| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹11.3 LAccepted-AOC | ₹11.3 L | 1 | Accepted-AOC agreement executed |
| 2 | 2₹11.6 L+₹28,792.80 (2.54%)Rejected-Finance | ₹11.6 L+₹28,792.80 (2.54%) | 2 | Rejected-Finance second least |
| 3 | 3₹11.9 L+₹60,661.29 (5.35%)Rejected-Finance SOUPARNIKA P O VELLUR | KERALA | ₹11.9 L+₹60,661.29 (5.35%) | 3 | Rejected-Finance highest |
| Sl No | Description | Qty | Unit | SADULI.K.M L2 | BENNY M JOSEPH L1 | Radhakrishnan P K V L3 |
|---|---|---|---|---|---|---|
| 1.00Road Formation | ||||||
| 1.00 | 3.5.1:Excavation in Cutting in Soil by manual means with lead upto 50 m Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3 | 36.45 | cum | 376.99 ₹13,741.29 | 200 ₹7,290 Lowest | 387.34 ₹14,118.54 |
| 1.00 | OD520638/2025-2026:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings
and technical specifications Clause 802, 803, 1202 & 1203 <br> I. P.C.C grade M 10
<br> (i) Nominal mix 1:3:6 | 12.15 | cum | 7,390.79 ₹89,798.1 Lowest | 7,900 ₹95,985 | 7,593.56 ₹92,261.75 |
| 1.00 | 11.4.2.1:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 II. P.C.C grade M 15 (i) Nominal mix (1:2.5:5) | 66.15 | cum | 7,511.69 ₹4,96,898.29 Lowest | 7,700 ₹5,09,355 | 7,717.78 ₹5,10,531.15 |
| 1.00 | 3.4:Construction of Embankment with Material Obtained from Borrow Pits Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 | 373.5 | cum | 565.21 ₹2,11,105.94 | 450 ₹1,68,075 Lowest | 580.71 ₹2,16,895.19 |
| 1.00 | 3.15.2:Compacting Original Ground (ii) Compacting original ground supporting subgrade Loosening of the ground upto a level of 300 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of Tables 300.1 and 300.2 for subgrade construction as per Technical Specification Clause 303.5.2. | 49.5 | cum | 58.59 ₹2,900.21 | 40 ₹1,980 Lowest | 60.2 ₹2,979.9 |
| 1.01 | 4.11.2:Granular sub-base/base/surface course with local materials (Table 400.13) by mix in place method normal. Construction of granular sub-base by providing local material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at once and compacting with smooth wheel roller to achieve the desired density complete as per Clause 401.4 as per Technical Specification Clause 408. (ii) Using Gravel mix soil. | 33.3 | cum | 2,122.39 ₹70,675.59 | 1,800 ₹59,940 Lowest | 2,180.61 ₹72,614.31 |
| 1.01 | 4.9:Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. By Mechanical Means with 1 km lead | 49.95 | cum | 3,206.36 ₹1,60,157.68 Lowest | 3,250 ₹1,62,337.5 | 3,294.32 ₹1,64,551.28 |
| 1.01 | 75.5.1.1pb:Prime Coat - Low porosity - With Packed Bitumen Rates Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 | 333 | sqm | 73.38 ₹24,435.54 Lowest | 90 ₹29,970 | 75.4 ₹25,108.2 |
| 1.01 | 75.5.2.3pb:Tack Coat - With Packed Bitumen Rates Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503. | 333 | sqm | 17.47 ₹5,817.51 Lowest | 19 ₹6,327 | 17.95 ₹5,977.35 |
Tender Value
₹12.7 L
EMD Value
₹31,742
Closing Date
2 Jul 2026, 3:00 pmClosed
Aneesh K
Assistant engineer, LSGD Engineering wing, Payyannur municipality
Project No.131/25-26-FCI - Manakkadi vayal road tarring
2026_LSGD_856988_4
AE/LSGD/ETNDR-01/2026-27
Open Tender
Civil Works - Roads
Item Rate
240 days
Payyannur Municipality
Please refer Tender documents.
10 documents required · 10 mandatory
₹2,760
Yes
₹31,742
Yes
7 Sept 2026
22 Jun 2026
6 Jul 2026
22 Jun 2026
2 Jul 2026
22 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Road Formation | |||||
| 1.001 | 3.5.1:Excavation in Cutting in Soil by manual means with lead upto 50 m Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3 | - | cum | - | - |
| 1.002 | OD520638/2025-2026:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings
and technical specifications Clause 802, 803, 1202 & 1203 <br> I. P.C.C grade M 10
<br> (i) Nominal mix 1:3:6 | - | cum | - | - |
| 1.003 | 11.4.2.1:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 II. P.C.C grade M 15 (i) Nominal mix (1:2.5:5) | - | cum | - | - |
| 1.004 | 3.4:Construction of Embankment with Material Obtained from Borrow Pits Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 | - | cum | - | - |
| 1.005 | 3.15.2:Compacting Original Ground (ii) Compacting original ground supporting subgrade Loosening of the ground upto a level of 300 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of Tables 300.1 and 300.2 for subgrade construction as per Technical Specification Clause 303.5.2. | - | cum | - | - |
| 1.006 | 4.11.2:Granular sub-base/base/surface course with local materials (Table 400.13) by mix in place method normal. Construction of granular sub-base by providing local material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at once and compacting with smooth wheel roller to achieve the desired density complete as per Clause 401.4 as per Technical Specification Clause 408. (ii) Using Gravel mix soil. | 1 | cum | - | - |
| 1.007 | 4.9:Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. By Mechanical Means with 1 km lead | - | cum | - | - |
| 1.008 | 75.5.1.1pb:Prime Coat - Low porosity - With Packed Bitumen Rates Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 | - | sqm | - | - |
| 1.009 | 75.5.2.3pb:Tack Coat - With Packed Bitumen Rates Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503. | - | sqm | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.32 MB
viewsbd.pdf
Tender Documents • 1.72 MB
viewnit.pdf
Additional Documents • 0.03 MB
BOQ_1448594.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .