Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.2 LAccepted-AOC | L1 | Accepted-AOC AGREEMENT EXECUTED | |
| 2 | L2₹25.7 L+₹47,979.87 (1.90%)Rejected-AOC | L2 | Rejected-AOC L2 |
Tender Value
₹25.8 L
EMD Value
₹50,000
Closing Date
25 Jul 2024, 4:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer,Irrigation DivisionMalappuram,
office of The Executive Engineer,Irrigation Division Malappuram,
RMF-Protecting the right bank of Kadalundi River-at Kunnathazham (Near Nalakathu kunjathutty 39 House) in ward Number 18 of Moonniyur Grama panchayath-General Civil Work
2024_Irrig_675515_3
IRR/IA/TR/7715/2022_5_1_1/1
Open Tender
Civil Works - Roads
Item Wise
240 days
ward Number 18 of Moonniyur Grama panchayath
Please refer tender document
10 documents required · 10 mandatory
₹2,760
₹50,000
25 Sept 2024
12 Jul 2024
29 Jul 2024
12 Jul 2024
25 Jul 2024
12 Jul 2024
Amount
Side Protection works
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
60.7.6:Supplying and stacking granite stone 20 to 45 dm3 for dumping works- Supplying at site of work granite stone 20 to 45 dm3 in size (60% 45m3,30%30 to 40dm3 and 10% 20 to 30dm3 stones) for measurement ( deducting not less than 15% for voids as fixed by the departmental officer at site) including all cost, conveyance, loading and unloading charges all other incidental charges all leads and lifts etc. complete as per the direction of the departmental officers at site.
60.7.7:Conveyance and dumping of departmental granite stones-Conveyance of departmental granite stone 20 to 45 dm3 in size from stack at site and dumping in position (60% 45m3,30%30 to 40dm3 and 10% 20 to 30dm3 stones) to lines and levels to from the core of the sea wall as per approved design including all leads and lifts etc. complete as per the direction of the departmental officers at site.
OD20056/2022-2023:DR PACKING FOR APRONS - Rough stone dry packing for apron with good quality blasted rubble (Quantity included in the Dumped Item) including packing to compactness to lines levels, labour charges only etc. complete as per direction of Departmental officers at site ( DSoR- 60.7.4 Modified)
60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
4.3.2:Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
OD21578/2022-2023:Supplying and fixing boundary stone with RCC 1:1.5:3 pillar block having a size of 30*30*75 cm, steel reinforcement for RCC work, etc complete, fixed in CC1:3:6 using 40 mm metal 55*55*60 cm etc complete and centering and shuttering including strutting , propping and removal of form work for pillar and foundation.
OD21577/2022-2023:Planting herbs and shrubs species (medicinal plants ) on the top of river bank in two rows at an average spacing of 2m C/C along the length of protection work including clearing light jungle along the river bank for an average width of 2m digging pits of size 30x30x30cm in ordinary soil after rain transportation of seedlings in gunny bags (size 35x24) to planting sites covering pits digging plant holes and planting seedlings supplying and fitting temporary tree guard using bamboo for protection of seedlings including cost of seedlings etc. complete
2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
P ABDUL AZEEZ
Bidder Name
Ponnappn
P ABDUL AZEEZ
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1058483.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .