Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹1.3 CrAccepted-AOC | ₹1.3 Cr | L-1 | Accepted-AOC L-1 |
| 2 | L-2₹1.6 Cr+₹25.4 L (19.3%)Rejected-AOC | ₹1.6 Cr+₹25.4 L (19.3%) | L-2 | Rejected-AOC L-2 |
| 3 | L-3₹1.7 Cr+₹35.4 L (26.8%)Rejected-AOC | ₹1.7 Cr+₹35.4 L (26.8%) | L-3 | Rejected-AOC L-3 |
| 4 | L-4₹1.7 Cr+₹38.8 L (29.4%)Rejected-AOC FCI CHHAK BANARPAL KULAD KULAD VILLAGE TOWN KULAD CITY ANGUL ANGUL ODISHA 759145 INDIA | ANUGUL | ODISHA | 759145 | ₹1.7 Cr+₹38.8 L (29.4%) | L-4 | Rejected-AOC L-4 |
| 5 | L-5₹1.9 Cr+₹56.9 L (43.1%)Rejected-AOC | ₹1.9 Cr+₹56.9 L (43.1%) | L-5 | Rejected-AOC L-5 |
Tender Value
Refer Docs
EMD Value
₹1.3 L
Closing Date
2 Jun 2020, 3:00 pmClosed
Shri P.K.SUBUDHI
AGM (MECH.) CONTRACTS, CPP, NALCO, ANGUL
SHIFTING /ROAD TRANSPORTATION OF STORAGE COAL FROM UNIT 10 SIDE STOCKPILE AND CHP-3 SOUTH SIDE EXTENSION YARD (CHP-3X) TO CHP COAL YARDS.
2020_NALCO_557004_1
MC-4905
Open Tender
Miscellaneous Services
Item Rate
730 days
CPP, NALCO, ANGUL
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
Yes
NATIONAL ALUMINIUM COMPANY LIMITED
₹1.3 L
Yes
22 Feb 2021
29 Apr 2020
4 Jun 2020
29 Apr 2020
2 Jun 2020
29 Apr 2020
Amount
Mechanized loading & Transportation: 1. The party will have to shift / transport minimum 3000 MT per day. The shortfall to this minimum quantity will attract penalty as detailed in SCC. 2. To above effect party has to arrange / engage transporting vehicles and loading machines as required. As a guideline party has to engage minimum 10nos. of Hyva (15-20 MT capacity) and loading machines accordingly (for non-stop work and vehicle movement) round the clock. 3. Coal will be loaded and shifted / transported from CHP-3X yard / from site near unit#10 cooling tower or at any other location inside the plant premise to coal yards of CHP-1, CHP-2 or CHP-3 and get unloaded as per instruction / decision of MIC depending upon the requirement. Party has to obey and execute the work accordingly. However as per estimation maximum coverage distance is 3.5 km approx. for movement for coal loading to weighment to unloading. 4. Party has to execute the work within the prevailing site condition, weather, and coal quality, etc. and should not raise any objection to that effect. Although contract period is for two years, depending upon plant requirement complete work i.e. total of BOQ execution may be needed within a short period and party has to mobilize accordingly.
M/s. BINAYAK CONSTRUCTION
M/S.MANU ENTERPRISES
KAMALESH CONSTRUCTION PVT. LTD.
DIVINE ENTERPRISES
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .