| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.2 LAdmitted-Fee/PreQual/Technical/Finance AT GORUAL PO GORUAL PS BRAHMAGIRI DIST PURI PIN 752002 | PURI | PURI | ODISHA | 752002 | -39.33% | ₹5.2 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹5.9 L+₹71,811.04 (13.7%)Admitted-Fee/PreQual/Technical/Finance | -31.00% | ₹5.9 L+₹71,811.04 (13.7%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹6.0 L+₹80,518.02 (15.4%)Admitted-Fee/PreQual/Technical/Finance | -29.99% | ₹6.0 L+₹80,518.02 (15.4%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹6.9 L+₹1.7 L (31.9%)Admitted-Fee/PreQual/Technical/Finance | -19.99% | ₹6.9 L+₹1.7 L (31.9%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
EMD Value
₹8,700
Closing Date
9 Sept 2026, 5:00 pmClosed
Deputy Director (Geology)
Office of Deputy Director (Geology),A/2,UNIT-V,751001 GWD Division-II, BBSR
Construction of 05 nos. of Recharge shafts in Tanks/Ponds in Kakatpur Block area of Puri district for the FY -2026-27.
2026_GWSI_139756_1
01/GWRSD/ARUA/2026-27
Open Tender
Civil Works - Others
Percentage
60 days
Kakatpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,000
₹8,700
Yes
10 Sept 2026
31 Aug 2026
10 Sept 2026
31 Aug 2026
9 Sept 2026
31 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Site clearance & approach road for construction work | 500 | sqm | 2.86 | ₹1,430 |
| 2 | Drilling a perfectly vertical bore hole of 150mm/100mm dia in hard rock formation as required to the site condition as per direction including cost of acssesories,tools & plants,consumables & rig charges etc. complete | 150 | Mtr | 650 | ₹97,500 |
| 3 | Lowering Of 125mm dia blank PVC pipe 80 Sch. Without 3 mtr slot in perfectly vertical position including cost of pipes etc complete | 130 | Mtr | 1,063.2 | ₹1,38,216 |
| 4 | Lowering Of 125mm dia blank PVC pipe 80 Sch. With 3 mtr slot in perfectly vertical position including cost of pipes etc complete | 20 | Mtr | 1,074.7 | ₹21,494 |
| 5 | Operation of Compressor for development of B/W LS | 5 | No | 3,511 | ₹17,555 |
| 6 | Well Cap 5" Dia With PVC Cone | 5 | No | 500 | ₹2,500 |
| 7 | Supplying & Lying of R C C Ring 5ft made up of 6 mm dia MS rod for storage cum recharge pit including cost, transporting etc complete. | 60 | Nos | 1,400 | ₹84,000 |
| 8 | Earth work excavation in stoney earth or gravely soil mixed with boulder not exceeding 0.014cum within 50m initial lead & 1.5m initial lift including rough dressing & breaking clods to minimum 5cm to 7cm as per the direction | 46.7 | cum | 441.17 | ₹20,602.64 |
| 9 | Earth work excavation in stoney earth or gravely soil mixed with boulder not exceeding 0.014cum within 50m initial lead & 1.5m initial lift including rough dressing & breaking clods to minimum 5cm to 7cm as per the direction. 2nd Depth of 1.5m | 13.25 | cum | 695.47 | ₹9,214.98 |
| 10 | Earth work excavation in stoney earth or gravely soil mixed with boulder not exceeding 0.014cum within 50m initial lead & 1.5m initial lift including rough dressing & breaking clods to minimum 5cm to 7cm as per the direction. 3rd Depth of 1.5m | 1.3 | cum | 729.19 | ₹947.95 |
stage.html
html • 0.02 MB
finance_607612.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.34 MB
TDARUA01.pdf
Tender Documents • 1.41 MB
BOQ_607612.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .