BIS codes. All the hydraulic structure shall be designed and constructed in RCC M-30 design shall be carried out as per design shall be carried out as per design parametre included in the No. 1.1. (For detailed specification refer as per chapter No. 1 & data sheet No. 5.)
All structure shall be designed for up lift pressure and encounted at footing as per contour plan up loaded suitable protection structure shall be designed and provide to avoid direct entry of HFL water with treatment premises. The scope of work shall be as per common design parameters technical specification and special condition appended in the DNIT. This further includes combination of various treatment units based on flow diagram given in the above manual for consideration of alternative proposals or any other low cost treatment methods based on existing plants working under similar conditions with necessary performance certifications. The firm should quote its rates for its offered proposal with cogent reason/justification for adopting the particular method of treatment of water and design of relevant units which should be based in recommendations of latest relevant codes/manuals on water supply and treatment published by CPHEEO, Ministry of Urban Development, Govt of india, New Delhi.
Designing, Constructing, Testing & Commissioning R.C.C. Circular Partially underground/Elevated storage tanks as per capacity given below at various stages/sites including excavation in all kinds and types of strata, soil strata including dewatering in M30 design mix in foundation, walls, bottom slab, roof slab/dome with smooth finishing in 1:3 inside the tank, all alied Civil Works, Site development, cutting/excavation in all kinds of soils, C/o PCC/RCC Retaining walls, Breast walls, refilling and disposing of surplus stuff with in all leads and lifts, labour and material charges. The job also includes providing lowering, laying, erecting, hoisting and jointing of pipe assembly for inlet, outlet, overflow and scour pipe ,proper manifiold at outlet including all fittings, bye pass arrangement consisting of GI / MS pipes special and valves of required classes and dia and all other accessories required such as MS ladders inside and outside ventilator with mosquito proof wire mesh,lightening arrester complete ,SFRC manhole covers including frames and covers (medium duty) with proper locking arrangement water level indicator, RCC frames for all valves ventilating shafts shall also be provided including all leads and lifts as per entire satisfaction of Engineer-in-Charge. The tanks shall be hydraulically tested for water tightness all works shall be conforming to relevant IS code. The cost of valves & other accessories shall be included in the rates of tanks . Battery Limit shall be considered as 3.00 m from the edge of the structure or the boundary of the land whichever is less.The rates quoted by the contractor shall be for the complete work. All ancilliary works and accessories required to make the system fully functional shall be included in the cost of work. Nothing extra shall be paid on this account.The work shall include supplying of Five sets of structural design after testing the bearing capcity of soil and drawings, etc complete as directed by engineer in charge as per relevent data sheet and scope of work. (For detailed specification refer as per chapter No. 1 & data sheet No. 6.)
C/O Main Underground Tank 3,10,000 Ltrs Capcity at Village Sakot.
C/O Main Underground Tank 5,30,000 Ltrs Capcity at Village Niyanda.
C/O OHSR 1,30,000 Ltrs Capcity @ 15 mtr staging at Village Hatwas.
C/O OHSR 70,000 Ltrs Capcity @ 15 mtr staging at Village Ghorab.
Phase-1st Supply of submersible pumping set of (KSB / Kalama/ Kirloskar/ Johnston/ Cromption/ BS) make conforming to BIS; 8034-1976 latest suitable for lifting raw water (latest with uptodate ammendments) fitted with bronze impellers/ suitable alloy directly coupled to squirrell case electric induction motor of same make as (manufacurer standard) conforming to BIS; 9283-1979 (latest with upto date ammendments) and totally water proof for submersible duty, isolated from the pump by intermediate casing with double mechanical seal in oil chamber, grease packed lubricated bearings & provided with stainless steel thrust bearing plate to with stand vertical loads with minimum wear & tear. It should also be fitted with a device to take up expansion of water with the heating of motor including water level guard,errection clamps,cable clips & depth gauge etc. The pump shall be suitable for operation on data given below:- (For detailed specification refer as per chapter No. 3 & data sheet No. 9.)
Total Head = 26.01 Mtrs
Discharge required from each pump. = 10.26 LPS
No. of pump required = 2.00 Nos. One act as stand by
Location of the site of installation of machinery. = The site is located at a distance of 20 Kmts from Palampur.
The Altitude of installation. = The altitude of place is 955.00 mtrs above MSL
Type of current. = AC Three phase supply with
Rate Voltage = 400 ± 10%
Type of water and its source = Raw Water from Check Dam
Charactristics of water.
a) Ambient Temperature dig.c = 20° C
b) Turbidity NTU = 500 NTU
c) Hardness260Mg/Ltrs(as CaCO3) = 540Mg/Ltr
d) pH Value = 6.5 - 8.5
e) total solid Mg /Ltrs = -
f) Other =
Static head in Mrs = 10.00 mtrs.
Length of R/Main = 150 mtrs.
Dia of Rising main = 125mm G.I Pipe (H)
No of working hours per day = 16 Hours
Limit of pump operation. = (-) 15 % (+) 10% of total head
R.P.M. of pumping set. = 2900 RPM ( or to be specified by the tenderer)
Test run. = 16 Hours continueously for 7 days
Providing and fixing of Kirloskar/Leader/Kilburn and any other make approved by state level Technical Committee JSV double flanged Cast Iron Accuated Sluice valve PN-1.6 confirming to BIS 14846 having bypass arrangement (to be provided on delivery side) of size one step higher than the delivery size of pump latest upto date ammendment complete in all respect including all leads and Lifts as per the direction and to the entire satisfaction of Engineer-In-Charge. (1 No.)
Providing & Fixing of Kirloskar/ Kilburn/IVC/Fouress /Gled/BHEL/Leader make Cast Iron Accuated double flanged swing check type reflux valve PN-1.6 confirming to BIS 5312 having bypass arrangement equal to dia of rising main shall be suitable for withstanding nominal seat pressure complete in all respect including all leads and Lifts as per the direction and to the entire satisfaction of Engineer-In-Charge. (1 No.)
Providing & laying PVC insulated jointless, flat water proof copper cable of Siemens/ Finolex/ Grandlay/ Gloster make conforming to BIS:1554 (Part I) -1988 or latest with up to date ammendments of suitable size for the pump sets offered(one cable carrying all three phases) including all other electrical equipment /accessories such as thimbles ,flexible pipe, solder, nuts & bolts cable glands etc. laid in pipes or trenches under floor. The type,size & make will be subject to approval of HPSEB authorities.In case of non acceptance by HPSEB authorities it shall have to be replaced by the tenderer free of cost.
On supply side of 3½ core coper cable of required size ( From HPSEB Meter to Switch & Starter). (18 Rmt.)
On motor side 3 core flat joint less copper cable of size of required size ( From Switch & Starter to Motor) (170 Rmt.)
Providing and Laying column aseembly of G.I./MSREW pipe considering site requirements and having appropriate size in accordance with the delivery size of pumping set . The pipe shall conform to relevant BIS codes & capable of with standing the feild test pressure equal to 1.5 times the operating pressure including all type of fittings such as bends, tapers/ reducers, flanges, rubber gaskets 3mmthick, nuts & bolts and any other fitting required at site and work shall be to the entire satisfaction of Engineer-in-Charge. The pipe material shall conform to relevant BIS Code and capable of with standing FTP equal to 1.5 times the operating pressure the complete arrangement shall compromise of
Suction Pipe = ____ dia = to be specified by the Tenderer (10 Rmt.)
Delivery pipe = ____ dia = to be specified by the Tenderer (10 Rmt.)
Common Header = ____ dia = to be specified by the Tenderer (10 Rmt.)
Errection of all equipments of Pumping Machinery including cost of tees, bends, tapers & any other fittings required as per site conditions & as per directions of Engineer-in-Charge.
Supply , Installation, Testing and Commissioning of Energy Saving Variable Frequency Starter Panel for submersible pump made out of 16 Gauge sheet, powder coated dust and vermin proof, wall/base mounted and front opening door type with copper insulated wiring suitable to operate 2 Nos. pump (1 working ) of the rating required HP . Starter should be capable enough to handle the following faults like short circuit, over current, under current, over voltage, under voltage, dry run protection and phase loss with LED ON/OFF & TRIP indicators, Power Quality Monitoring & Controlling Relay at the Incomer Feeder, Should be fitted with Surge Suppressor Device suiatble to protect against class-1 & 2 surges. Make: Aarmation Electric Private Limited/MAS/ELLES/Adlec (1 No.)
Energy Saving Variable Frequency Starter of required HP Heavy Duty for smooth start and smooth stop of pumps and for the energy conservation in the system. It Should be capable to monitor & control the frequecy of pumps through out the operation and to maintain the power factor of the system within acceptable limits. It should be able to withstand ambient temperature upto 50 Degrees celcius without derating and have conformal coating class 3C2, so that it can work in any harsh environment like moisture etc. Make: Aarmation Electric Private Limited/Bechoff/Bosch/Rockwell (1 No.)
Multi function meter indicating different parameters like Current, Voltage, KWH, PF, THD etc with RS 485 communication Make L&T/Conserve/Siemens (1 No.)
Main incomer MCCB suitable capacity of L&T / Standard make on the coming feeder for pumping set confirming to BIS 2516-1985 ( Latest edition) with neutral linked under voltage release. (1 No.)
LED Three phase indicating lamps complete with logged switches for individual motors conforming to BIS 3452 ( Part I & II ) latest with upto date ammendments. (1 Set)
LED On / Off indicator and push button, Control and power wiring,Power capacitor,Cooling fan 230 VAC, Contorl terminal, Buss Bar, i.e.Bolt, insulator, etc. (1 Set)
Input Choke of required HP for Energy saving variable frequency Starter which should be installed at the input of Energy saving variable frequency starter, so that there should be proper protection in case of any voltage surge and distortions. (2 Nos.)
Control Transformer to safegaurd the control circuit of all the components from the voltage surges and spikes. (1 No.)
Power and Control wiring and Busbar (1 No.)
Installation, Commissioning and Software Development (1 No.)
Surge suppressor device with Isolating MCCB to eliminate the power surges due to lightening and system surges. (1 No.)
Power quality monitoring & controlling relay with Control Contactor to safeguard the Electronic & Electric elements (1 No.)
Independent Control Panel with Switch Fuse Unit and Fuses of Suitable Amperage to eliminate the KitKat fuses of HPSEB Make: Aarmation/Siemens/Schneider/L&T (1 Set)
Programmable logic controller with appropriate digital and analog inputs and outputs to give automatic command to star delta and also will get data from Multi function Meter for Current, Voltage, KWH, PF and THD. Make Mitsubishi/L&T/Delta
Electronic relay card 8 channel for PLC system (1 No.)
SMPS 4.5 Amps to energise PLC system (1 No.)
HMI 7" display with IOT to give on and off command manually and also to show pump running and breakdown status at pump station Make Wientek/Exor/Mitsubishi/Mecon. (1 No.)
Control MCB for Automation System (1 No.)
Level Sensor to indicate the water level of tank remotely (2 No.)
Shielded Data Cable for Communication of Level Sensor with PLC (1 No.)
Supply of Mobile App (Android/IOS) with User ID and Password to monitor and control the pumping operation from Mobile for 3 users. Make: Aarmation Electric/Bechoff Automation/ Rockwell Automation. (1 No.)
Cloud GateWay for Data Clouding to Server (1 No.)
SCADA software to be installed in Laptop/PC to remotely monitor and control the operation of pumps and also to analysis the pump start and stop history logging, fault status, fault history, Power Quality Parameters like PF, Current, Voltage, KWH, THD etc Make Aarmation Electric/Rockwell Automation/ Backoff Automation (1 No.)
Cloud Space for data storage at cloud/server (1 No.)
Installation, Commissioning and Software Development (1 No.)
Phase-2nd Supply of submersible pumping set of (KSB / Kalama/ Kirloskar/ Johnston/ Cromption/ BS) make conforming to BIS; 8034-1976 latest suitable for lifting raw water (latest with uptodate ammendments) fitted with bronze impellers/ suitable alloy directly coupled to squirrell case electric induction motor of same make as (manufacurer standard) conforming to BIS; 9283-1979 (latest with upto date ammendments) and totally water proof for submersible duty, isolated from the pump by intermediate casing with double mechanical seal in oil chamber, grease packed lubricated bearings & provided with stainless steel thrust bearing plate to with stand vertical loads with minimum wear & tear. It should also be fitted with a device to take up expansion of water with the heating of motor including water level guard,errection clamps,cable clips & depth gauge etc. The pump shall be suitable for operation on data given below:- (For detailed specification refer as per chapter No. 3 & data sheet No. 9.)
Total Head = 138.61 Mtrs
Discharge required from each pump. = 5.18 LPS
No. of pump required = 2.00 Nos. One act as stand by
Location of the site of installation of machinery. = The site is located at a distance of 20 Kmts from Palampur.
The Altitude of installation. = The altitude of place is 955.00 mtrs above MSL
Type of current. = AC Three phase supply with
Rate Voltage = 400 ± 10%
Type of water and its source = Clear Water from P/well
Charactristics of water.
a) Ambient Temperature dig.c = 20° C
b) Turbidity NTU = 500 NTU
c) Hardness260Mg/Ltrs(as CaCO3) = 540Mg/Ltr
d) pH Value = 6.5 - 8.5
e) total solid Mg /Ltrs = -
f) Other =
Static head in Mrs = 102.00 mtrs.
Length of R/Main = 1200 mtrs.
Dia of Rising main = 80mm G.I Pipe (M)
No of working hours per day = 16 Hours
Limit of pump operation. = (-) 15 % (+) 10% of total head
R.P.M. of pumping set. = 2900 RPM ( or to be specified by the tenderer)
Test run. = 16 Hours continueously for 7 days
Providing and fixing of Kirloskar/Leader/Kilburn and any other make approved by state level Technical Committee JSV double flanged Cast Iron Accuated Sluice valve PN-1.6 confirming to BIS 14846 having bypass arrangement (to be provided on delivery side) of size one step higher than the delivery size of pump latest upto date ammendment complete in all respect including all leads and Lifts as per the direction and to the entire satisfaction of Engineer-In-Charge. (1 No.)
Providing & Fixing of Kirloskar/ Kilburn/IVC/Fouress /Gled/BHEL/Leader make Cast Iron Accuated double flanged swing check type reflux valve PN-1.6 confirming to BIS 5312 having bypass arrangement equal to dia of rising main shall be suitable for withstanding nominal seat pressure complete in all respect including all leads and Lifts as per the direction and to the entire satisfaction of Engineer-In-Charge. (1 No.)
Providing & laying PVC insulated jointless, flat water proof copper cable of Siemens/ Finolex/ Grandlay/ Gloster make conforming to BIS:1554 (Part I) -1988 or latest with up to date ammendments of suitable size for the pump sets offered(one cable carrying all three phases) including all other electrical equipment /accessories such as thimbles ,flexible pipe, solder, nuts & bolts cable glands etc. laid in pipes or trenches under floor. The type,size & make will be subject to approval of HPSEB authorities.In case of non acceptance by HPSEB authorities it shall have to be replaced by the tenderer free of cost.
On supply side of 3½ core coper cable of required size ( From HPSEB Meter to Switch & Starter). (18 Rmt.)
On motor side 3 core flat joint less copper cable of size of required size ( From Switch & Starter to Motor) (170 Rmt.)
Providing and Laying column aseembly of G.I./MSREW pipe considering site requirements and having appropriate size in accordance with the delivery size of pumping set . The pipe shall conform to relevant BIS codes & capable of with standing the feild test pressure equal to 1.5 times the operating pressure including all type of fittings such as bends, tapers/ reducers, flanges, rubber gaskets 3mmthick, nuts & bolts and any other fitting required at site and work shall be to the entire satisfaction of Engineer-in-Charge. The pipe material shall conform to relevant BIS Code and capable of with standing FTP equal to 1.5 times the operating pressure the complete arrangement shall compromise of
Suction Pipe = ____ dia = to be specified by the Tenderer (10 Rmt.)
Delivery pipe = ____ dia = to be specified by the Tenderer (10 Rmt.)
Common Header = ____ dia = to be specified by the Tenderer (10 Rmt.)
Errection of all equipments of Pumping Machinery including cost of tees, bends, tapers & any other fittings required as per site conditions & as per directions of Engineer-in-Charge.
Supply , Installation, Testing and Commissioning of Energy Saving Variable Frequency Starter Panel for submersible pump made out of 16 Gauge sheet, powder coated dust and vermin proof, wall/base mounted and front opening door type with copper insulated wiring suitable to operate 2 Nos. pump (1 working ) of the rating required HP . Starter should be capable enough to handle the following faults like short circuit, over current, under current, over voltage, under voltage, dry run protection and phase loss with LED ON/OFF & TRIP indicators, Power Quality Monitoring & Controlling Relay at the Incomer Feeder, Should be fitted with Surge Suppressor Device suiatble to protect against class-1 & 2 surges. Make: Aarmation Electric Private Limited/MAS/ELLES/Adlec (1 No.)
Energy Saving Variable Frequency Starter of required HP Heavy Duty for smooth start and smooth stop of pumps and for the energy conservation in the system. It Should be capable to monitor & control the frequecy of pumps through out the operation and to maintain the power factor of the system within acceptable limits. It should be able to withstand ambient temperature upto 50 Degrees celcius without derating and have conformal coating class 3C2, so that it can work in any harsh environment like moisture etc. Make: Aarmation Electric Private Limited/Bechoff/Bosch/Rockwell (1 No.)
Multi function meter indicating different parameters like Current, Voltage, KWH, PF, THD etc with RS 485 communication Make L&T/Conserve/Siemens (1 No.)
Main incomer MCCB suitable capacity of L&T / Standard make on the coming feeder for pumping set confirming to BIS 2516-1985 ( Latest edition) with neutral linked under voltage release. (1 No.)
LED Three phase indicating lamps complete with logged switches for individual motors conforming to BIS 3452 ( Part I & II ) latest with upto date ammendments. (1 Set)
LED On / Off indicator and push button, Control and power wiring,Power capacitor,Cooling fan 230 VAC, Contorl terminal, Buss Bar, i.e.Bolt, insulator, etc. (1 Set)
Input Choke of required HP for Energy saving variable frequency Starter which should be installed at the input of Energy saving variable frequency starter, so that there should be proper protection in case of any voltage surge and distortions. (2 Nos.)
Control Transformer to safegaurd the control circuit of all the components from the voltage surges and spikes. (1 No.)
Power and Control wiring and Busbar (1 No.)
Installation, Commissioning and Software Development (1 No.)
Surge suppressor device with Isolating MCCB to eliminate the power surges due to lightening and system surges. (1 No.)
Power quality monitoring & controlling relay with Control Contactor to safeguard the Electronic & Electric elements (1 No.)
Independent Control Panel with Switch Fuse Unit and Fuses of Suitable Amperage to eliminate the KitKat fuses of HPSEB Make: Aarmation/Siemens/Schneider/L&T (1 Set)
Programmable logic controller with appropriate digital and analog inputs and outputs to give automatic command to star delta and also will get data from Multi function Meter for Current, Voltage, KWH, PF and THD. Make Mitsubishi/L&T/Delta
Electronic relay card 8 channel for PLC system (1 No.)
SMPS 4.5 Amps to energise PLC system (1 No.)
HMI 7" display with IOT to give on and off command manually and also to show pump running and breakdown status at pump station Make Wientek/Exor/Mitsubishi/Mecon. (1 No.)
Control MCB for Automation System (1 No.)
Level Sensor to indicate the water level of tank remotely (2 No.)
Shielded Data Cable for Communication of Level Sensor with PLC (1 No.)
Supply of Mobile App (Android/IOS) with User ID and Password to monitor and control the pumping operation from Mobile for 3 users. Make: Aarmation Electric/Bechoff Automation/ Rockwell Automation. (1 No.)
Cloud GateWay for Data Clouding to Server (1 No.)
SCADA software to be installed in Laptop/PC to remotely monitor and control the operation of pumps and also to analysis the pump start and stop history logging, fault status, fault history, Power Quality Parameters like PF, Current, Voltage, KWH, THD etc Make Aarmation Electric/Rockwell Automation/ Backoff Automation (1 No.)
Cloud Space for data storage at cloud/server (1 No.)
Installation, Commissioning and Software Development (1 No.)
Phase-3rd Supply of submersible pumping set of (KSB / Kalama/ Kirloskar/ Johnston/ Cromption/ BS) make conforming to BIS; 8034-1976 latest suitable for lifting raw water (latest with uptodate ammendments) fitted with bronze impellers/ suitable alloy directly coupled to squirrell case electric induction motor of same make as (manufacurer standard) conforming to BIS; 9283-1979 (latest with upto date ammendments) and totally water proof for submersible duty, isolated from the pump by intermediate casing with double mechanical seal in oil chamber, grease packed lubricated bearings & provided with stainless steel thrust bearing plate to with stand vertical loads with minimum wear & tear. It should also be fitted with a device to take up expansion of water with the heating of motor including water level guard,errection clamps,cable clips & depth gauge etc. The pump shall be suitable for operation on data given below:- (For detailed specification refer as per chapter No. 3 & data sheet No. 9.)
Total Head = 8.29 Mtrs
Discharge required from each pump. = 22.08 LPS
No. of pump required = 2.00 Nos. One act as stand by
Location of the site of installation of machinery. = The site is located at a distance of 20 Kmts from Palampur.
The Altitude of installation. = The altitude of place is 955.00 mtrs above MSL
Type of current. = AC Three phase supply with
Rate Voltage = 400 ± 10%
Type of water and its source = Raw Water from Check Dam
Charactristics of water.
a) Ambient Temperature dig.c = 20° C
b) Turbidity NTU = 500 NTU
c) Hardness260Mg/Ltrs(as CaCO3) = 540Mg/Ltr
d) pH Value = 6.5 - 8.5
e) total solid Mg /Ltrs = -
f) Other =
Static head in Mrs = 4.00 mtrs.
Length of R/Main = 210 mtrs.
Dia of Rising main = 150 G.I Pipe (M)
No of working hours per day = 16 Hours
Limit of pump operation. = (-) 15 % (+) 10% of total head
R.P.M. of pumping set. = 2900 RPM ( or to be specified by the tenderer)
Test run. = 16 Hours continueously for 7 days
Providing and fixing of Kirloskar/Leader/Kilburn and any other make approved by state level Technical Committee JSV double flanged Cast Iron Accuated Sluice valve PN-1.6 confirming to BIS 14846 having bypass arrangement (to be provided on delivery side) of size one step higher than the delivery size of pump latest upto date ammendment complete in all respect including all leads and Lifts as per the direction and to the entire satisfaction of Engineer-In-Charge. (1 No.)
Providing & Fixing of Kirloskar/ Kilburn/IVC/Fouress /Gled/BHEL/Leader make Cast Iron Accuated double flanged swing check type reflux valve PN-1.6 confirming to BIS 5312 having bypass arrangement equal to dia of rising main shall be suitable for withstanding nominal seat pressure complete in all respect including all leads and Lifts as per the direction and to the entire satisfaction of Engineer-In-Charge. (1 No.)
Providing & laying PVC insulated jointless, flat water proof copper cable of Siemens/ Finolex/ Grandlay/ Gloster make conforming to BIS:1554 (Part I) -1988 or latest with up to date ammendments of suitable size for the pump sets offered(one cable carrying all three phases) including all other electrical equipment /accessories such as thimbles ,flexible pipe, solder, nuts & bolts cable glands etc. laid in pipes or trenches under floor. The type,size & make will be subject to approval of HPSEB authorities.In case of non acceptance by HPSEB authorities it shall have to be replaced by the tenderer free of cost.
On supply side of 3½ core coper cable of required size ( From HPSEB Meter to Switch & Starter). (18 Rmt.)
On motor side 3 core flat joint less copper cable of size of required size ( From Switch & Starter to Motor) (170 Rmt.)
Providing and Laying column aseembly of G.I./MSREW pipe considering site requirements and having appropriate size in accordance with the delivery size of pumping set . The pipe shall conform to relevant BIS codes & capable of with standing the feild test pressure equal to 1.5 times the operating pressure including all type of fittings such as bends, tapers/ reducers, flanges, rubber gaskets 3mmthick, nuts & bolts and any other fitting required at site and work shall be to the entire satisfaction of Engineer-in-Charge. The pipe material shall conform to relevant BIS Code and capable of with standing FTP equal to 1.5 times the operating pressure the complete arrangement shall compromise of
Suction Pipe = ____ dia = to be specified by the Tenderer (10 Rmt.)
Delivery pipe = ____ dia = to be specified by the Tenderer (10 Rmt.)
Common Header = ____ dia = to be specified by the Tenderer (10 Rmt.)
Errection of all equipments of Pumping Machinery including cost of tees, bends, tapers & any other fittings required as per site conditions & as per directions of Engineer-in-Charge.
Supply , Installation, Testing and Commissioning of Energy Saving Variable Frequency Starter Panel for submersible pump made out of 16 Gauge sheet, powder coated dust and vermin proof, wall/base mounted and front opening door type with copper insulated wiring suitable to operate 2 Nos. pump (1 working ) of the rating required HP . Starter should be capable enough to handle the following faults like short circuit, over current, under current, over voltage, under voltage, dry run protection and phase loss with LED ON/OFF & TRIP indicators, Power Quality Monitoring & Controlling Relay at the Incomer Feeder, Should be fitted with Surge Suppressor Device suiatble to protect against class-1 & 2 surges. Make: Aarmation Electric Private Limited/MAS/ELLES/Adlec (1 No.)
Energy Saving Variable Frequency Starter of required HP Heavy Duty for smooth start and smooth stop of pumps and for the energy conservation in the system. It Should be capable to monitor & control the frequecy of pumps through out the operation and to maintain the power factor of the system within acceptable limits. It should be able to withstand ambient temperature upto 50 Degrees celcius without derating and have conformal coating class 3C2, so that it can work in any harsh environment like moisture etc. Make: Aarmation Electric Private Limited/Bechoff/Bosch/Rockwell (1 No.)
Multi function meter indicating different parameters like Current, Voltage, KWH, PF, THD etc with RS 485 communication Make L&T/Conserve/Siemens (1 No.)
Main incomer MCCB suitable capacity of L&T / Standard make on the coming feeder for pumping set confirming to BIS 2516-1985 ( Latest edition) with neutral linked under voltage release. (1 No.)
LED Three phase indicating lamps complete with logged switches for individual motors conforming to BIS 3452 ( Part I & II ) latest with upto date ammendments. (1 Set)
LED On / Off indicator and push button, Control and power wiring,Power capacitor,Cooling fan 230 VAC, Contorl terminal, Buss Bar, i.e.Bolt, insulator, etc. (1 Set)
Input Choke of required HP for Energy saving variable frequency Starter which should be installed at the input of Energy saving variable frequency starter, so that there should be proper protection in case of any voltage surge and distortions. (2 Nos.)
Control Transformer to safegaurd the control circuit of all the components from the voltage surges and spikes. (1 No.)
Power and Control wiring and Busbar (1 No.)
Installation, Commissioning and Software Development (1 No.)
Surge suppressor device with Isolating MCCB to eliminate the power surges due to lightening and system surges. (1 No.)
Power quality monitoring & controlling relay with Control Contactor to safeguard the Electronic & Electric elements (1 No.)
Independent Control Panel with Switch Fuse Unit and Fuses of Suitable Amperage to eliminate the KitKat fuses of HPSEB Make: Aarmation/Siemens/Schneider/L&T (1 Set)
Programmable logic controller with appropriate digital and analog inputs and outputs to give automatic command to star delta and also will get data from Multi function Meter for Current, Voltage, KWH, PF and THD. Make Mitsubishi/L&T/Delta
Electronic relay card 8 channel for PLC system (1 No.)
SMPS 4.5 Amps to energise PLC system (1 No.)
HMI 7" display with IOT to give on and off command manually and also to show pump running and breakdown status at pump station Make Wientek/Exor/Mitsubishi/Mecon. (1 No.)
Control MCB for Automation System (1 No.)
Level Sensor to indicate the water level of tank remotely (2 No.)
Shielded Data Cable for Communication of Level Sensor with PLC (1 No.)
Supply of Mobile App (Android/IOS) with User ID and Password to monitor and control the pumping operation from Mobile for 3 users. Make: Aarmation Electric/Bechoff Automation/ Rockwell Automation. (1 No.)
Cloud GateWay for Data Clouding to Server (1 No.)
SCADA software to be installed in Laptop/PC to remotely monitor and control the operation of pumps and also to analysis the pump start and stop history logging, fault status, fault history, Power Quality Parameters like PF, Current, Voltage, KWH, THD etc Make Aarmation Electric/Rockwell Automation/ Backoff Automation (1 No.)
Cloud Space for data storage at cloud/server (1 No.)
Installation, Commissioning and Software Development (1 No.)
Phase-1st Supply of horizontal spindle,horizontal/radial split casing and suction (backpull out arrangement) single/ double / multistage centrifugal pumps or combination of pumps in series /parallel of KSB / Mather & Platt/ Jyoti /Kirloskar /BE /Maxflow/ Beaconweir Sabar make conforming to BIS: 1520-1980 (latestwith upto date ammendments) read with BIS: 9137-1978 (latest edition) suitable for lifting water of under mentioned charactristics with impellers of bronze/suitable alloy, priming funnels,casing ring & shaft sleeves of bronze/ suitable alloy, shaft of sutable steel grade with cast iron casing coupled directly through a flexible coupling on a common C.I. / Cast steel base plate (base plate to be from the principle manufacturer of pumping set) to slippering/squirrel cage screen protected drip proof electric induction motor of Kirlokar /NGEF/Crompton / Siemen /Jyoti /BHEL /GEC /ABB conforming to BIS: 325-1978 read read with BIS: 900-1968 (latest with upto date ammendments) It should include the cost of bearings, nuts & bolts,painting etc. (For detailed specification refer as per chapter No. 3 & data sheet No. 5.) The pump shall be suitable for operation on data given below:- (For detailed specification refer as per chapter No. 3 & data sheet No. 9.)
Total Head = 267.87 Mtrs
Discharge required from each pump. = 10.26 LPS
No. of pump required = 2.00 Nos. One act as stand by
Location of the site of installation of machinery. = The site is located at a distance of 20 Kmts from Palampur.
The Altitude of installation. = The altitude of place is 955 mtrs above MSL
Type of current. = AC Three phase supply with
Rate Voltage = 400 ± 10%
Type of water and its source = Clear water from WTP
Charactristics of water. = -
a) Ambient Temperature dig.c = 20° C
b) Turbidity NTU = 2 NTU (<50PPM)
c) Hardness260Mg/Ltrs(as CaCO3) = -
d) pH Value = 6.5 - 8.5
e) total solid Mg /Ltrs = -
f) Other =
Static head in Mrs = 235.80 mtrs.
Length of R/Main = 2500.00 mtrs.
Dia of Rising main = 125mm G.I. (H)
No of working hours per day = 16 Hours
Limit of pump operation. = (-) 15 % (+) 10% of total head
R.P.M. of pumping set. = 2900 RPM ( or to be specified by the tenderer)
Test run. = 16 Hours continueously for 7 days
Providing and fixing of Kirloskar/Leader/Kilburn and any other make approved by state level Technical Committee JSV double flanged Cast Steel Accuated Sluice valve ASA-300 confirming to BIS 1414 having bypass arrangement (to be provided on delivery side) of size one step higher than the delivery size of pump latest upto date ammendment complete in all respect including all leads and Lifts as per the direction and to the entire satisfaction of Engineer-In-Charge. (2 Nos.)
Providing & Fixing of Kirloskar/ Kilburn/IVC/Fouress /Gled/BHEL/Leader make Cast Steel Accuated double flanged swing check type reflux valve ASA-300 confirming to BIS 1868 having bypass arrangement equal to dia of rising main shall be suitable for withstanding nominal seat pressure complete in all respect including all leads and Lifts as per the direction and to the entire satisfaction of Engineer-In-Charge. (2 Nos.)
Providing & laying PVC insulated jointless, flat water proof copper cable of Siemens/ Finolex/ Grandlay/ Gloster make conforming to BIS:1554 (Part I) -1988 or latest with up to date ammendments of suitable size for the pump sets offered(one cable carrying all three phases) including all other electrical equipment /accessories such as thimbles ,flexible pipe, solder, nuts & bolts cable glands etc. laid in pipes or trenches under floor. The type,size & make will be subject to approval of HPSEB authorities.In case of non acceptance by HPSEB authorities it shall have to be replaced by the tenderer free of cost.
On supply side of 3½ core coper cable of required size( From HPSEB Meter to Switch & Starter). (18 Rmt.)
On motor side 3 core flat joint less copper cable of size of required size ( From Switch & Starter to Motor) (50 Rmt.)
Providing and Laying column aseembly of G.I./MSREW pipe considering site requirements and having appropriate size in accordance with the delivery size of pumping set . The pipe shall conform to relevant BIS codes & capable of with standing the feild test pressure equal to 1.5 times the operating pressure including all type of fittings such as bends, tapers/ reducers, flanges, rubber gaskets 3mmthick, nuts & bolts and any other fitting required at site and work shall be to the entire satisfaction of Engineer-in-Charge. The pipe material shall conform to relevant BIS Code and capable of with standing FTP equal to 1.5 times the operating pressure the complete arrangement shall compromise of
Suction Pipe = ____ dia = to be specified by the Tenderer (10 Rmt.)
Delivery pipe = ____ dia = to be specified by the Tenderer (10 Rmt.)
Common Header = ____ dia = to be specified by the Tenderer (10 Rmt.)
Errection of all equipments of Pumping Machinery including cost of tees, bends, tapers & any other fittings required as per site conditions & as per directions of Engineer-in-Charge.
Supply , Installation, Testing and Commissioning of Energy Saving Variable Frequency Starter Panel for centrifugal pump made out of 16 Gauge sheet, powder coated dust and vermin proof, wall/base mounted and front opening door type with copper insulated wiring suitable to operate 2 Nos. pump (1 working ) of the rating required HP . Starter should be capable enough to handle the following faults like short circuit, over current, under current, over voltage, under voltage, dry run protection and phase loss with LED ON/OFF & TRIP indicators, Power Quality Monitoring & Controlling Relay at the Incomer Feeder, Should be fitted with Surge Suppressor Device suiatble to protect against class-1 & 2 surges. Make: Aarmation Electric Private Limited/MAS/ELLES/Adlec (1 No.)
Energy Saving Variable Frequency Starter of required HP Heavy Duty for smooth start and smooth stop of pumps and for the energy conservation in the system. It Should be capable to monitor & control the frequecy of pumps through out the operation and to maintain the power factor of the system within acceptable limits. It should be able to withstand ambient temperature upto 50 Degrees celcius without derating and have conformal coating class 3C2, so that it can work in any harsh environment like moisture etc. Make: Aarmation Electric Private Limited/Bechoff/Bosch/Rockwell (1 No.)
Multi function meter indicating different parameters like Current, Voltage, KWH, PF, THD etc with RS 485 communication Make L&T/Conserve/Siemens (1 No.)
Main incomer MCCB suitable capacity of L&T / Standard make on the coming feeder for pumping set confirming to BIS 2516-1985 ( Latest edition) with neutral linked under voltage release. (1 No.)
LED Three phase indicating lamps complete with logged switches for individual motors conforming to BIS 3452 ( Part I & II ) latest with upto date ammendments. (1 Set)
LED On / Off indicator and push button, Control and power wiring,Power capacitor,Cooling fan 230 VAC, Contorl terminal, Buss Bar, i.e.Bolt, insulator, etc. (1 Set)
Input Choke of required HP for Energy saving variable frequency Starter which should be installed at the input of Energy saving variable frequency starter, so that there should be proper protection in case of any voltage surge and distortions. (2 Nos.)
Control Transformer to safegaurd the control circuit of all the components from the voltage surges and spikes. (1 No.)
Power and Control wiring and Busbar (1 No.)
Installation, Commissioning and Software Development (1 No.)
Surge suppressor device with Isolating MCCB to eliminate the power surges due to lightening and system surges. (1 No.)
Power quality monitoring & controlling relay with Control Contactor to safeguard the Electronic & Electric elements (1 No.)
Independent Control Panel with Switch Fuse Unit and Fuses of Suitable Amperage to eliminate the KitKat fuses of HPSEB Make: Aarmation/Siemens/Schneider/L&T (1 Set)
Programmable logic controller with appropriate digital and analog inputs and outputs to give automatic command to star delta and also will get data from Multi function Meter for Current, Voltage, KWH, PF and THD. Make Mitsubishi/L&T/Delta
Electronic relay card 8 channel for PLC system (1 No.)
SMPS 4.5 Amps to energise PLC system (1 No.)
HMI 7" display with IOT to give on and off command manually and also to show pump running and breakdown status at pump station Make Wientek/Exor/Mitsubishi/Mecon. (1 No.)
Control MCB for Automation System (1 No.)
Level Sensor to indicate the water level of tank remotely (2 No.)
Shielded Data Cable for Communication of Level Sensor with PLC (1 No.)
Supply of Mobile App (Android/IOS) with User ID and Password to monitor and control the pumping operation from Mobile for 3 users. Make: Aarmation Electric/Bechoff Automation/ Rockwell Automation. (1 No.)
Cloud GateWay for Data Clouding to Server (1 No.)
SCADA software to be installed in Laptop/PC to remotely monitor and control the operation of pumps and also to analysis the pump start and stop history logging, fault status, fault history, Power Quality Parameters like PF, Current, Voltage, KWH, THD etc Make Aarmation Electric/Rockwell Automation/ Backoff Automation (1 No.)
Cloud Space for data storage at cloud/server (1 No.)
Installation, Commissioning and Software Development (1 No.)
Phase-3rd Supply of horizontal spindle,horizontal/radial split casing and suction (backpull out arrangement) single/ double / multistage centrifugal pumps or combination of pumps in series /parallel of KSB / Mather & Platt/ Jyoti /Kirloskar /BE /Maxflow/ Beaconweir Sabar make conforming to BIS: 1520-1980 (latestwith upto date ammendments) read with BIS: 9137-1978 (latest edition) suitable for lifting water of under mentioned charactristics with impellers of bronze/suitable alloy, priming funnels,casing ring & shaft sleeves of bronze/ suitable alloy, shaft of sutable steel grade with cast iron casing coupled directly through a flexible coupling on a common C.I. / Cast steel base plate (base plate to be from the principle manufacturer of pumping set) to slippering/squirrel cage screen protected drip proof electric induction motor of Kirlokar /NGEF/Crompton / Siemen /Jyoti /BHEL /GEC /ABB conforming to BIS: 325-1978 read read with BIS: 900-1968 (latest with upto date ammendments) It should include the cost of bearings, nuts & bolts,painting etc. (For detailed specification refer as per chapter No. 3 & data sheet No. 5.) The pump shall be suitable for operation on data given below:- (For detailed specification refer as per chapter No. 3 & data sheet No. 9.)
Total Head = 92.94 Mtrs
Discharge required from each pump. = 17.67 LPS
No. of pump required = 2.00 Nos. One act as stand by
Location of the site of installation of machinery. = The site is located at a distance of 20 Kmts from Palampur.
The Altitude of installation. = The altitude of place is 955 mtrs above MSL
Type of current. = AC Three phase supply with
Rate Voltage = 400 ± 10%
Type of water and its source = Clear water from WTP
Charactristics of water. = -
a) Ambient Temperature dig.c = 20° C
b) Turbidity NTU = 2 NTU (<50PPM)
c) Hardness260Mg/Ltrs(as CaCO3) = -
d) pH Value = 6.5 - 8.5
e) total solid Mg /Ltrs = -
f) Other =
Static head in Mrs = 52.00 mtrs.
Length of R/Main = 2800.00 mtrs.
Dia of Rising main = 150mm dia G.I.
No of working hours per day = 16 Hours
Limit of pump operation. = (-) 15 % (+) 10% of total head
R.P.M. of pumping set. = 2900 RPM ( or to be specified by the tenderer)
Test run. = 16 Hours continueously for 7 days
Providing and fixing of Kirloskar/Leader/Kilburn and any other make approved by state level Technical Committee JSV double flanged Cast Steel Accuated Sluice valve ASA-150 confirming to BIS 1414 having bypass arrangement (to be provided on delivery side) of size one step higher than the delivery size of pump latest upto date ammendment complete in all respect including all leads and Lifts as per the direction and to the entire satisfaction of Engineer-In-Charge. (2 Nos.)
Providing & Fixing of Kirloskar/ Kilburn/IVC/Fouress /Gled/BHEL/Leader make Cast Steel Accuated double flanged swing check type reflux valve ASA-150 confirming to BIS 1868 having bypass arrangement equal to dia of rising main shall be suitable for withstanding nominal seat pressure complete in all respect including all leads and Lifts as per the direction and to the entire satisfaction of Engineer-In-Charge. (2 Nos.)
Providing & laying PVC insulated jointless, flat water proof copper cable of Siemens/ Finolex/ Grandlay/ Gloster make conforming to BIS:1554 (Part I) -1988 or latest with up to date ammendments of suitable size for the pump sets offered(one cable carrying all three phases) including all other electrical equipment /accessories such as thimbles ,flexible pipe, solder, nuts & bolts cable glands etc. laid in pipes or trenches under floor. The type,size & make will be subject to approval of HPSEB authorities.In case of non acceptance by HPSEB authorities it shall have to be replaced by the tenderer free of cost.
On supply side of 3½ core coper cable of required size ( From HPSEB Meter to Switch & Starter). (18 Rmt.)
On motor side 3 core flat joint less copper cable of size of required size ( From Switch & Starter to Motor) (50 Rmt.)
Providing and Laying column aseembly of G.I./MSREW pipe considering site requirements and having appropriate size in accordance with the delivery size of pumping set . The pipe shall conform to relevant BIS codes & capable of with standing the feild test pressure equal to 1.5 times the operating pressure including all type of fittings such as bends, tapers/ reducers, flanges, rubber gaskets 3mmthick, nuts & bolts and any other fitting required at site and work shall be to the entire satisfaction of Engineer-in-Charge. The pipe material shall conform to relevant BIS Code and capable of with standing FTP equal to 1.5 times the operating pressure the complete arrangement shall compromise of
Suction Pipe = ____ dia = to be specified by the Tenderer (10 Rmt.)
Delivery pipe = ____ dia = to be specified by the Tenderer (10 Rmt.)
Common Header = ____ dia = to be specified by the Tenderer (10 Rmt.)
Errection of all equipments of Pumping Machinery including cost of tees, bends, tapers & any other fittings required as per site conditions & as per directions of Engineer-in-Charge.
Supply , Installation, Testing and Commissioning of Energy Saving Variable Frequency Starter Panel for centrifugal pump made out of 16 Gauge sheet, powder coated dust and vermin proof, wall/base mounted and front opening door type with copper insulated wiring suitable to operate 2 Nos. pump (1 working ) of the rating required HP . Starter should be capable enough to handle the following faults like short circuit, over current, under current, over voltage, under voltage, dry run protection and phase loss with LED ON/OFF & TRIP indicators, Power Quality Monitoring & Controlling Relay at the Incomer Feeder, Should be fitted with Surge Suppressor Device suiatble to protect against class-1 & 2 surges. Make: Aarmation Electric Private Limited/MAS/ELLES/Adlec (1 No.)
Energy Saving Variable Frequency Starter of required HP Heavy Duty for smooth start and smooth stop of pumps and for the energy conservation in the system. It Should be capable to monitor & control the frequecy of pumps through out the operation and to maintain the power factor of the system within acceptable limits. It should be able to withstand ambient temperature upto 50 Degrees celcius without derating and have conformal coating class 3C2, so that it can work in any harsh environment like moisture etc. Make: Aarmation Electric Private Limited/Bechoff/Bosch/Rockwell (1 No.)
Multi function meter indicating different parameters like Current, Voltage, KWH, PF, THD etc with RS 485 communication Make L&T/Conserve/Siemens (1 No.)
Main incomer MCCB suitable capacity of L&T / Standard make on the coming feeder for pumping set confirming to BIS 2516-1985 ( Latest edition) with neutral linked under voltage release. (1 No.)
LED Three phase indicating lamps complete with logged switches for individual motors conforming to BIS 3452 ( Part I & II ) latest with upto date ammendments. (1 Set)
LED On / Off indicator and push button, Control and power wiring,Power capacitor,Cooling fan 230 VAC, Contorl terminal, Buss Bar, i.e.Bolt, insulator, etc. (1 Set)
Input Choke of required HP for Energy saving variable frequency Starter which should be installed at the input of Energy saving variable frequency starter, so that there should be proper protection in case of any voltage surge and distortions. (2 Nos.)
Control Transformer to safegaurd the control circuit of all the components from the voltage surges and spikes. (1 No.)
Power and Control wiring and Busbar (1 No.)
Installation, Commissioning and Software Development (1 No.)
Surge suppressor device with Isolating MCCB to eliminate the power surges due to lightening and system surges. (1 No.)
Power quality monitoring & controlling relay with Control Contactor to safeguard the Electronic & Electric elements (1 No.)
Independent Control Panel with Switch Fuse Unit and Fuses of Suitable Amperage to eliminate the KitKat fuses of HPSEB Make: Aarmation/Siemens/Schneider/L&T (1 Set)
Programmable logic controller with appropriate digital and analog inputs and outputs to give automatic command to star delta and also will get data from Multi function Meter for Current, Voltage, KWH, PF and THD. Make Mitsubishi/L&T/Delta
Electronic relay card 8 channel for PLC system (1 No.)
SMPS 4.5 Amps to energise PLC system (1 No.)
HMI 7" display with IOT to give on and off command manually and also to show pump running and breakdown status at pump station Make Wientek/Exor/Mitsubishi/Mecon. (1 No.)
Control MCB for Automation System (1 No.)
Level Sensor to indicate the water level of tank remotely (2 No.)
Shielded Data Cable for Communication of Level Sensor with PLC (1 No.)
Supply of Mobile App (Android/IOS) with User ID and Password to monitor and control the pumping operation from Mobile for 3 users. Make: Aarmation Electric/Bechoff Automation/ Rockwell Automation. (1 No.)
Cloud GateWay for Data Clouding to Server (1 No.)
SCADA software to be installed in Laptop/PC to remotely monitor and control the operation of pumps and also to analysis the pump start and stop history logging, fault status, fault history, Power Quality Parameters like PF, Current, Voltage, KWH, THD etc Make Aarmation Electric/Rockwell Automation/ Backoff Automation (1 No.)
Cloud Space for data storage at cloud/server (1 No.)
Installation, Commissioning and Software Development (1 No.)
Excavation in foundation and trenches (for pipes and pits) up to all depths and in all clasification of earth work such as pick Work, jumper work, chiselling or Wedging out of soft and hard rock where the blasting work is prohibited saturated soil including pumping or bailing out water in all lifts including trimming and dressng of sides, levelling of beds to correct grade including shoring strutting planking timbering and dewatering where ever required. Stacking usable and unusable matrial/soil separetaly and after laying, jointing and testing of pipes (for pipes, pipe duct, chambers, x-signs etc.) returning the usable soil in 15 cm layers by ramming and wetering and then desposing of all surlus excavated soil/un usable material as directed wirhin all leads/lifts includng restoration of unmetalled surfaces to its original conditionn and includng cost of divresion for traffic, night signal boards, fixing custion boards, crossing over tranches for access to houses, fencing etc. complete in all respect as per the direction and to be entire of Engineer-in-Charge within all leads and lifts.
Providing, laying, jointing & testing of bevelled ended GI pipe of following dia and Class with MS Flange of following Table (6%) flange joint & other Pipe (94%) circumfrential butt welded joints by electrical arc welding (welding thickness shall be equal to pipe wall thickness) and testing of GI pipe of following dia meters conforming to IS 1239-2004 (Part-II), having wall thickness as specified below capable of withstanding required test pressure, including manufacturing and febrication of reducers/ tapers , all short pieces, bends etc. as per site requirement made from parent tubes. The laying of pipe shall include all operations such as cutting, welding, jointing, fabrication of bends, tees, making bevelled pipe ends suitable for butt welding , lowering & laying in excavated trenches to ensure required level complete in all respects to the best satisfaction of the Engineer-in-charge (Earth work in trenches and cost of providing flanges i/c nuts & bolts, welding of flanges, gasket will be measured and paid for separately) . The fabricated bends shall have three or four cuts having its radius not less than five times the dia of pipe. The welding electrodes shall be as per IS 814 of Advani Oerlikon/ L&T or ISI marked make. The damaged portion of the pipes ( If damaged during laying & jointing operation of pipe) and all other specials made from the parent tube shall be provided with anticorrosive treatment by applying two coats of anticorrosive bituminous paint over a priming coat as per AWWA specifications C-203-1978. The D.P. test of butt welded joints complete in all respect and to the best satisfaction & direction of Engineer in charge with in all leads and lifts. (For detailed specification refer as per chapter No. 2 & data sheet No. 8)
GI pipe 150 mm dia Medium Class
GI pipe 125mm dia Heavy Class
GI pipe 125mm dia Medium Class
GI pipe 100mm dia Medium Class
GI pipe 80mm dia Medium Class
GI pipe 50mm dia Medium Class
Providing and welding of MS flanges (In pairs) for the joints of GI / MSERW pipes mentioned as below and same shall conform to BIS 6392-1971 ( latest with up to date amendments) including the cost of nuts and bolts of required sizes, 3mm thick compressed asbestos fiber/synthetic rubber gaskets conforming to relevant BIS standards and it shall also include carriage of materials within all leads and lifts complete in all respect to the best satisfaction and direction of Engineer in charge, The welding of MS flanges with plain ended MSERW/G.I. pipe by two layer or outer face make joint leak proof.
150mm dia Table-5
150mm dia Table-17
125mm dia Table-5
125mm dia Table-17
125mm dia Table-28
100mm dia Table-5
80mm dia Table-5
80mm dia Table-17
50mm dia Table-5
Supply, delivery, erection and commissioning of vaccum operated, pressure feed chlorination system capable to treat water i/c control panel, Chlorinator, interconnecting pipe line, field test kit, Monoblock pump, Chlorine leak detector, On-line chlorine analyser, Gas cylinder 100 kg 5 no's, gas tonner etccomplete at WTP Site. Provision for online Quality Monitoring at storage reservoirs shall be provided. Plant room for installation of above equipments shall also be constructed at the site complete in all respect.The rates quoted by the contractor shall be for the complete work. All ancilliary works and accessories required to make the system fully functional shall be included in the cost of work. Nothing extra shall be paid on this account. (For detailed specification refer as per chapter No. 5 & data sheet No. 10)
For MBR at Sakot (Phase-1st)
For MBR at Niyanda (Phase-3rd)
Unipro Techno Infrastructure Pvt Ltd
National India Construction Co.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid