Loading…
Loading…
Tender Value
₹7.3 L
EMD Value
₹14,700
Closing Date
7 Sept 2026, 4:00 pmClosed
Executive Engineer I-FC Division Kargil
Executive Engineer I-FC Division Kargil
Construction of water distribution tank and realignment/extension of raising main of lift irrigation scheme Das Deythang (Yokchoks)
2026_PWD_19456_1
e-Tender 19 of 2026-27/INFC Kargil
Open Tender
Civil Works - Canal
Works
60 days
Kargil
Please refer Tender documents.
4 documents required · 4 mandatory
₹80
Payable To Executive Engineer I-FC Division Kargil
₹14,700
7 Sept 2026
29 Aug 2026
8 Sept 2026
29 Aug 2026
7 Sept 2026
29 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in excavation by manual means in foundation trench or drains (not exceeding 1.5m in weadth or 10 sqm on plan )including dressing of sides and ramming of bottoms ,lift upto 1.5m ,including getting out the excavated soil and disposal of surplus excavated soil as directed ,within a lead of 50m | |||||
| 1.01 | All Kind of Soil 70% | 23.9 | Cum | 295.75 | ₹7,068.42 |
| 1.02 | Ordinary rocks 25% | 8.53 | Cum | 616.16 | ₹5,255.84 |
| 1.03 | Hard rocks B.P 5% | 1.71 | Cum | 1,398.01 | ₹2,390.6 |
| 2 | Dumping/filling of stone in horizontal on level including cost of stone | 0.97 | Sqm | 207.55 | ₹201.32 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level 1:3:6 (1 cement: 3 coarse sand (zone-III) derioved from natural sources: 6 graded stone aggregate 20mm nominal size derived from natural sources) | 0.41 | Cum | 5,243.49 | ₹2,149.83 |
| 4 | Reinforced cement concrete work in wall’s (any thickness) including attached pilasters, buttresses plinth and string courses, fillets columns, pillars piers, abutments, post and struts etc up to floor 5 level excluding cost of centering, shuttering, finishing and reinforcement 1:2:4 (1 cement 2 course sand and 4 graded crushed stone agg. 20mm nominal size. | 23.03 | Cum | 8,247.02 | ₹1,89,928.87 |
| 5 | Reinforcement for RCC works including straightening ,cutting,bending placing in position and binding and all complete.Hot Rolled deformed bars. | 1,704 | KG | 87.33 | ₹1,48,810.32 |
| 6 | Reinforced cement concrete work in wall’s (any thickness) including attached pilasters, buttresses plinth and string courses, fillets columns, pillars piers, abutments, post and struts etc up to floor 5 level excluding cost of centering, shuttering, finishing and reinforcement 1:2:4 (1 cement 2 course sand and 4 graded crushed stone agg. 20mm nominal size. | 6.44 | Cum | 8,247.07 | ₹53,111.13 |
| 7 | Providing and fixing of angle iron post/ flat iron & struts of required size including bottom to be split and bend at right angle in opposite direction for 10 cm length and drilling holes upto 10mm dia etc complete including carriage complete. | 50 | Kg | 123 | ₹6,150 |
stage.html
html • 0.01 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.50 MB
BOQ_46107.xls
BOQ • 0.46 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .