| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.9 CrAccepted-AOC | ₹6.9 Cr | L1 | Accepted-AOC L1 Bidder |
| 2 | L2₹8.2 CrRejected-AOC | ₹8.2 Cr | L2 | Rejected-AOC L2 Bidder |
| 3 | Rejected-Technical | - | - | Rejected-Technical Techno Commercial Non Responsive |
| Sl No | Description | Qty | Unit | Mittal Brothers Engineers and Contractors L2 | AK AND AK SOIL ENTERPRISES PRIVATE LIMITED L1 |
|---|---|---|---|---|---|
| 1.00Part-A (Civil Works) | |||||
| 2.00 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 1,692.46 | Cum | 420 ₹7.1 L | 300 ₹5.1 L |
| 3.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
1:2:4 (1 Cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size | 5 | Cum | 8,600 ₹43,000 | 8,300 ₹41,500 |
| 4.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) | 53.27 | Cum | 8,600 ₹4.6 L | 7,500 ₹4.0 L |
| 5.00 | Centering and shuttering including strutting, propping etc. and removal of form foLintels, beams, plinth beams, girders, bressumers and
Cantilevers | 1,551.27 | Sqm | 430 ₹6.7 L | 330 ₹5.1 L |
| 6.00 | Centering and shuttering including strutting, propping etc. and removal of form for : Columns, Pillars, Piers, Abutments, Posts and Struts | 830.76 | Sqm | 430 ₹3.6 L | 330 ₹2.7 L |
| 7.00 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. | 2,59,000 | Kg | 125 ₹3.2 Cr | 105 ₹2.7 Cr |
| 8.00 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement.All works upto plinth level Concrete of M25 grade with minimum cement content of 330 kg /cum. | 1,048.74 | Cum | 9,800 ₹1.0 Cr | 9,000 ₹94.4 L |
| 9.00 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 52,678.08 | Kg | 140 ₹73.7 L | 121 ₹63.7 L |
| 10.00 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. | 56.98 | Cum | 225 ₹12,820.50 | 200 ₹11,396 |
Tender Value
Refer Docs
EMD Value
₹12.7 L
Closing Date
25 Aug 2025, 3:30 pmClosed
S E C and P 2
S E C and P 2 PTCUL Majra Dehradun
Construction of pile foundations at different tower locations for the work of Termination of 220 kV Jhajra Sherpur line at 400 kV Substation Sherpur PGCIL Dehradun
2025_PTCU4_84746_1
PTCUL/CandP-II/Civil-07/25-26
Open Tender
Civil Works
540 days
Dehradun
Please refer Tender Documents and NIT
4 documents required · 4 mandatory
₹23,600
Yes
MD PTCUL
₹12.7 L
Yes
Dehradun
16 Jun 2026
10 Jun 2025
26 Aug 2025
10 Jun 2025
25 Aug 2025
1 Jul 2025
24 Jun 2025
Amount
Part-A (Civil Works)
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 Cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size)
Centering and shuttering including strutting, propping etc. and removal of form foLintels, beams, plinth beams, girders, bressumers and Cantilevers
Centering and shuttering including strutting, propping etc. and removal of form for : Columns, Pillars, Piers, Abutments, Posts and Struts
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more.
Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement.All works upto plinth level Concrete of M25 grade with minimum cement content of 330 kg /cum.
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge.
Boring, providing and installation bored cast-in-situ reinforced cement concrete piles of garde M-25 of specified diameter and length below pile cap, to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of boring with bentonite solution and temporary casing of appropriate length for setting out and removal of same and the length of the pile to be embedded in the pile cap etc. by Crawler mounted, telescopic boom hydraulic pilling Rig all complete, including removal of excavated earth with all its lifts and leads (length of pile for payment shall be measured up to bottom of pile cap). 750 mm dia piles
Boring, providing and installation bored cast-in-situ reinforced cement concrete piles of garde M-25 of specified diameter and length below pile cap, to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of boring with bentonite solution and temporary casing of appropriate length for setting out and removal of same and the length of the pile to be embedded in the pile cap etc. by Crawler mounted, telescopic boom hydraulic pilling Rig all complete, including removal of excavated earth with all its lifts and leads (length of pile for payment shall be measured up to bottom of pile cap). 1200 mm dia piles
Boring, providing and installation bored cast-in-situ reinforced cement concrete piles of garde M-25 of specified diameter and length below pile cap, to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of boring with bentonite solution and temporary casing of appropriate length for setting out and removal of same and the length of the pile to be embedded in the pile cap etc. by Crawler mounted, telescopic boom hydraulic pilling Rig all complete, including removal of excavated earth with all its lifts and leads (length of pile for payment shall be measured up to bottom of pile cap). 1500 mm dia piles
Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with : Cement mortar 1:6 (1 cement : 6 coarse sand)
Coursed rubble masonry (first sort) with hard stone in foundation and plinth with : 7.6.1 Cement mortar 1:6 (1 cement : 6 coarse sand)
Fixing of template for stub of tower in correct position, level and alingnment including placing of stub including cartage of template from departmental store and taking back to departmental store after complition of work including cost of all labour T&P etc. Required for proper complition of work. (Stub and template will be provided by the department free of cost ) (NSI)
Pumping out water caused by spring, tidal or river seepage broken water mains or drains and the like.
Boulder apron laid in wire crates (Providing and laying of boulder apron laid in wire crates made with 4mm dia GI wire conforming to IS: 280 & IS:4826 in 100mm x 100mm mesh (weaved diagonally) including 10% extra for laps and joints laid with stone boulders weighing not less than 40 kg each.) (PWD SOR-2022-23 Item no-15-2)
Description of Work / Item(s)
Amount
Total Part-A (Civil Works) from BoQ1sheet WITHOUT GST
Add GST* Amount on (Total of Part-A above)
Mittal Brothers Engineers and Contractors (BID ID -393786)
Mittal Brothers Engineers and Contractors (BID ID -393786)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid