Assistant Executive Engineer,KIP RB Sub Dn.No,26 K
Assistant Executive Engineer,KIP RB Sub Dn.No,26 Karunagappally
Rectification work of Canal
2019_Irrig_331085_1
57/AEE/KIP/KPY/2019-20
Open Tender
Civil Works - Canal
Item Rate
120 days
Pallickal
Please refer Tender documents.
7 documents required · 7 mandatory
₹3,000
Yes
online
₹33,500
Yes
9 Mar 2020
20 Dec 2019
28 Dec 2019
20 Dec 2019
27 Dec 2019
20 Dec 2019
Amount
Scheme 1. Rectification of pallickal distributory lining of open canal from chainage 2575 m to 2609 m
od52147/2019_2020/P2 : Clearing grass and removal of the rubbish upto a distance of 50m outside the periphery of the area cleared and jungle including uprooting of rank vegetation,grass ,brush wood,trees and saplings of girth upto 30cm measured at a height of 1m above ground level and removal of rubbish upto a distance of 50m outside the periphery of the area cleared.
od52148/2019_2020/P2 : Earth work in rough excavation including disposal of excavated earth upto 50 m and lift upto 1.5m , disposed soil to be levelled and neatly dressed in all kinds of soil to be levelled and neatly dressed in all kinds of soil for clearing the canal bed by desilting as per the direction of the departmental officers at site
15.2.2 : Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 leaner mix ( including equivalent design mix)
od52150/2019_2020/P2 : C.C.1:4:7 using 20 mm brocken stone over existiing damaged portion of open canal to lines and re-lining of open canal etc.complete asper direction of Departmental officers at site Lining with cement concrete 1:4:7 as per the direction of the departmental officers at site
od52151/2019_2020/P2 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete
5.27 : Providing and filling in position bitumen mix filler of Proportion 80 kg of hot bitumen, 1 kg of cement and 0.25 cubic metre of coarse sand for expansion joints.
Scheme 2. Rectification of pallickal distributory lining of open canal between chainage 2609.m and 2643 m
od52146/2019_2020/P2 : Clearing the grass and removal of the rubbish upto a distance of 50m outside the peiphery of the area cleared and jungle including uprooting of rank vegetation, grass, brush wood, trees, and saplings of girth upto 30 cm measured at a height of 1m above ground level and removal of rubbish upto a distance of 50m outside the periphery of the area cleared
od52148/2019_2020/P2 : Earth work in rough excavation including disposal of excavated earth upto 50 m and lift upto 1.5m , disposed soil to be levelled and neatly dressed in all kinds of soil to be levelled and neatly dressed in all kinds of soil for clearing the canal bed by desilting
15.2.2 : Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 leaner mix ( including equivalent design mix)
od52150/2019_2020/P2 : C.C.1:4:7 using 20 mm brocken stone over existiing damaged portion of open canal to lines and re-lining of open canal etc.complete asper direction of Departmental officers at site Lining with cement concrete 1:4:7
od52151/2019_2020/P2 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc completeas per the direction of the departmental officers at site
5.27 : Providing and filling in position bitumen mix filler of Proportion 80 kg of hot bitumen, 1 kg of cement and 0.25 cubic metre of coarse sand for expansion joints.
Scheme 3. Rectification of pallickal distributory lining of open canal between chainage 2643 m and 2677 m
od52146/2019_2020/P2 : Clearing the grass and removal of the rubbish upto a distance of 50m outside the peiphery of the area cleared and jungle including uprooting of rank vegetation, grass, brush wood, trees, and saplings of girth upto 30 cm measured at a height of 1m above ground level and removal of rubbish upto a distance of 50m outside the periphery of the area cleared
od52149/2019_2020/P2 : Earth work in rough excavation including disposal of excavated earth up to 50 m and lift up to 1.5 m, disposed soil to be levelled and neatly dressed in all kinds of soil for clearing the canal bed by desilting
15.2.2 : Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 leaner mix ( including equivalent design mix)
od52150/2019_2020/P2 : C.C.1:4:7 using 20 mm brocken stone over existiing damaged portion of open canal to lines and re-lining of open canal etc.complete asper direction of Departmental officers at site Lining with cement concrete 1:4:7 as per the direction of the departmental officers at site
od52151/2019_2020/P2 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete as per the direction of the departmental officers at site
5.27 : Providing and filling in position bitumen mix filler of Proportion 80 kg of hot bitumen, 1 kg of cement and 0.25 cubic metre of coarse sand for expansion joints.
Scheme 4. Rectification of pallickal distributory lining of open canal between chainage 2677 m and 2711m
od52146/2019_2020/P2 : Clearing the grass and removal of the rubbish upto a distance of 50m outside the peiphery of the area cleared and jungle including uprooting of rank vegetation, grass, brush wood, trees, and saplings of girth upto 30 cm measured at a height of 1m above ground level and removal of rubbish upto a distance of 50m outside the periphery of the area cleared
od52148/2019_2020/P2 : Earth work in rough excavation including disposal of excavated earth upto 50 m and lift upto 1.5m , disposed soil to be levelled and neatly dressed in all kinds of soil to be levelled and neatly dressed in all kinds of soil for clearing the canal bed by desilting
15.2.2 : Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 leaner mix ( including equivalent design mix)
od52150/2019_2020/P2 : C.C.1:4:7 using 20 mm brocken stone over existiing damaged portion of open canal to lines and re-lining of open canal etc.complete asper direction of Departmental officers at site Lining with cement concrete 1:4:7as per the direction of the departmental officers at site
od52151/2019_2020/P2 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete as per the direction of the departmental officers at site
5.27 : Providing and filling in position bitumen mix filler of Proportion 80 kg of hot bitumen, 1 kg of cement and 0.25 cubic metre of coarse sand for expansion joints.
scheme 5: Rectification of pallickal distributory between chainage 2711 m and 2745 m
od52146/2019_2020/P2 : Clearing the grass and removal of the rubbish upto a distance of 50m outside the peiphery of the area cleared and jungle including uprooting of rank vegetation, grass, brush wood, trees, and saplings of girth upto 30 cm measured at a height of 1m above ground level and removal of rubbish upto a distance of 50m outside the periphery of the area cleared
od52149/2019_2020/P2 : Earth work in rough excavation including disposal of excavated earth up to 50 m and lift up to 1.5 m, disposed soil to be levelled and neatly dressed in all kinds of soil for clearing the canal bed by desilting
15.2.2 : Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 leaner mix ( including equivalent design mix)
od52150/2019_2020/P2 : C.C.1:4:7 using 20 mm brocken stone over existiing damaged portion of open canal to lines and re-lining of open canal etc.complete asper direction of Departmental officers at site Lining with cement concrete 1:4:7as per the direction of the departmental officers at site
od52151/2019_2020/P2 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete as per the direction of the departmental officers at site
5.27 : Providing and filling in position bitumen mix filler of Proportion 80 kg of hot bitumen, 1 kg of cement and 0.25 cubic metre of coarse sand for expansion joints.
scheme 6: Rectification of Pallickal distributory between chainage 3430 m and 3464 m
od52146/2019_2020/P2 : Clearing the grass and removal of the rubbish upto a distance of 50m outside the peiphery of the area cleared and jungle including uprooting of rank vegetation, grass, brush wood, trees, and saplings of girth upto 30 cm measured at a height of 1m above ground level and removal of rubbish upto a distance of 50m outside the periphery of the area cleared
od52148/2019_2020/P2 : Earth work in rough excavation including disposal of excavated earth upto 50 m and lift upto 1.5m , disposed soil to be levelled and neatly dressed in all kinds of soil to be levelled and neatly dressed in all kinds of soil for clearing the canal bed by desilting
15.2.2 : Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 leaner mix ( including equivalent design mix)
od52150/2019_2020/P2 : C.C.1:4:7 using 20 mm brocken stone over existiing damaged portion of open canal to lines and re-lining of open canal etc.complete asper direction of Departmental officers at site Lining with cement concrete 1:4:7as per the direction of the departmental officers at site
od52151/2019_2020/P2 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete as per the direction of the departmental officers at site
5.27 : Providing and filling in position bitumen mix filler of Proportion 80 kg of hot bitumen, 1 kg of cement and 0.25 cubic metre of coarse sand for expansion joints.
scheme 7: Rectification of Pallickal distributory between chainage 3464 m and 3498 m
od52146/2019_2020/P2 : Clearing the grass and removal of the rubbish upto a distance of 50m outside the peiphery of the area cleared and jungle including uprooting of rank vegetation, grass, brush wood, trees, and saplings of girth upto 30 cm measured at a height of 1m above ground level and removal of rubbish upto a distance of 50m outside the periphery of the area cleared
od52148/2019_2020/P2 : Earth work in rough excavation including disposal of excavated earth upto 50 m and lift upto 1.5m , disposed soil to be levelled and neatly dressed in all kinds of soil to be levelled and neatly dressed in all kinds of soil for clearing the canal bed by desilting
15.2.2 : Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 leaner mix ( including equivalent design mix)
od52150/2019_2020/P2 : C.C.1:4:7 using 20 mm brocken stone over existiing damaged portion of open canal to lines and re-lining of open canal etc.complete asper direction of Departmental officers at site Lining with cement concrete 1:4:7 as per the direction of the departmental officers at site
od52151/2019_2020/P2 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete as per the direction of the departmental officers at site
5.27 : Providing and filling in position bitumen mix filler of Proportion 80 kg of hot bitumen, 1 kg of cement and 0.25 cubic metre of coarse sand for expansion joints.
scheme 8: Rectification of Pallickal distributory between chainage 3498 m and 3532 m
od52146/2019_2020/P2 : Clearing the grass and removal of the rubbish upto a distance of 50m outside the peiphery of the area cleared and jungle including uprooting of rank vegetation, grass, brush wood, trees, and saplings of girth upto 30 cm measured at a height of 1m above ground level and removal of rubbish upto a distance of 50m outside the periphery of the area cleared
od52148/2019_2020/P2 : Earth work in rough excavation including disposal of excavated earth upto 50 m and lift upto 1.5m , disposed soil to be levelled and neatly dressed in all kinds of soil to be levelled and neatly dressed in all kinds of soil for clearing the canal bed by desilting
15.2.2 : Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 leaner mix ( including equivalent design mix)
od52150/2019_2020/P2 : C.C.1:4:7 using 20 mm brocken stone over existiing damaged portion of open canal to lines and re-lining of open canal etc.complete asper direction of Departmental officers at site Lining with cement concrete 1:4:7as per the direction of the departmental officers at site
od52151/2019_2020/P2 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete as per the direction of the departmental officers at site
5.27 : Providing and filling in position bitumen mix filler of Proportion 80 kg of hot bitumen, 1 kg of cement and 0.25 cubic metre of coarse sand for expansion joints.
scheme 9: Rectification of Pallickal distributory between chainage 3532 m and 3566 m
od52146/2019_2020/P2 : Clearing the grass and removal of the rubbish upto a distance of 50m outside the peiphery of the area cleared and jungle including uprooting of rank vegetation, grass, brush wood, trees, and saplings of girth upto 30 cm measured at a height of 1m above ground level and removal of rubbish upto a distance of 50m outside the periphery of the area cleared
od52148/2019_2020/P2 : Earth work in rough excavation including disposal of excavated earth upto 50 m and lift upto 1.5m , disposed soil to be levelled and neatly dressed in all kinds of soil to be levelled and neatly dressed in all kinds of soil for clearing the canal bed by desilting
15.2.2 : Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 leaner mix ( including equivalent design mix)
od52150/2019_2020/P2 : C.C.1:4:7 using 20 mm brocken stone over existiing damaged portion of open canal to lines and re-lining of open canal etc.complete asper direction of Departmental officers at site Lining with cement concrete 1:4:7as per the direction of the departmental officers at site
od52151/2019_2020/P2 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete as per the direction of the departmental officers at site
5.27 : Providing and filling in position bitumen mix filler of Proportion 80 kg of hot bitumen, 1 kg of cement and 0.25 cubic metre of coarse sand for expansion joints.
scheme 10: Rectification of Pallickal distributory between chainage 3566 m and 3600 m
od52146/2019_2020/P2 : Clearing the grass and removal of the rubbish upto a distance of 50m outside the peiphery of the area cleared and jungle including uprooting of rank vegetation, grass, brush wood, trees, and saplings of girth upto 30 cm measured at a height of 1m above ground level and removal of rubbish upto a distance of 50m outside the periphery of the area cleared
od52148/2019_2020/P2 : Earth work in rough excavation including disposal of excavated earth upto 50 m and lift upto 1.5m , disposed soil to be levelled and neatly dressed in all kinds of soil to be levelled and neatly dressed in all kinds of soil for clearing the canal bed by desilting
15.2.2 : Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 leaner mix ( including equivalent design mix)
od52150/2019_2020/P2 : C.C.1:4:7 using 20 mm brocken stone over existiing damaged portion of open canal to lines and re-lining of open canal etc.complete asper direction of Departmental officers at site Lining with cement concrete 1:4:7as per the direction of the departmental officers at site
od52151/2019_2020/P2 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete as per the direction of the departmental officers at site
5.27 : Providing and filling in position bitumen mix filler of Proportion 80 kg of hot bitumen, 1 kg of cement and 0.25 cubic metre of coarse sand for expansion joints.
Vinod m
Bidder Name
Vinod m
V. KRISHNANKUTTY
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_460426.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .